To require a specific authorization of Congress for the commencement of the engineering development phase or subsequent phase of a Robust Nuclear Earth Penetrator.

What it does: Adds SEC. 3135. REQUIREMENT FOR SPECIFIC AUTHORIZATION OF CONGRESS FOR COMMENCEMENT OF ENGINEERING DEVELOPMENT PHASE OR SUBSEQUENT PHASE OF ROBUST NUCLEAR EARTH PENETRATOR at the end of subtitle B of title XXXI
Submitted May 21, 2003

What it changes

1 change to S. 1050 · shown in the bill's text

Adds a section
  1. Adds SEC. 3135. REQUIREMENT FOR SPECIFIC AUTHORIZATION OF CONGRESS FOR COMMENCEMENT OF ENGINEERING DEVELOPMENT PHASE OR SUBSEQUENT PHASE OF ROBUST NUCLEAR EARTH PENETRATOR at the end of subtitle B of title XXXI

    Adds a section

    In S. 1050 · Placed on Calendar Senate

    (c) Repeal of Superseded Plan Requirement.--Subsection (c) of such section is repealed.

    Inserted: SEC. 3135. REQUIREMENT FOR SPECIFIC AUTHORIZATION OF CONGRESS FOR COMMENCEMENT OF ENGINEERING DEVELOPMENT PHASE OR SUBSEQUENT PHASE OF ROBUST NUCLEAR EARTH PENETRATOR.

    Inserted: The Secretary of Energy may not commence the engineering development phase (phase 6.3) of the nuclear weapons development process, or any subsequent phase, of a Robust Nuclear Earth Penetrator weapon unless specifically authorized by Congress.

    Original wording

    At the end of subtitle B of title XXXI, add the following:

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

SA 766. Mr. NELSON of Florida (for himself, Mr. Warner, and Mr. Levin) proposed an amendment to the bill S. 1050, to authorize appropriations for fiscal year 2004 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe personnel strengths for such fiscal year for the Armed Forces, and for other purposes; as follows:

At the end of subtitle B of title XXXI, add the following:

SEC. 3135. REQUIREMENT FOR SPECIFIC AUTHORIZATION OF CONGRESS FOR COMMENCEMENT OF ENGINEERING DEVELOPMENT PHASE OR SUBSEQUENT PHASE OF ROBUST NUCLEAR EARTH PENETRATOR.

The Secretary of Energy may not commence the engineering development phase (phase 6.3) of the nuclear weapons development process, or any subsequent phase, of a Robust Nuclear Earth Penetrator weapon unless specifically authorized by Congress.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

4 earlier actions
Floor Latest Action

Senate amendment submitted

May 21, 2003

View full timeline
Floor

Senate amendment submitted

May 21, 2003

Floor

Senate amendment proposed (on the floor): Amendment SA 766 proposed by Senator Nelson FL.(consideration: CR S6805; text: CR S6805)

May 21, 2003

Floor

Senate amendment agreed to: Amendment SA 766 agreed to in Senate by Voice.

May 21, 2003

Floor

Amendment SA 766 proposed by Senator Nelson FL. (consideration: CR S6805; text: CR S6805) To require a specific authorization of Congress for the commencement of the engineering development phase or subsequent phase of a Robust Nuclear Earth Penetrator.

May 21, 2003

Floor

Amendment SA 766 agreed to in Senate by Voice.

May 21, 2003