S. 3993Senate111th Congress (2009-2011)In Committee

Geothermal Production Expansion Act of 2010

A bill to expand geothermal production, and for other purposes.

Sponsored by Ron WydenSen. Ron Wyden (D-OR)
Introduced December 1, 2010

Legislative Activity

Stay on top of the latest movement without scrolling through every action

2 earlier actions
SenateIntro Referral Latest Action

Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S8349-8350)

December 1, 2010

View full timeline
SenateIntro Referral

Introduced in Senate

December 1, 2010

SenateIntro Referral

Sponsor introductory remarks on measure. (CR S8349)

December 1, 2010

SenateIntro Referral

Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S8349-8350)

December 1, 2010

Floor Debate

2 members

What members said about S. 3993 on the floor

1 Republican1 Democrat
Olympia J. Snowe
Sen. Olympia J. SnoweR-ME · Dec 1, 2010

Mr. President, I rise today, along with Senator Warner, to introduce pro-consumer wireless legislation, which will improve wireless coverage and go a long way toward preventing the annoying dropped…

Ron Wyden
Sen. Ron WydenD-OR · Dec 1, 2010

Mr. President, I am pleased to join with my colleagues from Idaho and Oregon, Senator James Risch, Senator Mike Crapo, and Senator Jeff Merkley, in introducing the Geothermal Production Expansion Act…

Ron Wyden
Sen. Ron WydenD-OR · Dec 1, 2010

Mr. President, I am pleased to join with my colleagues from Idaho and Oregon, Senator James Risch, Senator Mike Crapo, and Senator Jeff Merkley, in introducing the Geothermal Production Expansion Act…

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in SenateIssued December 1, 2010

II

111th CONGRESS

2d Session

S. 3993

IN THE SENATE OF THE UNITED STATES

December 1, 2010

Mr. Wyden (for himself, Mr. Risch, Mr. Crapo, and Mr. Merkley) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources

A BILL

To expand geothermal production, and for other purposes.

1.

Short title

This Act may be cited as the Geothermal Production Expansion Act of 2010.

2.

Findings

Congress finds that—

(1)

it is in the best interest of the United States to develop clean renewable geothermal energy;

(2)

development of that energy should be promoted on appropriate Federal land;

(3)

under the Energy Policy Act of 2005 (42 U.S.C. 15801 et seq.), the Bureau of Land Management is authorized to issue 3 different types of noncompetitive leases for production of geothermal energy on Federal land, including—

(A)

noncompetitive geothermal leases to mining claim holders that have a valid operating plan;

(B)

direct use leases; and

(C)

leases on parcels that do not sell at a competitive auction;

(4)

Federal geothermal energy leasing activity should be directed toward persons seeking to develop the land as opposed to persons seeking to speculate on geothermal resources and artificially raising the cost of legitimate geothermal energy development;

(5)

developers of geothermal energy on Federal land that have invested substantial capital and made high risk investments should be allowed to secure a discovery of geothermal energy resources; and

(6)

successful geothermal development on Federal land will provide increased revenue to the Federal Government, with the payment of production royalties over decades.

3.

Noncompetitive leasing of adjoining areas for development of geothermal resources

Section 4(b) of the Geothermal Steam Act of 1970 (30 U.S.C. 1003(b)) is amended by adding at the end the following:

(4)

Adjoining land

(A)

Definitions

In this paragraph:

(i)

Fair market value per acre

The term fair market value per acre means a dollar amount per acre that—

(I)

except as provided in this clause, shall be equal to the market value per acre as determined by the Secretary under regulations issued under this paragraph;

(II)

shall be determined by the Secretary with respect to a lease under this paragraph, by not later than the end of the 90-day period beginning on the date the Secretary receives an application for the lease; and

(III)

shall be not less than the greater of—

(aa)

4 times the median amount paid per acre for all land leased under this Act during the preceding year; or

(bb)

$50.

(ii)

Industry standards

The term industry standards means the standards by which a qualified geothermal professional assesses whether downhole or flowing temperature measurements with indications of permeability are sufficient to produce energy from geothermal resources, as determined through flow or injection testing or measurement of lost circulation while drilling.

(iii)

Qualified Federal land

The term qualified Federal land means land that is otherwise available for leasing under this Act.

(iv)

Qualified geothermal professional

The term qualified geothermal professional means an individual who is an engineer or geoscientist in good professional standing with at least 5 years of experience in geothermal exploration, development, or project assessment.

(v)

Qualified lessee

The term qualified lessee means a person that may hold a geothermal lease under part 3202.10 of title 43, Code of Federal Regulations, as in effect on the date of enactment of the Geothermal Production Expansion Act of 2010.

(vi)

Valid discovery

The term valid discovery means a discovery of a geothermal resource by a new or existing slim hole or production well, that exhibits downhole or flowing temperature measurements with indications of permeability that are sufficient to meet industry standards.

(B)

Authority

An area of qualified Federal land that adjoins other land for which a qualified lessee holds a legal right to develop geothermal resources may be available for a noncompetitive lease under this section to the qualified lessee at the fair market value per acre, if—

(i)

the area of qualified Federal land—

(I)

consists of not less than 1 acre and not more than 640 acres; and

(II)

is not already leased under this Act or nominated to be leased under subsection (a);

(ii)

the qualified lessee has not previously received a noncompetitive lease under this paragraph in connection with the valid discovery for which data has been submitted under clause (iii)(I); and

(iii)

sufficient geological and other technical data prepared by a qualified geothermal professional has been submitted by the qualified lessee to the applicable Federal land management agency that would lead individuals who are experienced in the subject matter to believe that—

(I)

there is a valid discovery of geothermal resources on the land for which the qualified lessee holds the legal right to develop geothermal resources; and

(II)

that thermal feature extends into the adjoining areas.

(C)

Determination of fair market value

(i)

In general

The Secretary shall—

(I)

publish a notice of any request to lease land under this paragraph;

(II)

determine fair market value for purposes of this paragraph in accordance with procedures for making those determinations that are established by regulations issued by the Secretary;

(III)

provide to a qualified lessee and publish any proposed determination under this subparagraph of the fair market value of an area that the qualified lessee seeks to lease under this paragraph;

(IV)

provide to the qualified lessee the opportunity to appeal the proposed determination during the 30-day period beginning on the date that the proposed determination is provided to the qualified lessee; and

(V)

provide to any interested member of the public the opportunity to appeal the proposed determination in accordance with the process established under parts 4 and 1840, and section 3200.5, of title 43, Code of Federal Regulations (as in effect on the date of enactment of the Geothermal Production Expansion Act of 2010) during the 30-day period beginning on the date that the proposed determination is published.

(ii)

Limitation on nomination

After publication of a notice of request to lease land under this paragraph, the Secretary may not accept under subsection (a) any nomination of the land for leasing unless the request has been denied or withdrawn.

(D)

Regulations

Not later than 180 days after the date of enactment of the Geothermal Production Expansion Act of 2010, the Secretary shall issue regulations to carry out this paragraph.

.