S.Amdt. 561Senate115th Congress (2017-2019)
S.Amdt. 561
Sponsored by
Sen. Orrin G. Hatch (R-UT)
Submitted July 27, 2017
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
July 27, 2017
Text
Submitted
SA 561. Mr. HATCH submitted an amendment intended to be proposed by him to the bill H.R. 2810, to authorize appropriations for fiscal year 2018 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: At the appropriate place, insert the following: SEC. ___. ROBOTIC SERVICING OF GEOSYNCHRONOUS SATELLITES DEVELOPMENT PROGRAM ACCOUNTABILITY MATRICES. (a) Submission of Matrices.--Concurrent with the submission of the budget of the President to Congress under section 1105(a) of title 31, United States Code, for fiscal year 2019, the Director of the Defense Advanced Research Projects Agency shall submit to the congressional defense committees and the Comptroller General of the United States the matrices described in subsection (b) relating to the Robotic Servicing of Geosynchronous Satellites program. (b) Matrices Described.--The matrices described in this subsection are the following: (1) Development goals.--A matrix that identifies, in six- month increments, key milestones, development events, and specific performance goals for the Robotic Servicing of Geosynchronous Satellites program, which shall be subdivided, at a minimum, according to the following: (A) Technology readiness levels of major components and key demonstration events. (B) Design maturity. (C) Software maturity. (D) Manufacturing readiness levels for critical manufacturing operations and key demonstration events. (E) Manufacturing operations. (F) System verification and key flight test events. (G) Reliability. (2) Total cost.--A matrix expressing, in six-month increments, the total cost to the Department of Defense and all relevant United States Government agencies cost position for the payload, operations software, payload integration, and launch for the Robotic Servicing of Geosynchronous Satellites program. (3) Spacecraft cots.--A matrix expressing, in six-month increments, the total cost for Robotic Servicing of Geosynchronous Satellites program spacecraft and relevant subsystem completion, which shall be phased over the entire development period and subdivided according to the costs of the following: (A) Spacecraft. (B) Payload. (C) Mission systems. (D) Vehicle software. (E) Systems engineering. (F) Program management. (G) System test and evaluation. (H) Support and training systems. (I) Contract fee. (J) Engineering changes. (K) Direct mission support. (L) Launch. (M) Government testing. (c) Semiannual Update of Matrices.-- (1) In general.--The Director shall submit to the congressional defense committees and the Comptroller General of the United States updates to the matrices described in subsection (b)-- (A) not later than 180 days after the date on which the Director submits the matrices required by subsection (a); (B) concurrent with the submission of the budget of the President to Congress under section 1105(a) of title 31, United States Code, for fiscal year 2020 and each fiscal year thereafter; and (C) not later than 180 days after each such submission. (2) Elements.--Each update submitted under paragraph (1) shall detail progress made toward the goals identified in the matrix described in subsection (b)(1) and provide updated cost estimates. (3) Treatment of initial matrices as baseline.--The matrices submitted pursuant to subsection (a) shall be treated as the baseline for the full research, development, test, and evaluation of the Robotic Servicing of Geosynchronous Satellites program and through its launch and demonstration for purposes of the updates submitted pursuant to paragraph (1). (d) Assessment by Comptroller General of the United States.--Not later than the date that is 45 days after the date on which the Comptroller General of the United States receives an update to a matrix under subsection (c)(1), the Comptroller General shall review the sufficiency of the matrix and submit to the congressional defense committees an assessment of the matrix and an identification of cost, schedule, or performance trends in the matrix. (e) Secretary of Defense Approval.--Following the demonstration of the Robotic Servicing of Geosynchronous Satellites spacecraft and its transition to a commercial partner of the Defense Advanced Research Projects Agency, the Secretary of Defense shall approve each commercial operation of the spacecraft after-- (1) taking into account-- (A) available fuel for possible national security mission requirements; (B) orbitology relative to possible national security mission requirements; and (C) compliance with the Presidential Decision Directive on National Space Policy; and (2) certifying to the congressional defense committees that-- (A) any commercial use does not conflict with possible national security requirements; and (B) the requirements of this subsection have been met. (f) Secretary of Defense Study.--Concurrent with the submission of the budget of the President to Congress under section 1105(a) of title 31, United States Code, for fiscal year 2019, the Secretary of Defense shall submit to the congressional defense committees a report on the technology transfer of the robotic payload, operations software, and corresponding systems of the Robotic Servicing of Geosynchronous Satellites program to qualified satellite manufacturers and satellite operators to increase the on- orbit highly advanced space robotics capabilities of entities organized under the laws of the United States and available to the Department of Defense. ______