To direct the Corps of Engineers to construct a portion of the modified water delivery project in the State of Florida.
What it does: Adds SEC. 1____. MODIFIED WATER DELIVERY PROJECT IN THE STATE OF FLORIDA on page 271, between lines 10 and 11What it changes
1 change to H.J.Res. 2
Adds SEC. 1____. MODIFIED WATER DELIVERY PROJECT IN THE STATE OF FLORIDA on page 271, between lines 10 and 11
Adds a sectionPrinted pageInserted: SEC. 1____. MODIFIED WATER DELIVERY PROJECT IN THE STATE OF FLORIDA.
Inserted: The Corps of Engineers, using funds made available for modifications authorized by section 104 of the Everglades National Park Protection and Expansion Act of 1989 (16 U.S.C. 410r-8), shall immediately carry out alternative 6D (including paying 100 percent of the cost of acquiring land or an interest in land) for the purpose of providing a flood protection system for the 8.5 square mile area described in the report entitled "Central and South Florida Project, Modified Water Deliveries to Everglades National Park, Florida, 8.5 Square Mile Area, General Reevaluation Report and Final Supplemental Environmental Impact Statement" and dated July 2000.
Original wording
On page 271, between lines 10 and 11, insert the following:
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
On page 271, between lines 10 and 11, insert the following:
SEC. 1____. MODIFIED WATER DELIVERY PROJECT IN THE STATE OF FLORIDA.
The Corps of Engineers, using funds made available for modifications authorized by section 104 of the Everglades National Park Protection and Expansion Act of 1989 (16 U.S.C. 410r-8), shall immediately carry out alternative 6D (including paying 100 percent of the cost of acquiring land or an interest in land) for the purpose of providing a flood protection system for the 8.5 square mile area described in the report entitled “Central and South Florida Project, Modified Water Deliveries to Everglades National Park, Florida, 8.5 Square Mile Area, General Reevaluation Report and Final Supplemental Environmental Impact Statement” and dated July 2000.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Amendment SA 139, as previously agreed to, was further modified by Unanimous Consent. (consideration: CR S1509-1512; text as further modified: CR S1509)
January 28, 2003
View full timeline
Amendment SA 139, as previously agreed to, was further modified by Unanimous Consent. (consideration: CR S1509-1512; text as further modified: CR S1509)
January 28, 2003
Senate amendment proposed (on the floor): Amendment SA 139 proposed by Senator Stevens for Senator Graham FL.(consideration: CR S1416, S1431-1433)
January 23, 2003
Senate amendment agreed to: Amendment SA 139 as modified agreed to in Senate by Voice Vote.(text as modified: CR S1432)
January 23, 2003
Amendment SA 139 proposed by Senator Stevens for Senator Graham FL. (consideration: CR S1416, S1431-1433) To direct the Corps of Engineers to construct a portion of the modified water delivery project in the State of Florida.
January 23, 2003
Amendment SA 139 as modified agreed to in Senate by Voice Vote. (text as modified: CR S1432)
January 23, 2003
Senate amendment submitted
January 21, 2003