S.Amdt. 2426Senate117th Congress (2021-2023)2nd degree
S.Amdt. 2426
Sponsored by
Sen. Marco Rubio (R-FL)
Submitted August 3, 2021
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
August 3, 2021
Text
Submitted
SA 2426. Mr. RUBIO (for himself and Mr. Kelly) submitted an amendment intended to be proposed to amendment SA 2137 proposed by Mr. Schumer (for Ms. Sinema (for herself, Mr. Portman, Mr. Manchin, Mr. Cassidy, Mrs. Shaheen, Ms. Collins, Mr. Tester, Ms. Murkowski, Mr. Warner, and Mr. Romney)) to the bill H.R. 3684, to authorize funds for Federal-aid highways, highway safety programs, and transit programs, and for other purposes; which was ordered to lie on the table; as follows: On page 2010, line 6, insert ``pursuant to section 516(b)(1)'' after ``assessment''. On page 2010, line 11, insert ``pursuant to section 516(b)(1)'' after ``assessment''. On page 2010, line 14, insert ``to the Administrator'' after ``appropriated''. On page 2010, strike line 16 and insert the following: available until expended. ``(c) Funding.--Each fiscal year, a State may reserve up to 0.5 percent of the sums allotted to the State under this title for the fiscal year to carry out activities under section 516(b)(1)(B).''. On page 2014, between lines 10 and 11, insert the following: SEC. 502__. REPORTS TO CONGRESS. Section 516(b)(1) of the Federal Water Pollution Control Act (33 U.S.C. 1375(b)(1)) is amended by striking ``(B) a detailed estimate, biennially revised, of the cost of construction of all needed publicly owned treatment works in all of the States and of the cost of construction of all needed publicly owned treatment works in each of the States;'' and inserting ``(B) a detailed estimate, biennially revised, of the cost of construction of all planned publicly owned treatment works in all of the States and all needed publicly owned treatment works in all of the States, and the cost of construction of all planned publicly owned treatment works in each of the States and all needed publicly owned treatment works in each of the States, which shall include (i) the cost of construction to rehabilitate or upgrade all existing publicly owned treatment works (excluding any pipe or other device or system for the conveyance of wastewater), every 20 years, including the costs to implement measures necessary to address the resilience and sustainability of publicly owned treatment works to manmade or natural disasters and (ii) the cost of construction to replace 10 percent of existing publicly owned pipes and other devices and systems for the conveyance of wastewater to such treatment works over the 20-year period following the date of the estimate;''. [[Page S5774]] ______