To require the Comptroller General of the United States to submit to Congress a report on maintenance of the E-8C Joint Surveillance Target Attack Radar System aircraft fleet.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Senate amendment proposed (on the floor): Amendment SA 3940 proposed by Senator McConnell for Senator Perdue to Amendment SA 3695.(consideration: CR S5901; text: CR S5901)
August 23, 2018
View full timeline
Senate amendment proposed (on the floor): Amendment SA 3940 proposed by Senator McConnell for Senator Perdue to Amendment SA 3695.(consideration: CR S5901; text: CR S5901)
August 23, 2018
Senate amendment agreed to: Amendment SA 3940 agreed to in Senate by Unanimous Consent.
August 23, 2018
Amendment SA 3940 proposed by Senator McConnell for Senator Perdue to Amendment SA 3695. (consideration: CR S5901; text: CR S5901) To require the Comptroller General of the United States to submit to Congress a report on maintenance of the E-8C Joint Surveillance Target Attack Radar System aircraft fleet.
August 23, 2018
Amendment SA 3940 agreed to in Senate by Unanimous Consent.
August 23, 2018
Senate amendment submitted
August 22, 2018
Text
Submitted
SA 3940. Mr. PERDUE (for himself and Mr. Isakson) submitted an amendment intended to be proposed to amendment SA 3695 proposed by Mr. Shelby to the bill H.R. 6157, making appropriations for the Department of Defense for the fiscal year ending September 30, 2019, and for other purposes; which was ordered to lie on the table; as follows: At the appropriate place in title VIII of division A, insert the following: Sec. ___. Not later than January 31, 2019, the Comptroller General of the United States shall submit to the congressional defense committees a report-- (1) comparing the cost expenditures of organic industrial depot maintenance of the E-8C Joint Surveillance Target Attack Radar System aircraft fleet versus contracted or non- organic maintenance; and (2) comparing the cost variance and cost savings of different programmed depot maintenance cycles or procedures for the E-8C, including comparisons to such other platforms as the Comptroller General considers appropriate. ______