H.R. 5625House111th Congress (2009-2011)In Committee

Permanent Prevention of Asian Carp Act of 2010

Sponsored by Dave CampRep. Dave Camp (R-MI)
Introduced June 29, 2010

Legislative Activity

Stay on top of the latest movement without scrolling through every action

2 earlier actions
HouseCommittee Latest Action

Referred to the Subcommittee on Water Resources and Environment.

June 30, 2010

View full timeline
HouseIntro Referral

Introduced in House

June 29, 2010

HouseIntro Referral

Referred to the House Committee on Transportation and Infrastructure.

June 29, 2010

HouseCommittee

Referred to the Subcommittee on Water Resources and Environment.

June 30, 2010

Floor Debate

1 member

What members said about H.R. 5625 on the floor

1 Republican
Candice S. Miller
Rep. Candice S. MillerR-MI-10 · Dec 3, 2010

Madam Speaker, I rise today in support of S. 1421, The Asian Carp Prevention and Control Act. This bill bans the importation of bighead carp, more commonly known as ``Asian carp.'' These fish have…

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in HouseIssued June 29, 2010

I

111th CONGRESS

2d Session

H. R. 5625

IN THE HOUSE OF REPRESENTATIVES

June 29, 2010

Mr. Camp (for himself, Mr. Upton, Mr. Rogers of Michigan, Ms. Kilpatrick of Michigan, Mr. Ehlers, Mrs. Miller of Michigan, Mr. Dingell, Mr. Kildee, Mr. Levin, Mr. Hoekstra, Mr. Peters, Mr. McCotter, Mr. Stupak, and Mr. Schauer) introduced the following bill; which was referred to the Committee on Transportation and Infrastructure

A BILL

To require the Secretary of the Army to study the feasibility of the hydrological separation of the Great Lakes and Mississippi River Basins.

1.

Short title

This Act may be cited as the Permanent Prevention of Asian Carp Act of 2010.

2.

Definitions

In this Act:

(1)

CAWS

The term CAWS means the Chicago Area Water System.

(2)

Hydrological separation

The term hydrological separation means a physical separation on the CAWS that—

(A)

would disconnect the Mississippi River from Lake Michigan; and

(B)

shall be designed to be adequate in scope to prevent the transfer of aquatic species between each water basin.

(3)

Secretary

The term Secretary means the Secretary of the Army, acting through the Chief of Engineers.

(4)

Study

The term study means the study described in section 3(a).

3.

Feasibility study

(a)

In general

Not later than 30 days after the date of enactment of this Act, the Secretary, pursuant to section 206 of the Flood Control Act of 1958 (Public Law 85–500; 72 Stat. 317), shall study the watersheds of the following rivers (including the tributaries of the rivers) that drain directly into Lake Michigan:

(1)

The Illinois River, at and in the vicinity of Chicago, Illinois.

(2)

The Chicago River in the State of Illinois.

(3)

The Calumet River in the States of Illinois and Indiana.

(b)

Purpose of study

The purpose of the study shall be to determine the feasibility and best means of implementing the hydrological separation of the Great Lakes and Mississippi River Basins to prevent the introduction or establishment of populations of aquatic nuisance species between the Great Lakes and Mississippi River Basins through the CAWS and other aquatic pathways.

(c)

Requirements of study

(1)

Options

The study shall include options to address—

(A)

flooding;

(B)

Chicago wastewater and stormwater infrastructure;

(C)

waterway safety operations; and

(D)

barge and recreational vessel traffic alternatives, which shall include—

(i)

examining other modes of transportation for cargo and CAWS users; and

(ii)

creating engineering designs to move canal traffic from 1 body of water to another body of water without transferring aquatic species.

(2)

Cost-benefit analysis

The study shall contain a detailed analysis of the environmental benefits and costs of each option described in paragraph (1).

(3)

Association with other study

The study shall be conducted in association with the study required under section 3061(d) of the Water Resources Development Act of 2007 (121 Stat. 1121).

(4)

Consultation

The Secretary shall consult with any relevant expert or stakeholder knowledgeable on the issues of hydrological separation and aquatic nuisance species.

(d)

Deadline

The Secretary shall complete the study by the date that is 18 months after the date of enactment of this Act.

4.

Report

(a)

In general

The Secretary shall prepare a report on the waterways described in section 3(a) in accordance with—

(1)

the purpose described in section 3(b); and

(2)

each requirement described in section 3(c).

(b)

Deadlines

The Secretary shall submit to Congress and the President—

(1)

not later than 180 days after the date of enactment of this Act, an initial report under this section;

(2)

not later than 1 year after the date of enactment of this Act, a second report under this section; and

(3)

not later than 18 months after the date of enactment of this Act, a final report under this section.

5.

Federal cost requirement

The Secretary shall carry out this Act at Federal expense.

6.

Presidential oversight

The President, or the Council on Environmental Quality as a designee of the President, shall oversee the study to ensure the thoroughness and timely completion of the study.