Madam Speaker, pursuant to the Republican Leadership standards on earmarks, I am submitting the following information for publication in the Congressional Record regarding earmarks I received as part of H.R. 1105, the Omnibus…
Madam Speaker, pursuant to the Republican Leadership standards on earmarks, I am submitting the following information for publication in the Congressional Record regarding earmarks I received as part of H.R. 1105, the Omnibus Appropriations Act, 2009:
1) Requesting Member: Mary Bono Mack
Bill Number: H.R. 1105
Account: Energy and Water Development, Bureau of Reclamation, Water and Related Resources Account
Entity Requesting: Rancho California Water District (RCWD), 42135 Winchester Road, Temecula, CA 92590
Description of Earmark:
RCWD's project will substantially expand use of recycled and raw water in Riverside County, free up treated water to serve 70,000 new households in Southern California by converting agricultural demands from treated to recycled and raw water, shifting 144 cfs peak demand off MWD's treated water system, providing for additional recycled water reuse of 16,000 AF/year, relieving pressure from the Bay Delta and Colorado River, increasing annual storage by 10,000 AF/year, reducing carbon emissions by 4.9 million pounds/year. RCWD completed a feasibility study, which ensured viability of the project and was approved by Bureau of Reclamation (2007).
RCWD's Fiscal Year 2009 $50,000 allocation will go toward design and construction--already underway this year--of a 48-inch pipeline to expand local recycled and raw water resources.
Spending Plan:
Project Expenditures--
RCWD's Fiscal Year 2009 $50,000 amount will go toward design and construction--already underway this year--of a 48-inch pipeline to expand local recycled and raw water resources. The total cost for this phase of the project is estimated at $28,000,000. The federal funding allocation will receive a non-federal/local match of $26,000,000, or 92 percent. The non-federal funding match is provided by RCWD. Federal funds will be used for final design and beginning construction of the 48-inch pipeline to transport raw water from MWD's aqueduct for storage in Vail Lake.
2) Requesting Member: Mary Bono Mack
Bill Number: H.R. 1105
Account: Energy and Water Development, Corps of Engineers, Construction Account
Entity Requesting: Eastern Municipal Water District, 2270 Trumble Road, P.O. Box 8300, Perris, CA 92572-8300
Description of Earmark:
$946,000 is provided for a project that will produce potable water from an otherwise unusable groundwater resource through the construction of a three million-gallon per day (MGD) reverse osmosis desalter, feed-water pipelines, and brackish water wells in the Perris South sub-basin. In addition to reducing future demand for imported water from the Sacramento-San Joaquin Delta and the Colorado River, project benefits include salinity management for expanded water recycling and protection of high-quality groundwater in basins adjacent to the South Perris Basin.
The Perris II Desalter is a vital component of Eastern Municipal Water District's (EMWD) desalination program which will ultimately generate up to 12,000 acre-feet per year of potable water and remove 50,000 tons of salt out of the basin every year. Projects such as this will move EMWD toward its goal of drought-proofing its region and providing reliability and flexibility to its water supply. EMWD has received funding authorization under P.L. 106-554, Div. B, Sec. 108 (d)(52) for implementation of the desalination program.
Spending Plan
Project Expenditures:
Total Project Cost......................................$30,000,000
Total State/Local Contribution...........................$7,500,000
FY09 State/Local Contribution..............................$500,000
FY09 Federal Funding.......................................$946,000
3) Requesting Member: Mary Bono Mack
Bill Number: H.R. 1105
Account: Energy and Water Development, Corps of Engineers, Investigations Account
Entity Requesting: Riverside County Flood Control & Water Conservation District, 1995 Market Street, Riverside, CA 92501
Description of Earmark:
$215,000 is provided for the Heacock and Cactus Channels project that will provide flood control through the widening and deepening of the channels, as well as construction of facilities designed to safely convey the tributary flows to a currently existing ultimate outlet downstream. A reduction in flooding will not only benefit the local community whose drains back up during storms, but it would also allow March Air Reserve Base to better safeguard its equipment and infrastructure from flood waters and ensure that the military's readiness for overseas deployment at this facility is not adversely affected.
Funds will be used to award and construct the project. At this time, the Corps has already completed an Initial Appraisal Report and Project Management Plan under its Section 205 Program, as well as executed a Feasibility Cost Sharing Agreement that would take into account the federal benefits that would accrue as a result of this project, which have been estimated to be as much as 75 percent.
Spending Plan
Project Expenditures:
Total Project Cost......................................$30,000,000
Federal Share...........................................$28,400,000
Non-Federal Share........................................$1,600,000
Requesting Member: Mary Bono Mack
Bill Number: H.R. 1105
Account: Energy and Water Development, Corps of Engineers, Construction Account
Entity Requesting: Riverside County Flood Control & Water Conservation District, 1995 Market Street, Riverside, CA 92501
Description of Earmark:
$3,349,000 is provided and will be used to award and construct the project's entire Phase II reach, which includes protection for Old Town Temecula, as well as to complete the Design Documentation Report and the preparation of plans and specifications for Phase III's Multi- Purpose Detention Basin.
The Murrieta Creek Flood Control Project will provide 100-year flood control, environmental restoration and recreation benefits to the cities of Murrieta and Temecula. The project, which will be constructed in four distinct phases, will include a 250 acre detention basin to attenuate flows from the over 150
square mile watershed and which, once completed, will reduce citizens' and businesses' exposure that requires many of them to carry flood insurance. The project will also create seven miles of soft earthen channelization that will result in the development of a riparian habitat corridor throughout the length of the project, which can become a safe home for several listed endangered species that have already been found to exist nearby. This channel will not only facilitate species movement and connectivity to existing wildlife preserves, but will also create an extensive natural wetlands system that can efficiently remove contaminants from stream flows and help ensure improved water quality for local residents and soldiers stationed at the Camp Pendleton Marine Base.
The project covers the Murrieta Creek and surrounding region beginning just upstream from Old Town Murrieta to Vineyard Parkway- Tenaja Road (Phase IV) and running downstream south of Old Town Temecula, including Old Town Front and Pujol Streets (Phase I). Flood protection and ecosystem restoration will cover areas in between these two points that include the Santa Rosa Water Reclamation Facility, the region's commerce center near US-15 and Historic Old Town Temecula.
Spending Plan
Project Expenditures:
Total Project Cost.....................................$117,000,000
Federal Share...........................................$75,270,000
Non-Federal Share.......................................$41,730,000
5) Requesting Member: Mary Bono Mack
Bill Number: H.R. 1105
Account: Interior and Environment, Bureau of Land Management, Land Acquisition Account
Entity Requesting: Coachella Valley Mountains Conservancy and the Friends of the Desert, 45480 Portola Ave, Palm Desert, CA 92260
Description of Earmark:
$1,300,000 is provided for acquisition of 612 acres (a 544 acre property, and two 40 acre parcels) by BLM to protect important lands in the Santa Rosa and San Jacinto Mountains National Monument. The 544 acre parcel is bounded by BLM land to the north and east. The property abuts the existing Andreas Hills residential development and is located within the City of Palm Springs. The property contains portions of two trails proposed as year-round trails in the Coachella Valley Multiple Species Habitat Conservation Plan (MSHCP); thus, providing recreation opportunities in the Monument. It also contains a palm oasis. The two 40 acre parcels are also largely surrounded by existing BLM land, and provide habitat for the bighorn sheep.
Spending Plan:
Project Expenditures--
The acquisition cost is $1,305,000 for all three properties.
6) Requesting Member: Mary Bono Mack
Bill Number: H.R. 1105
Account: Interior and Environment, Bureau of Land Management, STAG Water and Wastewater Infrastructure Project
Entity Requesting: The City of Hemet, 445 E. Florida Avenue, Hemet,