S.Amdt. 4193Senate117th Congress (2021-2023)2nd degree
S.Amdt. 4193
Sponsored by
Sen. John Thune (R-SD)
Submitted November 2, 2021
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Floor
Latest Action
Senate amendment submitted
November 2, 2021
Text
Submitted
SA 4193. Mr. THUNE submitted an amendment intended to be proposed to amendment SA 3867 submitted by Mr. Reed and intended to be proposed to the bill H.R. 4350, to authorize appropriations for fiscal year 2022 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows: At the end of subtitle C of title XV, add the following: SEC. 1548. ENERGY RESILIENCY FOR CERTAIN NUCLEAR MISSIONS. (a) Authorization.--The Assistant Secretary of the Air Force for Installations, Environment, and Energy shall invest in the resiliency and redundancy of the electricity supply of covered Air Force installations for the purpose of supporting the critical mission capability of those installations during a failure of the electric grid, a cyberattack, or a natural disaster. (b) Request for Proposals for Electricity Storage.-- (1) In general.--Not later than 180 days after the date of the enactment of this Act, the Assistant Secretary shall issue a request for proposals for the installation of not less than 2,000 kWh of electricity storage at each covered Air Force installation. (2) Requirements.--The request for proposals under paragraph (1) shall specify the following: (A) The electricity storage described in paragraph (1) shall be available to immediately support the nuclear mission of the covered Air Force installation in the event of a power failure. (B) The use of the electricity storage shall be prioritized for the nuclear mission in the event of a power failure until electricity is restored. (C) The electricity storage may be used to partially meet energy demand at the installation during times of high energy demand and high energy prices, commonly known as ``peak shaving''. (c) Request for Proposals for Secondary Energy Sources.-- (1) In general.--Not later than one year after the date of the enactment of this Act, the Assistant Secretary shall issue a request for proposals for the installation of, or grid connection to, a secondary source of energy to power land-based nuclear missions of covered Air Force installations in the event of a disruption of the primary electricity supply. (2) Requirements.--The request for proposals under paragraph (1) shall specify the following: (A) Secondary sources of energy described in paragraph (1) may include sources of generation on a covered Air Force installation, such as natural gas or liquid fuel generators, connections to an electric grid separate from the primary energy provider, and renewable energy paired with storage separate from storage provided pursuant to subsection (b). (B) The use of secondary sources of energy shall be prioritized to sustain the nuclear mission and to support other functions of the covered Air Force installation in the event of an electric power disruption. (C) A secondary source of energy may be utilized to power commercial utility operations as required by the energy provider in times in which there is not an energy disruption affecting the nuclear mission of the covered Air Force installation, if doing so does not diminish the ability of the secondary source to provide emergency power. (d) Definitions.--In this section: (1) Covered air force installation.--The term ``covered Air Force installation'' means an Air Force installation that hosts or is planned to host an operational nuclear mission that is a component of the land-based leg of the nuclear triad, particularly nuclear-capable bombers. (2) Emergency power.--The term ``emergency power'' means any electricity necessary to operate the nuclear mission of a covered Air Force installation the event of disruption of the primary electricity supply. ______