II
110th CONGRESS
1st Session
S. 2384
IN THE SENATE OF THE UNITED STATES
November 16, 2007
Mr. Salazar introduced the following bill; which was read twice and referred to the Committee on Environment and Public Works
A BILL
To authorize the Chief of Engineers to conduct a feasibility study relating to the construction of a multipurpose project in the Fountain Creek watershed located in the State of Colorado.
Short title
This Act may be cited as
the Fountain Creek Watershed
Feasibility Study Act of 2007
.
Definitions
In this Act:
State
The term State means the State of Colorado.
Watershed
The term watershed means the Fountain Creek watershed that is located in the State.
Feasibility study relating to the watershed
Study
In general
Not later than 2 years after the date of enactment of this Act, the Chief of Engineers shall complete a study to determine the feasibility of constructing a multipurpose project that shall—
be located in the watershed;
consist of—
1 or more dams or other structures, other facilities, or management activities; or
1 or more other reservoirs that are to be located on-channel or off-channel of the watershed; and
with respect to the area that is located in the watershed and the Arkansas River Valley of the State, and any residential or commercial activity in the watershed and the Arkansas River Valley of the State, be designed—
to provide more reliable flood control;
to provide better sediment control;
to increase the supply of water through the reuse of water or other means;
to improve the quality of water; and
to conserve fish and wildlife that are, and preserve the ecosystem that is, located in close proximity to the location of the project.
Consideration of prior reports
In conducting the study under paragraph (1), the Chief of Engineers shall take into consideration—
the report
entitled Supplemental Report on Fountain Reservoir and Reevaluation of
Report on Review Survey for Flood Control and Allied Purposes, Arkansas River
and Tributaries Above John Martin Dam, Colorado
, prepared by the Corps
of Engineers, and dated May 15, 1970; and
the study
entitled, The Fountain Creek Watershed Study
, prepared by the
Corps of the Engineers.
Effect on other studies
In conducting the study under paragraph (1), the Chief of Engineers shall conduct the study independently from, and shall not affect any other study relating to—
the Fountain Creek watershed;
the Fryingpan-Arkansas Project of the State; or
the proposed Southern Delivery System Project.
Report
Not later than 60 days after the date on which the Chief of Engineers completes the feasibility study under subsection (a), the Chief of Engineers shall submit to the President, the President pro tempore of the Senate, and the Speaker of the House of Representatives, a report that describes the results of the study.