H.R. 5831House112th Congress (2011-2013)In Committee

Levee Vegetation Review Act of 2012

Introduced May 18, 2012

Legislative Activity

Stay on top of the latest movement without scrolling through every action

2 earlier actions
HouseCommittee Latest Action

Referred to the Subcommittee on Water Resources and Environment.

May 21, 2012

View full timeline
HouseIntro Referral

Introduced in House

May 18, 2012

HouseIntro Referral

Referred to the House Committee on Transportation and Infrastructure.

May 18, 2012

HouseCommittee

Referred to the Subcommittee on Water Resources and Environment.

May 21, 2012

Floor Debate

11 members

What members said about H.R. 5831 on the floor

5 Republicans6 Democrats
Peter J. Visclosky
Rep. Peter J. ViscloskyD-IN-1 · May 31, 2012

Mr. Chairman, I yield myself such time as I may consume. I would like to begin by expressing my appreciation to Chairman Frelinghuysen for his efforts to be inclusive and transparent in drafting this…

Rodney P. Frelinghuysen
Rep. Rodney P. FrelinghuysenR-NJ-11 · May 31, 2012

Mr. Speaker, I ask unanimous consent that all Members may have 5 legislative days in which to revise and extend their remarks and to include extraneous material on H.R. 5325, and that I may include…

Robert E. Andrews
Rep. Robert E. AndrewsD-NJ-1 · May 31, 2012

I congratulate my colleague from New Jersey and you, Mr. Visclosky, for your very diligent and focused work on this bill. I know it was difficult. Mr. Chairman, we thank these Members for their…

Harold Rogers
Rep. Harold RogersR-KY-5 · May 31, 2012

I thank the chairman for that generous offer. Mr. Chairman, this is a good bill. It is a hard-fought bill. It is a tough bill, and I want to commend the chairman and the ranking member for their hard…

Norman D. Dicks
Rep. Norman D. DicksD-WA-6 · May 31, 2012

Mr. Chairman, first of all I would like to commend Chairman Frelinghuysen, whom I've enjoyed working with both here and on the Defense Subcommittee, and Ranking Member Visclosky on their efforts to…

Show 6 more
Mike Thompson
Rep. Mike ThompsonD-CA-1 · May 31, 2012

I thank the gentleman for yielding, and I rise for the purpose of entering into a colloquy. I also want to thank the chairman and his staff, the ranking member and his staff for the help that they've…

Doris O. Matsui
Rep. Doris O. MatsuiD-CA-5 · May 31, 2012

Mr. Chairman, I rise to engage in a colloquy with the distinguished chairman and ranking member of the Subcommittee on Energy and Water, Mr. Frelinghuysen and Mr. Visclosky, on the Army Corps of…

Steve Womack
Rep. Steve WomackR-AR-3 · May 31, 2012

I want to thank the chairman of our committee and the ranking member, Mr. Visclosky, for their great leadership. As has been mentioned in the limited discussion we've had already, great kudos have…

Andy Harris
Rep. Andy HarrisR-MD-1 · May 31, 2012

Mr. Chairman, I rise with my colleague from New Jersey to discuss the funding provided to the Department of Energy for unconventional fossil energy research and development. I first want to commend…

Charles W. Boustany, Jr.
Rep. Charles W. Boustany, Jr.R-LA-7 · May 31, 2012

Mr. Chairman, I want to thank the chairman of the subcommittee and the chairman of the full committee for working with me to try to rectify a problem with the Harbor Maintenance Trust Fund and the…

Zoe Lofgren
Rep. Zoe LofgrenD-CA-16 · May 31, 2012

Mr. Chairman, I would like to give special thanks to Mr. Visclosky and his staff, as well as Congressman Dicks and his staff, for their tremendous support for fusion energy in this bill. I would like…

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in HouseIssued May 18, 2012

I

112th CONGRESS

2d Session

H. R. 5831

IN THE HOUSE OF REPRESENTATIVES

May 18, 2012

Ms. Matsui (for herself, Mr. Garamendi, Mr. George Miller of California, Mrs. Napolitano, Mr. Daniel E. Lungren of California, Mr. Gary G. Miller of California, Mr. Calvert, Ms. Zoe Lofgren of California, Ms. Speier, Mrs. Capps, Mr. Thompson of California, Mr. Waxman, Mr. Honda, Ms. Eshoo, Ms. Hahn, Ms. Chu, Ms. Woolsey, Mr. McNerney, Mr. Baca, Ms. Linda T. Sánchez of California, Ms. Roybal-Allard, Mr. Cardoza, Mr. Costa, Ms. Lee of California, Mr. Berman, Mr. Farr, Mr. Schiff, Ms. Bass of California, Mr. Stark, Mrs. Davis of California, and Ms. Loretta Sanchez of California) introduced the following bill; which was referred to the Committee on Transportation and Infrastructure

A BILL

To direct the Secretary of the Army to undertake a comprehensive review of the Corps of Engineers policy guidelines on vegetation management for levees, and for other purposes.

1.

Short title

This Act may be cited as the Levee Vegetation Review Act of 2012.

2.

Flood control policy

(a)

Review

In order to determine whether current Federal policy relating to levee vegetation is appropriate for all regions of the United States, the Secretary of the Army shall undertake a comprehensive review of the Corps of Engineers policy guidelines on vegetation management for levees (in this section referred to as the guidelines). The Secretary shall commence the review not later than 6 months after the date of enactment of this Act.

(b)

Factors

(1)

In general

In conducting the review, the Secretary shall examine the guidelines in view of—

(A)

the varied interests and responsibilities in managing flood risks, including the need to provide the greatest levee safety benefit with limited resources;

(B)

preserving, protecting, and enhancing natural resources, including the potential benefit that vegetation on levees can have in providing habitat for species of concern;

(C)

protecting the rights of Native Americans pursuant to treaties and statutes; and

(D)

such other factors as the Secretary considers appropriate.

(2)

Regional and watershed considerations

In conducting the review, the Secretary shall specifically consider factors that promote and allow for consideration of potential variances from national guidelines on a regional or watershed basis. Such factors may include regional or watershed soil conditions, hydrologic factors, vegetation patterns and characteristics, environmental resources, levee performance history, institutional considerations, and other relevant factors. The scope of a variance approved by the Secretary may include an exemption to national guidelines where appropriate.

(c)

Cooperation and consultation; recommendations

(1)

In general

The review shall be undertaken in cooperation with interested Federal agencies and in consultation with interested representatives of State and local governments, Native American Indian tribes, appropriate nongovernmental organizations, and the public.

(2)

Recommendations

Corps of Engineers Regional Integration Teams, representing districts, divisions, and headquarters, in consultation with State and Federal resources agencies, and with participation by local agencies, shall recommend to the Chief of Engineers vegetation management policies for levees that conform with State and Federal laws and other applicable requirements.

(d)

Peer review

(1)

Views of National Academy of Engineering

As part of the review, the Secretary shall solicit and consider the views of the National Academy of Engineering on the engineering, environmental, and institutional considerations underlying the guidelines.

(2)

Availability of views

The views of the National Academy of Engineering obtained under paragraph (1) shall be—

(A)

made available to the public; and

(B)

included in supporting materials issued in connection with the revised guidelines required under subsection (e).

(e)

Revision of guidelines

(1)

In general

Not later than 2 years after the date of enactment of this Act, the Secretary shall—

(A)

revise the guidelines based on the results of the review, including the results of the peer review conducted under subsection (d); and

(B)

submit to Congress a report that contains a summary of the activities of the Secretary and a description of the findings of the Secretary under this section.

(2)

Content; incorporation into manual

The revised guidelines shall—

(A)

provide a practical process for approving regional or watershed variances from the national guidelines, reflecting due consideration of measures to maximize public safety benefits with limited resources, regional climatic variations, environmental quality, implementation challenges, and allocation of responsibilities; and

(B)

be incorporated into the manual proposed under section 5(c) of the Act entitled An Act authorizing the construction of certain public works on rivers and harbors for flood control, and for other purposes, approved August 18, 1941 (33 U.S.C. 701n(c)).

(f)

Continuation of work

Concurrent with completion of the requirements of this section, the Secretary shall proceed without interruption or delay with those ongoing or programmed projects and studies, or elements of projects or studies, that are not directly related to vegetation variance policy.