S.Amdt. 1473Senate117th Congress (2021-2023)2nd degree
S.Amdt. 1473
Sponsored by
Sen. Roy Blunt (R-MO)
Submitted April 28, 2021
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
April 28, 2021
Text
Submitted
SA 1473. Mr. BLUNT submitted an amendment intended to be proposed to amendment SA 1460 proposed by Mr. Carper (for himself and Mrs. Capito) to the bill S. 914, to amend the Safe Drinking Water Act and the Federal Water Pollution Control Act to reauthorize programs under those Acts, and for other purposes; which was ordered to lie on the table; as follows: At the appropriate place, insert the following: SEC. ___. SELECTION CRITERIA. (a) In General.--Section 5028(b) of the Water Infrastructure Finance and Innovation Act of 2014 (33 U.S.C. 3907(b)) is amended-- (1) in paragraph (2), by adding at the end the following: ``(L) The extent to which a project considers collaborative project delivery methods that-- ``(i) reduce overall project costs; ``(ii) reduce the contribution of Federal grant assistance; ``(iii) enable the project to proceed at an earlier date than the project would otherwise be able to proceed; ``(iv) mitigate environmental impacts; or ``(v) result in such other benefits as the collaborative project delivery methods may provide.''; and (2) in paragraph (3), by striking ``(K)'' and inserting ``(L)''. (b) Definitions.--Section 5022 of the Water Infrastructure Finance and Innovation Act of 2014 (33 U.S.C. 3901) is amended-- (1) by redesignating paragraphs (2) through (15) as paragraphs (3) through (16), respectively; and (2) by inserting after paragraph (1) the following: ``(2) Collaborative project delivery method.-- ``(A) In general.--The term `collaborative project delivery method' means a method for procuring and delivering a capital project that involves close collaboration among the owner of the project, the designer of the project, and the contractor for the project from design through completion, including a construction management at-risk method and a design-build method. ``(B) Associated definitions.-- ``(i) Construction management at-risk method.--The term `construction management at-risk method' means a delivery method in which the owner of a project retains an engineering firm and a construction management at-risk firm under 2 separate contracts for design and construction, respectively. ``(ii) Design-build method.--The term `design-build method' means a delivery method under which the owner of a project enters into a single contract with a design-builder to design, seek permits for, construct, test, and commission a project.''. ______