The Promoting Hydropower Development at Existing Nonpowered Dams Act would change the Federal Power Act to make it easier and faster to add small hydropower plants to dams that currently do not generate electricity. It creates a streamlined licensing process, adds safety checks, and sets up a government task force to coordinate approvals. The bill mainly affects non‑federal dam owners, state and tribal agencies, and the Federal Energy Regulatory Commission.

Key Provisions

  • The Federal Energy Regulatory Commission (FERC) must issue a rule within 180 days establishing an expedited licensing process for “qualifying facilities” at existing non‑powered dams, with a final license decision required within two years of a complete application.
  • FERC must convene an interagency task force—including federal, state and tribal representatives—to coordinate the various regulatory steps needed for these projects.
  • Before granting a license, FERC must assess the safety of the dam and any related structures and apply dam‑safety requirements for the life of the license.
  • Interagency communication on environmental reviews (NEPA) for these projects will not be treated as prohibited ex‑parte communication, allowing agencies to cooperate without violating rules.
  • Within 12 months, FERC, together with the Secretaries of the Army, Interior, and Agriculture, must create a public list of federal non‑powered dams with the greatest hydropower potential, and share that list with relevant congressional committees.
  • The bill defines “qualifying facility” and “qualifying non‑powered dam” to ensure projects do not alter the dam’s existing water storage or release operations.
  • Annual charges owed by a licensee will start when construction of the hydropower facility begins, rather than at an earlier point.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

18 earlier actions
SenateIntro Referral Latest Action

Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

December 13, 2017

View full timeline
HouseIntro Referral

Introduced in House

June 12, 2017

HouseIntro Referral

Referred to the House Committee on Energy and Commerce.

June 12, 2017

HouseCommittee

Referred to the Subcommittee on Energy.

June 16, 2017

HouseCommittee

Forwarded by Subcommittee to Full Committee by Voice Vote .

October 26, 2017

HouseCommittee

Committee Consideration and Mark-up Session Held.

December 6, 2017

HouseCommittee

Ordered to be Reported by Voice Vote.

December 6, 2017

HouseCommittee

Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 115-461, Part I.

December 12, 2017

HouseIntro Referral

Referred jointly and sequentially to the House Committee on Natural Resources for a period ending not later than Dec. 12, 2017 for consideration of such provisions of the bill and amendment as fall within the jurisdiction of that committee under clause 1(m) of rule X.

December 12, 2017

HouseIntro Referral

Referred jointly and sequentially to the House Committee on Transportation and Infrastructure for a period ending not later than Dec. 12, 2017 for consideration of such provisions of the bill and amendment as fall within the jurisdiction of that committee under clause 1(r) of rule X.

December 12, 2017

HouseCommittee

Committee on Transportation discharged.

December 12, 2017

HouseCommittee

Committee on Natural Resources discharged.

December 12, 2017

HouseCalendars

Placed on the Union Calendar, Calendar No. 343.

December 12, 2017

HouseFloor

Mr. Upton moved to suspend the rules and pass the bill, as amended.

December 12, 2017 • 1:48 PM

HouseFloor

Considered under suspension of the rules. (consideration: CR H9809-9812)

December 12, 2017 • 1:48 PM

HouseFloor

DEBATE - The House proceeded with forty minutes of debate on H.R. 2872.

December 12, 2017 • 1:48 PM

HouseFloor

Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote.(text: CR H9809)

December 12, 2017 • 2:06 PM

HouseFloor

On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H9809)

December 12, 2017 • 2:06 PM

HouseFloor

Motion to reconsider laid on the table Agreed to without objection.

December 12, 2017 • 2:06 PM

SenateIntro Referral

Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

December 13, 2017

Floor Debate

5 members

What members said about H.R. 2872 on the floor

3 Republicans2 Democrats
Fred Upton
Rep. Fred UptonR-MI-6 · Dec 12, 2017

Mr. Speaker, I move to suspend the rules and pass the bill (H.R. 2872) to amend the Federal Power Act to promote hydropower development at existing nonpowered dams, and for other purposes, as…

Greg Walden
Rep. Greg WaldenR-OR-2 · Dec 12, 2017

Mr. Speaker, I thank my colleagues on both sides of the aisle for their great work on this: Mr. Rush from Illinois and, of course, the former chairman of the Energy and Commerce Committee, my friend,…

Bobby L. Rush
Rep. Bobby L. RushD-IL-1 · Dec 12, 2017

Mr. Speaker, I yield myself such time as I may consume. Mr. Speaker, I rise in strong support of H.R. 2872, the Promoting Hydropower Development at Existing Nonpowered Dams Act. Mr. Speaker, I…

Larry Bucshon
Rep. Larry BucshonR-IN-8 · Dec 12, 2017

Mr. Speaker, I thank the gentleman for yielding. Whether it is turning on the light above the kitchen table in a home or powering heavy machinery in a factory, the American people expect there to be…

David Loebsack
Rep. David LoebsackD-IA-2 · Dec 12, 2017

Mr. Speaker, I thank the gentleman for yielding. Mr. Speaker, I rise today in support of H.R. 2872, the Promoting Hydropower Development at Existing Nonpowered Dams Act. Iowa has become a national…

Show 1 more
Greg Walden
Rep. Greg WaldenR-OR-2 · Dec 12, 2017

Under clause 2 of rule XII, bills referred as follows: Mr. WALDEN: Committee on Energy and Commerce. H.R. 2872. A bill to amend the Federal Power Act to promote hydropower development at existing…

Bill Text

4 versions available

Reading Mode
Latest
Referred in SenateIssued December 13, 2017

IIB

115th CONGRESS

1st Session

H. R. 2872

IN THE SENATE OF THE UNITED STATES

December 13, 2017

Received; read twice and referred to the Committee on Energy and Natural Resources

AN ACT

To amend the Federal Power Act to promote hydropower development at existing nonpowered dams, and for other purposes.

1.

Short title

This Act may be cited as the Promoting Hydropower Development at Existing Nonpowered Dams Act.

2.

Promoting hydropower development at existing nonpowered dams

Part I of the Federal Power Act (16 U.S.C. 792 et seq.) is amended by adding at the end the following:

34.

Promoting hydropower development at existing nonpowered dams

(a)

Expedited licensing process for non-Federal hydropower projects at existing nonpowered dams

(1)

In general

As provided in this section, the Commission may issue and amend licenses and preliminary permits, as appropriate, for any facility the Commission determines is a qualifying facility.

(2)

Rule

Not later than 180 days after the date of enactment of this section, the Commission shall issue a rule establishing an expedited process for issuing and amending licenses and preliminary permits for qualifying facilities under this section.

(3)

Interagency Task Force

In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate a qualifying facility.

(4)

Length of Process

The Commission shall ensure that the expedited process under this section will result in a final decision on an application for a license by not later than 2 years after receipt of a completed application for the license.

(b)

Dam safety

(1)

Assessment

Before issuing any license for a qualifying facility, the Commission shall assess the safety of existing non-Federal dams and other non-Federal structures related to the qualifying facility (including possible consequences associated with failure of such structures).

(2)

Requirements

In issuing any license for a qualifying facility, the Commission shall ensure that the Commission’s dam safety requirements apply to such qualifying facility, and the associated qualifying nonpowered dam, over the term of such license.

(c)

Interagency communications

Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an application for a license for a qualifying facility under this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—

(1)

be considered to be ex parte communications under Commission rules; or

(2)

preclude an agency from participating in a licensing proceeding under this part.

(d)

Identification of nonpowered dams for hydropower development

(1)

In general

Not later than 12 months after the date of enactment of this section, the Commission, with the Secretary of the Army, the Secretary of the Interior, and the Secretary of Agriculture, shall jointly develop a list of existing nonpowered Federal dams that the Commission and the Secretaries agree have the greatest potential for non-Federal hydropower development.

(2)

Considerations

In developing the list under paragraph (1), the Commission and the Secretaries may consider the following:

(A)

The compatibility of hydropower generation with existing purposes of the dam.

(B)

The proximity of the dam to existing transmission resources.

(C)

The existence of studies to characterize environmental, cultural, and historic resources relating to the dam.

(D)

The effects of hydropower development on release or flow operations of the dam.

(3)

Availability

The Commission shall—

(A)

provide the list developed under paragraph (1) to—

(i)

the Committee on Energy and Commerce, the Committee on Transportation and Infrastructure, and the Committee on Natural Resources, of the House of Representatives; and

(ii)

the Committee on Environment and Public Works, and the Committee on Energy and Natural Resources, of the Senate; and

(B)

make such list available to the public.

(e)

Definitions

For purposes of this section:

(1)

Qualifying criteria

The term qualifying criteria means, with respect to a facility—

(A)

as of the date of enactment of this section, the facility is not licensed under, or exempted from the license requirements contained in, this part;

(B)

the facility will be associated with a qualifying nonpowered dam;

(C)

the facility will be constructed, operated, and maintained for the generation of electric power;

(D)

the facility will use for such generation any withdrawals, diversions, releases, or flows from the associated qualifying nonpowered dam, including its associated impoundment or other infrastructure; and

(E)

the operation of the facility will not result in any material change to the storage, release, or flow operations of the associated qualifying nonpowered dam.

(2)

Qualifying facility

The term qualifying facility means a facility that is determined under this section to meet the qualifying criteria.

(3)

Qualifying nonpowered dam

The term qualifying nonpowered dam means any dam, dike, embankment, or other barrier—

(A)

the construction of which was completed on or before the date of enactment of this section;

(B)

that is or was operated for the control, release, or distribution of water for agricultural, municipal, navigational, industrial, commercial, environmental, recreational, aesthetic, drinking water, or flood control purposes; and

(C)

that, as of the date of enactment of this section, is not generating electricity with hydropower generating works that are licensed under, or exempted from the license requirements contained in, this part.

.

3.

Obligation for payment of annual charges

Section 10(e) of the Federal Power Act (16 U.S.C. 803(e)) is amended by adding at the end the following:

(5)

Any obligation of a licensee for payment of annual charges under this subsection shall commence when the construction of the applicable facility commences.

.

Passed the House of Representatives December 12, 2017.