S. 2823Senate113th Congress (2013-2015)In Committee

North American Energy Infrastructure Act

Introduced September 16, 2014

Legislative Activity

Stay on top of the latest movement without scrolling through every action

2 earlier actions
SenateIntro Referral Latest Action

Read twice and referred to the Committee on Energy and Natural Resources.

September 16, 2014

View full timeline
SenateIntro Referral

Introduced in Senate

September 16, 2014

SenateIntro Referral

Sponsor introductory remarks on measure. (CR S5632-5634)

September 16, 2014

SenateIntro Referral

Read twice and referred to the Committee on Energy and Natural Resources.

September 16, 2014

Floor Debate

17 members

What members said about S. 2823 on the floor

5 Republicans11 Democrats1 Independent
Debbie Stabenow
Sen. Debbie StabenowD-MI · Sep 16, 2014

Thank you, Mr. President. I am very pleased to join with a number of colleagues today representing all of those in our conference who are deeply concerned about the mound of debt that students incur…

John Hoeven
Sen. John HoevenR-ND · Sep 16, 2014

Mr. President, I rise today to present the North American Energy Infrastructure Act. It is a bipartisan piece of legislation that I think is very important to helping our country build the…

John Hoeven
Sen. John HoevenR-ND · Sep 16, 2014

Mr. President, I rise today to present the North American Energy Infrastructure Act. It is a bipartisan piece of legislation that I think is very important to helping our country build the…

Lamar Alexander
Sen. Lamar AlexanderR-TN · Sep 16, 2014

Mr. President, today I am introducing the NLRB Reform Act with Senator McConnell. Our legislation is very simple. It will change the NLRB from an advocate to an umpire. That is the role the National…

Heidi  Heitkamp
Sen. Heidi HeitkampD-ND · Sep 16, 2014

Mr. President, I ask to speak as if in morning business. Mr. President, it is truly a great honor to stand with my colleague from Kansas as we are on the cusp of actually passing legislation that has…

Show 8 more
Jerry Moran
Sen. Jerry MoranR-KS · Sep 16, 2014

Mr. President, I ask to speak as in morning business. Mr. President, I thank the Chair for the opportunity to speak this afternoon. I am also pleased to see on the floor my colleague from North…

Elizabeth Warren
Sen. Elizabeth WarrenD-MA · Sep 16, 2014

Mr. President, I wish to commend all of the incredible work that the Senator from Michigan has done on the ``fair shot'' agenda, how she really has been out there working hard for families across…

Tammy Baldwin
Sen. Tammy BaldwinD-WI · Sep 16, 2014

It is a delight to join Senator Stabenow on the floor to talk about this critical issue that is a growing crisis here at home in America and threatens Americans' economic strength and…

John Cornyn
Sen. John CornynR-TX · Sep 16, 2014

Mr. President, reserving the right to object, I want to say to my colleague from Massachusetts I appreciate her highlighting the importance of student debt in the lives of a lot of our young people…

Bernard Sanders
Sen. Bernard SandersI-VT · Sep 16, 2014

Mr. President, if you talk to the people in Vermont, and I suspect in any other State in America, they will say the most serious crisis facing this country is the lack of decent-paying jobs,…

Charles E. Schumer
Sen. Charles E. SchumerD-NY · Sep 16, 2014

Mr. President, I thank my colleague and dear friend from Michigan for the great work she has done as chair and vice chair of the DPCC. We have worked very hard on this ``fair shot'' agenda. We…

Jack Reed
Sen. Jack ReedD-RI · Sep 16, 2014

Mr. President, I join with my colleagues to urge the Senate to take up and pass the Bank on Students Emergency Loan Refinancing Act led by my colleague from Massachusetts, Senator Elizabeth Warren.…

Benjamin L. Cardin
Sen. Benjamin L. CardinD-MD · Sep 16, 2014

Mr. President, let me thank Senator Stabenow for organizing this time to underscore the importance of a fair shot for everyone to afford a college education. Earlier this month Senator Mikulski and I…

Show 7 more
Jeanne Shaheen
Sen. Jeanne ShaheenD-NH · Sep 16, 2014

I thank Senator Stabenow and Senator Baldwin. I am pleased to be on the floor today joining the distinguished Senator from Michigan, Ms. Warren, Senator Franken, and all the other Senators who will…

Al  Franken
Sen. Al Franken D-MN · Sep 16, 2014

Mr. President, I thank the generous Senator from Michigan, and I thank the Senator from New Hampshire for her remarks about the Bank on Students Emergency Loan Refinancing Act. I have held college…

Deb Fischer
Sen. Deb FischerR-NE · Sep 16, 2014

Mr. President, today I introduced the Helping Innovation and Revitalizing Innovation Act. It is a Federal Communications Commission, FCC, process reform idea called the HIRE Act. This measure seeks…

Barbara Boxer
Sen. Barbara BoxerD-CA · Sep 16, 2014

Mr. President, today I am proud to introduce the National Prostate Cancer Council Act with my colleague, Senator Sessions. This bipartisan legislation addresses the urgent need for a national…

Harry Reid
Sen. Harry ReidD-NV · Sep 16, 2014

I ask unanimous consent that the time for the Democrats be until 4:05 p.m. and the same with Republicans, 5:05 p.m. Mr. President, I ask unanimous consent that the order for the quorum call be…

John Hoeven
Sen. John HoevenR-ND · Sep 16, 2014

Mr. President, I ask unanimous consent for 10 minutes or as much time as I might need to discuss an important energy issue. Mr. President, I appreciate the comments of my esteemed colleague from…

Harry Reid
Sen. Harry ReidD-NV · Sep 16, 2014

Mr. President, I ask unanimous consent that the text of the bill be printed in the Record.

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in SenateIssued September 16, 2014

II

113th CONGRESS

2d Session

S. 2823

IN THE SENATE OF THE UNITED STATES

September 16, 2014

Mr. Hoeven (for himself, Mr. Donnelly, Ms. Murkowski, and Mr. Manchin) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources

A BILL

To require approval for the construction, connection, operation, or maintenance of oil or natural gas pipelines or electric transmission facilities at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico, and for other purposes.

1.

Short title

This Act may be cited as the North American Energy Infrastructure Act.

2.

Finding

Congress finds that the United States should establish a more uniform, transparent, and modern process for the construction, connection, operation, and maintenance of oil and natural gas pipelines and electric transmission facilities for the import and export of oil and natural gas and the transmission of electricity to and from Canada and Mexico, in pursuit of a more secure and efficient North American energy market.

3.

Authorization of certain energy infrastructure projects at the national boundary of the United States

(a)

Authorization

Except as provided in subsection (c) and section 7, no person may construct, connect, operate, or maintain a cross-border segment of an oil pipeline or electric transmission facility for the import or export of oil or the transmission of electricity to or from Canada or Mexico without obtaining a certificate of crossing for the construction, connection, operation, or maintenance of the cross-border segment under this section.

(b)

Certificate of crossing

(1)

Requirement

Not later than 120 days after final action is taken under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to a cross-border segment for which a request is received under this section, the relevant official identified under paragraph (2), in consultation with appropriate Federal agencies, shall issue a certificate of crossing for the cross-border segment unless the relevant official finds that the construction, connection, operation, or maintenance of the cross-border segment is not in the public interest of the United States.

(2)

Relevant official

The relevant official referred to in paragraph (1) is—

(A)

the Secretary of State with respect to oil pipelines; and

(B)

the Secretary of Energy with respect to electric transmission facilities.

(3)

Additional requirement for electric transmission facilities

In the case of a request for a certificate of crossing for the construction, connection, operation, or maintenance of a cross-border segment of an electric transmission facility, the Secretary of Energy shall require, as a condition of issuing the certificate of crossing for the request under paragraph (1), that the cross-border segment of the electric transmission facility be constructed, connected, operated, or maintained consistent with all applicable policies and standards of—

(A)

the Electric Reliability Organization and the applicable regional entity; and

(B)

any Regional Transmission Organization or Independent System Operator with operational or functional control over the cross-border segment of the electric transmission facility.

(c)

Exclusions

This section shall not apply to any construction, connection, operation, or maintenance of a cross-border segment of an oil pipeline or electric transmission facility for the import or export of oil or the transmission of electricity to or from Canada or Mexico—

(1)

if the cross-border segment is operating for such import, export, or transmission as of the date of enactment of this Act;

(2)

if a permit described in section 6 for such construction, connection, operation, or maintenance has been issued;

(3)

if a certificate of crossing for such construction, connection, operation, or maintenance has previously been issued under this section; or

(4)

if an application for a permit described in section 6 for such construction, connection, operation, or maintenance is pending on the date of enactment of this Act, until the earlier of—

(A)

the date on which such application is denied; or

(B)

July 1, 2016.

(d)

Effect of other laws

(1)

Application to projects

Nothing in this section or section 7 shall affect the application of any other Federal statute to a project for which a certificate of crossing for the construction, connection, operation, or maintenance of a cross-border segment is sought under this section.

(2)

Energy Policy and Conservation Act

Nothing in this section or section 7 shall affect the authority of the President under section 103(a) of the Energy Policy and Conservation Act.

4.

Importation or exportation of natural gas to Canada and Mexico

Section 3(c) of the Natural Gas Act (15 U.S.C. 717b(c)) is amended—

(1)

by striking, For purposes of subsection (a) of this section and inserting the following:

(1)

In general

For purposes of subsection (a)

; and

(2)

by adding at the end the following:

(2)

Deadline for approval of applications relating to canada and Mexico

In the case of an application for the importation or exportation of natural gas to or from Canada or Mexico, the Commission shall approve the application not later than 30 days after the date of receipt of the application.

.

5.

Transmission of electric energy to Canada and Mexico

(a)

Repeal of requirement To secure order

Section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)) is repealed.

(b)

Conforming amendments

(1)

State regulations

Section 202(f) of the Federal Power Act (16 U.S.C. 824a(f)) is amended by striking insofar as such State regulation does not conflict with the exercise of the Commission's powers under or relating to subsection 202(e).

(2)

Seasonal diversity electricity exchange

Section 602(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a–4(b)) is amended by striking the Commission has conducted hearings and made the findings required under section 202(e) of the Federal Power Act and all that follows through the period at the end and inserting the Secretary has conducted hearings and finds that the proposed transmission facilities would not impair the sufficiency of electric supply within the United States or would not impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Secretary..

6.

No Presidential permit required

No Presidential permit (or similar permit) required under Executive Order No. 13337 (3 U.S.C. 301 note), Executive Order No. 11423 (3 U.S.C. 301 note), section 301 of title 3, United States Code, Executive Order No. 12038, Executive Order No. 10485, or any other Executive order shall be necessary for the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility, or any cross-border segment thereof.

7.

Modifications to existing projects

No certificate of crossing under section 3, or permit described in section 6, shall be required for a modification to the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility—

(1)

that is operating for the import or export of oil or natural gas or the transmission of electricity to or from Canada or Mexico as of the date of enactment of the Act;

(2)

for which a permit described in section 6 for such construction, connection, operation, or maintenance has been issued; or

(3)

for which a certificate of crossing for the cross-border segment of the pipeline or facility has previously been issued under section 3.

8.

Effective date; rulemaking deadlines

(a)

Effective date

Sections 3 through 7, and the amendments made by such sections, shall take effect on July 1, 2015.

(b)

Rulemaking deadlines

Each relevant official described in section 3(b)(2) shall—

(1)

not later than 180 days after the date of enactment of this Act, publish in the Federal Register notice of a proposed rulemaking to carry out the applicable requirements of section 3; and

(2)

not later than 1 year after the date of enactment of this Act, publish in the Federal Register a final rule to carry out the applicable requirements of section 3.

9.

Definitions

In this Act—

(1)

the term cross-border segment means the portion of an oil or natural gas pipeline or electric transmission facility that is located at the national boundary of the United States with either Canada or Mexico;

(2)

the term modification includes a change in ownership, volume expansion, downstream or upstream interconnection, or adjustment to maintain flow (such as a reduction or increase in the number of pump or compressor stations);

(3)

the term natural gas has the meaning given that term in section 2 of the Natural Gas Act (15 U.S.C. 717a);

(4)

the term oil means petroleum or a petroleum product;

(5)

the terms Electric Reliability Organization and regional entity have the meanings given those terms in section 215 of the Federal Power Act (16 U.S.C. 824o); and

(6)

the terms Independent System Operator and Regional Transmission Organization have the meanings given those terms in section 3 of the Federal Power Act (16 U.S.C. 796).