S. 392Senate119th Congress (2025-2027)In Committee

Sloan Canyon Conservation and Lateral Pipeline Act

Introduced February 4, 2025

AI-Generated Summary

Updated November 24, 2025 at 3:04 AM UTC

The Sloan Canyon Conservation and Lateral Pipeline Act updates the Sloan Canyon National Conservation Area by adopting a newer map and expanding the protected land to roughly 57,728 acres. It also creates a new right‑of‑way for the Horizon Lateral Pipeline and related infrastructure for the Southern Nevada Water Authority, while setting conditions to protect the area’s resources and preserve existing utility corridors.

Key Provisions

  • Changes the official map for the Sloan Canyon National Conservation Area to a newer “Proposed Sloan Canyon Expansion” map dated May 20 2024.
  • Increases the size of the conservation area from about 48,438 acres to about 57,728 acres.
  • Adds a new subsection authorizing the Southern Nevada Water Authority to receive a temporary and permanent right‑of‑way for a water pipeline (the Horizon Lateral Pipeline), power line, facility, and access road outside the conservation‑area boundary, without paying rent.
  • Allows the Authority to excavate and use or dispose of sand, gravel, minerals, or other materials from the pipeline tunnel, provided a memorandum of understanding is signed with the Interior Secretary within 30 days.
  • Requires the pipeline right‑of‑way to include reasonable conditions to protect conservation‑area resources, to avoid permanent damage to surface resources, and to stay out of any designated wilderness areas.
  • Clarifies that the expanded boundary will respect existing utility transmission corridors and rights‑of‑way, and permits continued operation, maintenance, or new utility facilities in those corridors under applicable environmental laws.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

1 earlier action
SenateIntro Referral Latest Action

Read twice and referred to the Committee on Energy and Natural Resources.

February 4, 2025

View full timeline
SenateIntro Referral

Introduced in Senate

February 4, 2025

SenateIntro Referral

Read twice and referred to the Committee on Energy and Natural Resources.

February 4, 2025

Floor Debate

2 members

What members said about S. 392 on the floor

1 Republican1 Democrat
Mike Lee
Sen. Mike LeeR-UT · Jul 29, 2025

Mr. President, last year, this body unanimously passed 41 bills from the Energy and Natural Resources Committee. Now, 16 of those bills, for one reason or another, didn't end up getting signed into…

Patty Murray
Sen. Patty MurrayD-WA · Jul 29, 2025

Mr. President, reserving the right to object, and I appreciate the Senator from Utah being here tonight to offer this package, but I believe there needs to be a more bipartisan and thoughtful way to…

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in SenateIssued February 4, 2025

II

119th CONGRESS

1st Session

S. 392

IN THE SENATE OF THE UNITED STATES

February 4, 2025

Ms. Cortez Masto introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources

A BILL

To amend the Sloan Canyon National Conservation Area Act to adjust the boundary of the Sloan Canyon National Conservation Area, and for other purposes.

1.

Short title

This Act may be cited as the Sloan Canyon Conservation and Lateral Pipeline Act.

2.

Definitions

In this Act:

(1)

Conservation Area

The term Conservation Area means the Sloan Canyon National Conservation Area.

(2)

Secretary

The term Secretary means the Secretary of the Interior, acting through the Director of the Bureau of Land Management.

3.

Sloan Canyon National Conservation Area boundary adjustment

(a)

Boundary adjustment

(1)

Map

Section 603(4) of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–1(4)) is amended by striking map entitled Southern Nevada Public Land Management Act and dated October 1, 2002 and inserting map entitled Proposed Sloan Canyon Expansion and dated May 20, 2024.

(2)

Acreage

Section 604(b) of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–2(b)) is amended by striking 48,438 and inserting 57,728.

(b)

Right-of-Way

Section 605 of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–3) is amended by adding at the end the following:

(h)

Horizon lateral pipeline right-of-Way

(1)

In general

Notwithstanding sections 202 and 503 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1712, 1763) and subject to valid existing rights and paragraph (3), the Secretary of the Interior, acting through the Director of the Bureau of Land Management (referred to in this subsection as the Secretary), shall, not later than 1 year after the date of enactment of this subsection, grant to the Southern Nevada Water Authority (referred to in this subsection as the Authority), not subject to the payment of rents or other charges, the temporary and permanent water pipeline infrastructure, and outside the boundaries of the Conservation Area, powerline, facility, and access road rights-of-way depicted on the map for the purposes of—

(A)

performing geotechnical investigations within the rights-of-way; and

(B)

constructing and operating water transmission and related facilities.

(2)

Excavation and disposal

(A)

In general

The Authority may, without consideration, excavate and use or dispose of sand, gravel, minerals, or other materials from the tunneling of the water pipeline necessary to fulfill the purpose of the rights-of-way granted under paragraph (1).

(B)

Memorandum of understanding

Not later than 30 days after the date on which the rights-of-way are granted under paragraph (1), the Secretary and the Authority shall enter into a memorandum of understanding identifying Federal land on which the Authority may dispose of materials under subparagraph (A) to further the interests of the Bureau of Land Management.

(3)

Requirements

A right-of-way issued under this subsection shall be subject to the following requirements:

(A)

The Secretary may include reasonable terms and conditions, consistent with section 505 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1765), as are necessary to protect Conservation Area resources.

(B)

Construction of the water pipeline shall not permanently adversely affect conservation area surface resources.

(C)

The right-of-way shall not be located through or under any area designated as wilderness.

.

(c)

Preservation of transmission and utility corridors and rights-of-Way

The expansion of the Conservation Area boundary under the amendment made by subsection (a)—

(1)

shall be subject to valid existing rights, including land within a designated utility transmission corridor or a transmission line right-of-way grant approved by the Secretary in a record of decision issued before the date of enactment of this Act; and

(2)

shall not preclude—

(A)

any activity authorized in accordance with a designated corridor or right-of-way referred to in paragraph (1), including the operation, maintenance, repair, or replacement of any authorized utility facility within the corridor or right-of-way; or

(B)

the Secretary from authorizing the establishment of a new utility facility right-of-way within an existing designated transportation and utility corridor referred to in paragraph (1)—

(i)

in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable laws; and

(ii)

subject to such terms and conditions as the Secretary determines to be appropriate.

(d)

Management of the Conservation Area

Except as provided in the amendment made by subsection (b), nothing in this Act or the amendments made by this Act shall modify the management of the Conservation Area pursuant to section 605 of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–3).