H.Amdt. 71House109th Congress (2005-2007)

An amendment numbered 2 printed in House Report 109-49 to authorize FERC to deter and punish fraud and manipulation in electricity and gas markets, increase penalties for Federal Power Act violations, authorizes FERC to refund all electricity overcharges, does not repeal the PUHCA, and directs the SEC to review utility holding companies' status under PUHCA to prevent them from wrongly claiming exemptions. The amendment retains a number of valuable provisions from Title XII, such as "open access" for public power entities, and does not modify the "native load" provisions adopted in the Energy and Commerce Committee. The amendment retains Title XII's electric transmission provision, including the spending caps.

What it does: Strikes section 1201 of title XII through section 1235
Submitted April 20, 2005

Description

Amendment sought to replace electricity provisions of the bill.

What it changes

1 change to H.R. 6

Strikes a provision

We couldn't match these changes to the text of H.R. 6, so they're shown as written.

We couldn't read part of this amendment. That part is shown as written below.

  1. Strikes section 1201 of title XII through section 1235

    Strikes

    Removes section 1201 of title XII through section 1235.

    Original wording

    Title XII of H.R. 6 is amended by striking sections 1201 through 1235

Shown as written

and sections 1237 through 1298, by striking the title heading, by inserting the following before title XIII, by redesignating section 1236 (relating to native load service obligation) as section 1233 of the following and inserting such redesignated section 1233 after section 1232 of the following, and by making the necessary conforming changes in the table of contents: TITLE XII--ELECTRICITY SECTION 1201. SHORT TITLE. This title may be cited as the “Electric Reliability Act of 2005”. Subtitle A--Reliability Standards SEC. 1211. ELECTRIC RELIABILITY STANDARDS. (a) In General.--Part II of the Federal Power Act (16 U.S.C 824 et seq.) is amended by adding at the end the following:

“SEC. 215. ELECTRIC RELIABILITY. “(a) Definitions.--For purposes of this section: “(1) The term ‘bulk-power system' means--“(A) facilities and control systems necessary for operating an interconnected electric energy transmission network (or any portion thereof); and “(B) electric energy from generation facilities needed to maintain transmission system reliability. The term does not include facilities used in the local distribution of electric energy. “(2) The terms ‘Electric Reliability Organization' and ‘ERO' mean the organization certified by the Commission under subsection (c) the purpose of which is to establish and enforce reliability standards for the bulk-power system, subject to Commission review. “(3) The term ‘reliability standard' means a requirement, approved by the Commission under this section, to provide for reliable operation of the bulk-power system. The term includes requirements for the operation of existing bulk-power system facilities and the design of planned additions or modifications to such facilities to the extent necessary to provide for reliable operation of the bulk-power system, but the term does not include any requirement to enlarge such facilities or to construct new transmission capacity or generation capacity. “(4) The term ‘reliable operation' means operating the elements of the bulk-power system within equipment and electric system thermal, voltage, and stability limits so that instability, uncontrolled separation, or cascading failures of such system will not occur as a result of a sudden disturbance or unanticipated failure of system elements. “(5) The term ‘Interconnection' means a geographic area in which the operation of bulk-power system components is synchronized such that the failure of 1 or more of such components may adversely affect the ability of the operators of other components within the system to maintain reliable operation of the facilities within their control. “(6) The term ‘transmission organization' means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities. “(7) The term ‘regional entity' means an entity having enforcement authority pursuant to subsection (e)(4). “(b) Jurisdiction and Applicability.--(1) The Commission shall have jurisdiction, within the United States, over the ERO certified by the Commission under subsection (c), any regional entities, and all users, owners and operators of the bulk-power system, including but not limited to the entities described in section 201(f), for purposes of approving reliability standards established under this section and enforcing compliance with this section. All users, owners and operators of the bulk-power system shall comply with reliability standards that take effect under this section. “(2) The Commission shall issue a final rule to implement the requirements of this section not later than 180 days after the date of enactment of this section. “(c) Certification.--Following the issuance of a Commission rule under subsection (b)(2), any person may submit an application to the Commission for certification as the Electric Reliability Organization. The Commission may certify 1 such ERO if the Commission determines that such ERO--“(1) has the ability to develop and enforce, subject to subsection (e)(2), reliability standards that provide for an adequate level of reliability of the bulk-power system; and “(2) has established rules that--“(A) assure its independence of the users and owners and operators of the bulk-power system, while assuring fair stakeholder representation in the selection of its directors and balanced decisionmaking in any ERO committee or subordinate organizational structure; “(B) allocate equitably reasonable dues, fees, and other charges among end users for all activities under this section; “(C) provide fair and impartial procedures for enforcement of reliability standards through the imposition of penalties in accordance with subsection (e) (including limitations on activities, functions, or operations, or other appropriate sanctions); “(D) provide for reasonable notice and opportunity for public comment, due process, openness, and balance of interests in developing reliability standards and otherwise exercising its duties; and “(E) provide for taking, after certification, appropriate steps to gain recognition in Canada and Mexico. The total amount of all dues, fees, and other charges collected by the ERO in each of the fiscal years 2006 through 2015 and allocated under subparagraph (B) shall not exceed $50,000,000. “(d) Reliability Standards.--(1) The Electric Reliability Organization shall file each reliability standard or modification to a reliability standard that it proposes to be made effective under this section with the Commission. “(2) The Commission may approve, by rule or order, a proposed reliability standard or modification to a reliability standard if it determines that the standard is just, reasonable, not unduly discriminatory or preferential, and in the public interest. The Commission shall give due weight to the technical expertise of the Electric Reliability Organization with respect to the content of a proposed standard or modification to a reliability standard and to the technical expertise of a regional entity organized on an Interconnection-wide basis with respect to a reliability standard to be applicable within that Interconnection, but shall not defer with respect to the effect of a standard on competition. A proposed standard or modification shall take effect upon approval by the Commission. “(3) The Electric Reliability Organization shall rebuttably presume that a proposal from a regional entity organized on an Interconnection-wide basis for a reliability standard or modification to a reliability standard to be applicable on an Interconnection-wide basis is just, reasonable, and not unduly discriminatory or preferential, and in the public interest. “(4) The Commission shall remand to the Electric Reliability Organization for further consideration a proposed reliability standard or a modification to a reliability standard that the Commission disapproves in whole or in part. “(5) The Commission, upon its own motion or upon complaint, may order the Electric Reliability Organization to submit to the Commission a proposed reliability standard or a modification to a reliability standard that addresses a specific matter if the Commission considers such a new or modified reliability standard appropriate to carry out this section. “(6) The final rule adopted under subsection (b)(2) shall include fair processes for the identification and timely resolution of any conflict between a reliability standard and any function, rule, order, tariff, rate schedule, or agreement accepted, approved, or ordered by the Commission applicable to a transmission organization. Such transmission organization shall continue to comply with such function, rule, order, tariff, rate schedule or agreement accepted approved, or ordered by the Commission until--“(A) the Commission finds a conflict exists between a reliability standard and any such provision; “(B) the Commission orders a change to such provision pursuant to section 206 of this part; and “(C) the ordered change becomes effective under this part. If the Commission determines that a reliability standard needs to be changed as a result of such a conflict, it shall order the ERO to develop and file with the Commission a modified reliability standard under paragraph (4) or (5) of this subsection.

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

Title XII of H.R. 6 is amended by striking sections 1201 through 1235 and sections 1237 through 1298, by striking the title heading, by inserting the following before title XIII, by redesignating section 1236 (relating to native load service obligation) as section 1233 of the following and inserting such redesignated section 1233 after section 1232 of the following, and by making the necessary conforming changes in the table of contents:

TITLE XII--ELECTRICITY

SECTION 1201. SHORT TITLE.

This title may be cited as the “Electric Reliability Act of 2005”.

Subtitle A--Reliability Standards SEC. 1211. ELECTRIC RELIABILITY STANDARDS.

(a) In General.--Part II of the Federal Power Act (16 U.S.C 824 et seq.) is amended by adding at the end the following:

“SEC. 215. ELECTRIC RELIABILITY.

“(a) Definitions.--For purposes of this section:

“(1) The term ‘bulk-power system' means--

“(A) facilities and control systems necessary for operating an interconnected electric energy transmission network (or any portion thereof); and

“(B) electric energy from generation facilities needed to maintain transmission system reliability. The term does not include facilities used in the local distribution of electric energy.

“(2) The terms ‘Electric Reliability Organization' and ‘ERO' mean the organization certified by the Commission under subsection (c) the purpose of which is to establish and enforce reliability standards for the bulk-power system, subject to Commission review.

“(3) The term ‘reliability standard' means a requirement, approved by the Commission under this section, to provide for reliable operation of the bulk-power system. The term includes requirements for the operation of existing bulk-power system facilities and the design of planned additions or modifications to such facilities to the extent necessary to provide for reliable operation of the bulk-power system, but the term does not include any requirement to enlarge such facilities or to construct new transmission capacity or generation capacity.

“(4) The term ‘reliable operation' means operating the elements of the bulk-power system within equipment and electric system thermal, voltage, and stability limits so that instability, uncontrolled separation, or cascading failures of such system will not occur as a result of a sudden disturbance or unanticipated failure of system elements.

“(5) The term ‘Interconnection' means a geographic area in which the operation of bulk-power system components is synchronized such that the failure of 1 or more of such components may adversely affect the ability of the operators of other components within the system to maintain reliable operation of the facilities within their control.

“(6) The term ‘transmission organization' means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities.

“(7) The term ‘regional entity' means an entity having enforcement authority pursuant to subsection (e)(4).

“(b) Jurisdiction and Applicability.--(1) The Commission shall have jurisdiction, within the United States, over the ERO certified by the Commission under subsection (c), any regional entities, and all users, owners and operators of the bulk-power system, including but not limited to the entities described in section 201(f), for purposes of approving reliability standards established under this section and enforcing compliance with this section. All users, owners and operators of the bulk-power system shall comply with reliability standards that take effect under this section.

“(2) The Commission shall issue a final rule to implement the requirements of this section not later than 180 days after the date of enactment of this section.

“(c) Certification.--Following the issuance of a Commission rule under subsection (b)(2), any person may submit an application to the Commission for certification as the Electric Reliability Organization. The Commission may certify 1 such ERO if the Commission determines that such ERO--

“(1) has the ability to develop and enforce, subject to subsection (e)(2), reliability standards that provide for an adequate level of reliability of the bulk-power system; and

“(2) has established rules that--

“(A) assure its independence of the users and owners and operators of the bulk-power system, while assuring fair stakeholder representation in the selection of its directors and balanced decisionmaking in any ERO committee or subordinate organizational structure;

“(B) allocate equitably reasonable dues, fees, and other charges among end users for all activities under this section;

“(C) provide fair and impartial procedures for enforcement of reliability standards through the imposition of penalties in accordance with subsection (e) (including limitations on activities, functions, or operations, or other appropriate sanctions);

“(D) provide for reasonable notice and opportunity for public comment, due process, openness, and balance of interests in developing reliability standards and otherwise exercising its duties; and

“(E) provide for taking, after certification, appropriate steps to gain recognition in Canada and Mexico. The total amount of all dues, fees, and other charges collected by the ERO in each of the fiscal years 2006 through 2015 and allocated under subparagraph (B) shall not exceed $50,000,000.

“(d) Reliability Standards.--(1) The Electric Reliability Organization shall file each reliability standard or modification to a reliability standard that it proposes to be made effective under this section with the Commission.

“(2) The Commission may approve, by rule or order, a proposed reliability standard or modification to a reliability standard if it determines that the standard is just, reasonable, not unduly discriminatory or preferential, and in the public interest. The Commission shall give due weight to the technical expertise of the Electric Reliability Organization with respect to the content of a proposed standard or modification to a reliability standard and to the technical expertise of a regional entity organized on an Interconnection-wide basis with respect to a reliability standard to be applicable within that Interconnection, but shall not defer with respect to the effect of a standard on competition. A proposed standard or modification shall take effect upon approval by the Commission.

“(3) The Electric Reliability Organization shall rebuttably presume that a proposal from a regional entity organized on an Interconnection-wide basis for a reliability standard or modification to a reliability standard to be applicable on an Interconnection-wide basis is just, reasonable, and not unduly discriminatory or preferential, and in the public interest.

“(4) The Commission shall remand to the Electric Reliability Organization for further consideration a proposed reliability standard or a modification to a reliability standard that the Commission disapproves in whole or in part.

“(5) The Commission, upon its own motion or upon complaint, may order the Electric Reliability Organization to submit to the Commission a proposed reliability standard or a modification to a reliability standard that addresses a specific matter if the Commission considers such a new or modified reliability standard appropriate to carry out this section.

“(6) The final rule adopted under subsection (b)(2) shall include fair processes for the identification and timely resolution of any conflict between a reliability standard and any function, rule, order, tariff, rate schedule, or agreement accepted, approved, or ordered by the Commission applicable to a transmission organization. Such transmission organization shall continue to comply with such function, rule, order, tariff, rate schedule or agreement accepted approved, or ordered by the Commission until--

“(A) the Commission finds a conflict exists between a reliability standard and any such provision;

“(B) the Commission orders a change to such provision pursuant to section 206 of this part; and

“(C) the ordered change becomes effective under this part. If the Commission determines that a reliability standard needs to be changed as a result of such a conflict, it shall order the ERO to develop and file with the Commission a modified reliability standard under paragraph (4) or (5) of this subsection.

“(e) Enforcement.--(1) The ERO may impose, subject to paragraph (2), a penalty on a user or owner or operator of the bulk-power system for a violation of a reliability standard approved by the Commission under subsection (d) if the ERO, after notice and an opportunity for a hearing--

“(A) finds that the user or owner or operator has violated a reliability standard approved by the Commission under subsection (d); and

“(B) files notice and the record of the proceeding with the Commission.

“(2) A penalty imposed under paragraph (1) may take effect not earlier than the 31st day after the ERO files with the Commission notice of the penalty and the record of proceedings. Such penalty shall be subject to review by the Commission, on its own motion or upon application by the user, owner or operator that is the subject of the penalty filed within 30 days after the date such notice is filed with the Commission. Application to the Commission for review, or the initiation of review by the Commission on its own motion, shall not operate as a stay of such penalty unless the Commission otherwise orders upon its own motion or upon application by the user, owner or operator that is the subject of such penalty. In any proceeding to review a penalty imposed under paragraph (1), the Commission, after notice and opportunity for hearing (which hearing may consist solely of the record before the ERO and opportunity for the presentation of supporting reasons to affirm, modify, or set aside the penalty), shall by order affirm, set aside, reinstate, or modify the penalty, and, if appropriate, remand to the ERO for further proceedings. The Commission shall implement expedited procedures for such hearings.

“(3) On its own motion or upon complaint, the Commission may order compliance with a reliability standard and may impose a penalty against a user or owner or operator of the bulk-power system if the Commission finds, after notice and opportunity for a hearing, that the user or owner or operator of the bulk-power system has engaged or is about to engage in any acts or practices that constitute or will constitute a violation of a reliability standard.

“(4) The Commission shall issue regulations authorizing the ERO to enter into an agreement to delegate authority to a regional entity for the purpose of proposing reliability standards to the ERO and enforcing reliability standards under paragraph (1) if--

“(A) the regional entity is governed by--

“(i) an independent board;

“(ii) a balanced stakeholder board; or

“(iii) a combination independent and balanced stakeholder board.

“(B) the regional entity otherwise satisfies the provisions of subsection (c)(1) and (2); and

“(C) the agreement promotes effective and efficient administration of bulk-power system reliability. The Commission may modify such delegation. The ERO and the Commission shall rebuttably presume that a proposal for delegation to a regional entity organized on an Interconnection-wide basis promotes effective and efficient administration of bulk-power system reliability and should be approved. Such regulation may provide that the Commission may assign the ERO's authority to enforce reliability standards under paragraph (1) directly to a regional entity consistent with the requirements of this paragraph.

“(5) The Commission may take such action as is necessary or appropriate against the ERO or a regional entity to ensure compliance with a reliability standard or any Commission order affecting the ERO or a regional entity.

“(6) Any penalty imposed under this section shall bear a reasonable relation to the seriousness of the violation and shall take into consideration the efforts of such user, owner, or operator to remedy the violation in a timely manner.

“(f) Changes in Electric Reliability Organization Rules.--The Electric Reliability Organization shall file with the Commission for approval any proposed rule or proposed rule change, accompanied by an explanation of its basis and purpose. The Commission, upon its own motion or complaint, may propose a change to the rules of the ERO. A proposed rule or proposed rule change shall take effect upon a finding by the Commission, after notice and opportunity for comment, that the change is just, reasonable, not unduly discriminatory or preferential, is in the public interest, and satisfies the requirements of subsection (c).

“(g) Reliability Reports.--The ERO shall conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America.

“(h) Coordination With Canada and Mexico.--The President is urged to negotiate international agreements with the governments of Canada and Mexico to provide for effective compliance with reliability standards and the effectiveness of the ERO in the United States and Canada or Mexico.

“(i) Savings Provisions.--(1) The ERO shall have authority to develop and enforce compliance with reliability standards for only the bulk-power system.

“(2) This section does not authorize the ERO or the Commission to order the construction of additional generation or transmission capacity or to set and enforce compliance with standards for adequacy or safety of electric facilities or services.

“(3) Nothing in this section shall be construed to preempt any authority of any State to take action to ensure the safety, adequacy, and reliability of electric service within that State, as long as such action is not inconsistent with any reliability standard, except that the State of New York may establish rules that result in greater reliability within that State, as long as such action does not result in lesser reliability outside the State than that provided by the reliability standards..

“(4) Within 90 days of the application of the Electric Reliability Organization or other affected party, and after notice and opportunity for comment, the Commission shall issue a final order determining whether a State action is inconsistent with a reliability standard, taking into consideration any recommendation of the ERO.

“(5) The Commission, after consultation with the ERO and the State taking action, may stay the effectiveness of any State action, pending the Commission's issuance of a final order.

“(j) Regional Advisory Bodies.--The Commission shall establish a regional advisory body on the petition of at least \2/3\ of the States within a region that have more than \1/2\ of their electric load served within the region. A regional advisory body shall be composed of 1 member from each participating State in the region, appointed by the Governor of each State, and may include representatives of agencies, States, and provinces outside the United States. A regional advisory body may provide advice to the Electric Reliability Organization, a regional entity, or the Commission regarding the governance of an existing or proposed regional entity within the same region, whether a standard proposed to apply within the region is just, reasonable, not unduly discriminatory or preferential, and in the public interest, whether fees proposed to be assessed within the region are just, reasonable, not unduly discriminatory or preferential, and in the public interest and any other responsibilities requested by the Commission. The Commission may give deference to the advice of any such regional advisory body if that body is organized on an Interconnection-wide basis.

“(k) Alaska and Hawaii.--The provisions of this section do not apply to Alaska or Hawaii.”.

(b) Status of ERO.--The Electric Reliability Organization certified by the Federal Energy Regulatory Commission under section 215(c) of the Federal Power Act and any regional entity delegated enforcement authority pursuant to section 215(e)(4) of that Act are not departments, agencies, or instrumentalities of the United States Government.

(c) Limitation on Annual Appropriations.--There is authorized to be appropriated not more than $50,000,000 per year for fiscal years 2006 through 2015 for all activities under the amendment made by subsection (a).

Subtitle B--Transmission Operation Improvements SEC. 1231. OPEN NONDISCRIMINATORY ACCESS.

Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by inserting after section 211 the following new section:

“SEC. 211A. OPEN ACCESS BY UNREGULATED TRANSMITTING UTILITIES.

“(a) Transmission Services.--Subject to section 212(h), the Commission may, by rule or order, require an unregulated transmitting utility to provide transmission services--

“(1) at rates that are comparable to those that the unregulated transmitting utility charges itself; and

“(2) on terms and conditions (not relating to rates) that are comparable to those under which such unregulated transmitting utility provides transmission services to itself and that are not unduly discriminatory or preferential.

“(b) Exemption.--The Commission shall exempt from any rule or order under this section any unregulated transmitting utility that--

“(1) sells no more than 4,000,000 megawatt hours of electricity per year; or

“(2) does not own or operate any transmission facilities that are necessary for operating an interconnected transmission system (or any portion thereof); or

“(3) meets other criteria the Commission determines to be in the public interest.

“(c) Local Distribution Facilities.--The requirements of subsection (a) shall not apply to facilities used in local distribution.

“(d) Exemption Termination.--Whenever the Commission, after an evidentiary hearing held upon a complaint and after giving consideration to reliability standards established under section 215, finds on the basis of a preponderance of the evidence that any exemption granted pursuant to subsection (b) unreasonably impairs the continued reliability of an interconnected transmission system, it shall revoke the exemption granted to that transmitting utility.

“(e) Application to Unregulated Transmitting Utilities.--The rate changing procedures applicable to public utilities under subsections (c) and (d) of section 205 are applicable to unregulated transmitting utilities for purposes of this section.

“(f) Remand.--In exercising its authority under paragraph (1) of subsection (a), the Commission may remand transmission rates to an unregulated transmitting utility for review and revision where necessary to meet the requirements of subsection (a).

“(g) Other Requests.--The provision of transmission services under subsection (a) does not preclude a request for transmission services under section 211.

“(h) Limitation.--The Commission may not require a State or municipality to take action under this section that would violate a private activity bond rule for purposes of section 141 of the Internal Revenue Code of 1986 (26 U.S.C. 141).

“(i) Transfer of Control of Transmitting Facilities.--Nothing in this section authorizes the Commission to require an unregulated transmitting utility to transfer control or operational control of its transmitting facilities to an RTO or any other Commission-approved independent transmission organization designated to provide nondiscriminatory transmission access.

“(j) Definition.--For purposes of this section, the term ‘unregulated transmitting utility' means an entity that--

“(1) owns or operates facilities used for the transmission of electric energy in interstate commerce; and

“(2) is an entity described in section 201(f).”.

SEC. 1232. FEDERAL UTILITY PARTICIPATION IN REGIONAL TRANSMISSION ORGANIZATIONS.

(a) Definitions.--For purposes of this section--

(1) Appropriate federal regulatory authority.--The term “appropriate Federal regulatory authority” means--

(A) with respect to a Federal power marketing agency (as defined in the Federal Power Act), the Secretary of Energy, except that the Secretary may designate the Administrator of a Federal power marketing agency to act as the appropriate Federal regulatory authority with respect to the transmission system of that Federal power marketing agency; and

(B) with respect to the Tennessee Valley Authority, the Board of Directors of the Tennessee Valley Authority.

(2) Federal utility.--The term “Federal utility” means a Federal power marketing agency or the Tennessee Valley Authority.

(3) Transmission system.--The term “transmission system” means electric transmission facilities owned, leased, or contracted for by the United States and operated by a Federal utility.

(b) Transfer.--The appropriate Federal regulatory authority is authorized to enter into a contract, agreement or other arrangement transferring control and use of all or part of the Federal utility's transmission system to an RTO or ISO (as defined in the Federal Power Act), approved by the Federal Energy Regulatory Commission. Such contract, agreement or arrangement shall include--

(1) performance standards for operation and use of the transmission system that the head of the Federal utility determines necessary or appropriate, including standards that assure recovery of all the Federal utility's costs and expenses related to the transmission facilities that are the subject of the contract, agreement or other arrangement; consistency with existing contracts and third-party financing arrangements; and consistency with said Federal utility's statutory authorities, obligations, and limitations;

(2) provisions for monitoring and oversight by the Federal utility of the RTO's or ISO's fulfillment of the terms and conditions of the contract, agreement or other arrangement, including a provision for the resolution of disputes through arbitration or other means with the regional transmission organization or with other participants, notwithstanding the obligations and limitations of any other law regarding arbitration; and

(3) a provision that allows the Federal utility to withdraw from the RTO or ISO and terminate the contract, agreement or other arrangement in accordance with its terms. Neither this section, actions taken pursuant to it, nor any other transaction of a Federal utility using an RTO or ISO shall confer upon the Federal Energy Regulatory Commission jurisdiction or authority over the Federal utility's electric generation assets, electric capacity or energy that the Federal utility is authorized by law to market, or the Federal utility's power sales activities.

(c) Existing Statutory and Other Obligations.--

(1) System operation requirements.--No statutory provision requiring or authorizing a Federal utility to transmit electric power or to construct, operate or maintain its transmission system shall be construed to prohibit a transfer of control and use of its transmission system pursuant to, and subject to all requirements of subsection (b).

(2) Other obligations.--This subsection shall not be construed to--

(A) suspend, or exempt any Federal utility from, any provision of existing Federal law, including but not limited to any requirement or direction relating to the use of the Federal utility's transmission system, environmental protection, fish and wildlife protection, flood control, navigation, water delivery, or recreation; or

(B) authorize abrogation of any contract or treaty obligation.

(3) Repeal.--Section 311 of title III of Appendix B of the Act of October 27, 2000 (P.L. 106-377, section 1(a)(2); 114 Stat. 1441, 1441A-80; 16 U.S.C. 824n) is repealed.

Subtitle C--Amendments to PURPA SEC. 1251. NET METERING AND ADDITIONAL STANDARDS.

(a) Adoption of Standards.--Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:

“(11) Net metering.--Each electric utility shall make available upon request net metering service to any electric consumer that the electric utility serves. For purposes of this paragraph, the term ‘net metering service' means service to an electric consumer under which electric energy generated by that electric consumer from an eligible on-site generating facility and delivered to the local distribution facilities may be used to offset electric energy provided by the electric utility to the electric consumer during the applicable billing period.

“(12) Fuel sources.--Each electric utility shall develop a plan to minimize dependence on 1 fuel source and to ensure that the electric energy it sells to consumers is generated using a diverse range of fuels and technologies, including renewable technologies.

“(13) Fossil fuel generation efficiency.--Each electric utility shall develop and implement a 10-year plan to increase the efficiency of its fossil fuel generation.”.

(b) Compliance.--

(1) Time limitations.--Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following:

“(3)(A) Not later than 2 years after the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 111, or set a hearing date for such consideration, with respect to each standard established by paragraphs (11) through (13) of section 111(d).

“(B) Not later than 3 years after the date of the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 111 with respect to each standard established by paragraphs (11) through (13) of section 111(d).”.

(2) Failure to comply.--Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: “In the case of each standard established by paragraphs (11) through (13) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraphs (11) through (13).”.

(3) Prior state actions.--

(A) In general.--Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following:

“(d) Prior State Actions.--Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) of section 111(d) in the case of any electric utility in a State if, before the enactment of this subsection--

“(1) the State has implemented for such utility the standard concerned (or a comparable standard);

“(2) the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility; or

“(3) the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility.”.

(B) Cross reference.--Section 124 of such Act (16 U.S.C. 2634) is amended by adding the following at the end thereof: “In the case of each standard established by paragraphs (11) through (13) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraphs (11) through (13).”.

SEC. 1252. SMART METERING.

(a) In General.--Section 111(d) of the Public Utilities Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:

“(14) Time-based metering and communications.--

“(A) Not later than 18 months after the date of enactment of this paragraph, each electric utility shall offer each of its customer classes, and provide individual customers upon customer request, a time-based rate schedule under which the rate charged by the electric utility varies during different time periods and reflects the variance, if any, in the utility's costs of generating and purchasing electricity at the wholesale level. The time-based rate schedule shall enable the electric consumer to manage energy use and cost through advanced metering and communications technology.

“(B) The types of time-based rate schedules that may be offered under the schedule referred to in subparagraph (A) include, among others--

“(i) time-of-use pricing whereby electricity prices are set for a specific time period on an advance or forward basis, typically not changing more often than twice a year, based on the utility's cost of generating and/or purchasing such electricity at the wholesale level for the benefit of the consumer. Prices paid for energy consumed during these periods shall be pre-established and known to consumers in advance of such consumption, allowing them to vary their demand and usage in response to such prices and manage their energy costs by shifting usage to a lower cost period or reducing their consumption overall;

“(ii) critical peak pricing whereby time-of-use prices are in effect except for certain peak days, when prices may reflect the costs of generating and/or purchasing electricity at the wholesale level and when consumers may receive additional discounts for reducing peak period energy consumption; and

“(iii) real-time pricing whereby electricity prices are set for a specific time period on an advanced or forward basis, reflecting the utility's cost of generating and/or purchasing electricity at the wholesale level, and may change as often as hourly.

“(C) Each electric utility subject to subparagraph (A) shall provide each customer requesting a time-based rate with a time-based meter capable of enabling the utility and customer to offer and receive such rate, respectively.

“(D) For purposes of implementing this paragraph, any reference contained in this section to the date of enactment of the Public Utility Regulatory Policies Act of 1978 shall be deemed to be a reference to the date of enactment of this paragraph.

“(E) In a State that permits third-party marketers to sell electric energy to retail electric consumers, such consumers shall be entitled to receive the same time-based metering and communications device and service as a retail electric consumer of the electric utility.

“(F) Notwithstanding subsections (b) and (c) of section 112, each State regulatory authority shall, not later than 18 months after the date of enactment of this paragraph conduct an investigation in accordance with section 115(i) and issue a decision whether it is appropriate to implement the standards set out in subparagraphs (A) and (C).”.

(b) State Investigation of Demand Response and Time-Based Metering.--Section 115 of the Public Utilities Regulatory Policies Act of 1978 (16 U.S.C. 2625) is amended as follows:

(1) By inserting in subsection (b) after the phrase “the standard for time-of-day rates established by section 111(d)(3)” the following: “and the standard for time-based metering and communications established by section 111(d)(14)”.

(2) By inserting in subsection (b) after the phrase “are likely to exceed the metering” the following: “and communications”.

(3) By adding the at the end the following:

“(i) Time-Based Metering and Communications.--In making a determination with respect to the standard established by section 111(d)(14), the investigation requirement of section 111(d)(14)(F) shall be as follows: Each State regulatory authority shall conduct an investigation and issue a decision whether or not it is appropriate for electric utilities to provide and install time-based meters and communications devices for each of their customers which enable such customers to participate in time-based pricing rate schedules and other demand response programs.”.

(c) Federal Assistance on Demand Response.--Section 132(a) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2642(a)) is amended by striking “and” at the end of paragraph (3), striking the period at the end of paragraph (4) and inserting “; and”, and by adding the following at the end thereof:

“(5) technologies, techniques, and rate-making methods related to advanced metering and communications and the use of these technologies, techniques and methods in demand response programs.”.

(d) Federal Guidance.--Section 132 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2642) is amended by adding the following at the end thereof:

“(d) Demand Response.--The Secretary shall be responsible for--

“(1) educating consumers on the availability, advantages, and benefits of advanced metering and communications technologies, including the funding of demonstration or pilot projects;

“(2) working with States, utilities, other energy providers and advanced metering and communications experts to identify and address barriers to the adoption of demand response programs; and

“(3) not later than 180 days after the date of enactment of the Energy Policy Act of 2005, providing Congress with a report that identifies and quantifies the national benefits of demand response and makes a recommendation on achieving specific levels of such benefits by January 1, 2007.”.

(e) Demand Response and Regional Coordination.--

(1) In general.--It is the policy of the United States to encourage States to coordinate, on a regional basis, State energy policies to provide reliable and affordable demand response services to the public.

(2) Technical assistance.--The Secretary of Energy shall provide technical assistance to States and regional organizations formed by 2 or more States to assist them in--

(A) identifying the areas with the greatest demand response potential;

(B) identifying and resolving problems in transmission and distribution networks, including through the use of demand response;

(C) developing plans and programs to use demand response to respond to peak demand or emergency needs; and

(D) identifying specific measures consumers can take to participate in these demand response programs.

(3) Report.--Not later than 1 year after the date of enactment of the Energy Policy Act of 2005, the Commission shall prepare and publish an annual report, by appropriate region, that assesses demand response resources, including those available from all consumer classes, and which identifies and reviews--

(A) saturation and penetration rate of advanced meters and communications technologies, devices and systems;

(B) existing demand response programs and time-based rate programs;

(C) the annual resource contribution of demand resources;

(D) the potential for demand response as a quantifiable, reliable resource for regional planning purposes; and

(E) steps taken to ensure that, in regional transmission planning and operations, demand resources are provided equitable treatment as a quantifiable, reliable resource relative to the resource obligations of any load-serving entity, transmission provider, or transmitting party.

(f) Federal Encouragement of Demand Response Devices.--It is the policy of the United States that time-based pricing and other forms of demand response, whereby electricity customers are provided with electricity price signals and the ability to benefit by responding to them, shall be encouraged, and the deployment of such technology and devices that enable electricity customers to participate in such pricing and demand response systems shall be facilitated. It is further the policy of the United States that the benefits of such demand response that accrue to those not deploying such technology and devices, but who are part of the same regional electricity entity, shall be recognized.

(g) Time Limitations.--Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following:

“(4)(A) Not later than 1 year after the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 111, or set a hearing date for such consideration, with respect to the standard established by paragraph (14) of section 111(d).

“(B) Not later than 2 years after the date of the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 111 with respect to the standard established by paragraph (14) of section 111(d).”.

(h) Failure to Comply.--Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: “In the case of the standard established by paragraph (14) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraph (14).”.

(i) Prior State Actions Regarding Smart Metering Standards.--

(1) In general.--Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following:

“(e) Prior State Actions.--Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (14) of section 111(d) in the case of any electric utility in a State if, before the enactment of this subsection--

“(1) the State has implemented for such utility the standard concerned (or a comparable standard);

“(2) the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility within the previous 3 years; or

“(3) the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility within the previous 3 years.”.

(2) Cross reference.--Section 124 of such Act (16 U.S.C. 2634) is amended by adding the following at the end thereof: “In the case of the standard established by paragraph (14) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraph (14).”.

Subtitle D--Market Transparency, Enforcement, and Consumer Protection SEC. 1282. MARKET MANIPULATION.

Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following:

“SEC. 221. PROHIBITION ON FILING FALSE INFORMATION.

“No person or other entity (including an entity described in section 201(f)) shall willfully and knowingly report any information relating to the price of electricity sold at wholesale or availability of transmission capacity, which information the person or any other entity knew to be false at the time of the reporting, to a Federal agency with intent to fraudulently affect the data being compiled by such Federal agency.

“SEC. 222. PROHIBITION ON ROUND TRIP TRADING.

“(a) Prohibition.--No person or other entity (including an entity described in section 201(f)) shall willfully and knowingly enter into any contract or other arrangement to execute a ‘round trip trade' for the purchase or sale of electric energy at wholesale.

“(b) Definition.--For the purposes of this section, the term ‘round trip trade' means a transaction, or combination of transactions, in which a person or any other entity--

“(1) enters into a contract or other arrangement to purchase from, or sell to, any other person or other entity electric energy at wholesale;

“(2) simultaneously with entering into the contract or arrangement described in paragraph (1), arranges a financially offsetting trade with such other person or entity for the same such electric energy, at the same location, price, quantity and terms so that, collectively, the purchase and sale transactions in themselves result in no financial gain or loss; and

“(3) enters into the contract or arrangement with a specific intent to fraudulently affect reported revenues, trading volumes, or prices.”.

SEC. 1283. FRAUDULENT OR MANIPULATIVE PRACTICES.

(a) Unlawful Acts.--It shall be unlawful for any entity, directly or indirectly, by the use of any means or instrumentality of interstate commerce or of the mails to use or employ, in the transmission of electric energy in interstate commerce, the sale of electric energy at wholesale in interstate commerce, the transportation of natural gas in interstate commerce, or the sale in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use, any fraudulent, manipulative, or deceptive device or contrivance in contravention of such rules and regulations as the Federal Energy Regulatory Commission may prescribe as necessary or appropriate in the public interest.

(b) Application of Federal Power Act to This Act.--The provisions of section 307 through 309 and 313 through 317 of the Federal Power Act shall apply to violations of the Electric Reliability Act of 2005 in the same manner and to the same extent as such provisions apply to entities subject to Part II of the Federal Power Act.

SEC. 1284. RULEMAKING ON EXEMPTIONS, WAIVERS, ETC UNDER FEDERAL POWER ACT.

Part III of the Federal Power Act is amended by inserting the following new section after section 319 and by redesignating sections 320 and 321 as sections 321 and 322, respectively:

“SEC. 320. CRITERIA FOR CERTAIN EXEMPTIONS, WAIVERS, ETC.

“(a) Rule Required for Certain Waivers, Exemptions, Etc.--Not later than 6 months after the enactment of this Act, the Commission shall promulgate a rule establishing specific criteria for providing an exemption, waiver, or other reduced or abbreviated form of compliance with the requirements of sections 204, 301, 304, and 305 (including any prospective blanket order). Such criteria shall be sufficient to insure that any such action taken by the Commission will be consistent with the purposes of such requirements and will otherwise protect the public interest.

“(b) Moratorium on Certain Waivers, Exemptions, Etc.--After the date of enactment of this section, the Commission may not issue, adopt, order, approve, or promulgate any exemption, waiver, or other reduced or abbreviated form of compliance with the requirements of section 204, 301, 304, or 305 (including any prospective blanket order) until after the rule promulgated under subsection (a) has taken effect.

“(c) Previous Ferc Action.--The Commission shall undertake a review, by rule or order, of each exemption, waiver, or other reduced or abbreviated form of compliance described in subsection (a) that was taken before the date of enactment of this section. No such action may continue in force and effect after the date 18 months after the date of enactment of this section unless the Commission finds that such action complies with the rule under subsection (a).

“(d) Exemption Under 204(f) not Applicable.--For purposes of this section, in applying section 204, the provisions of section 204(f) shall not apply.”.

SEC. 1285. REPORTING REQUIREMENTS IN ELECTRIC POWER SALES AND TRANSMISSION.

(a) Audit Trails.--Section 304 of the Federal Power Act is amended by adding the following new subsection at the end thereof:

“(c)(1) The Commission shall, by rule or order, require each person or other entity engaged in the transmission of electric energy in interstate commerce or the sale of electric energy at wholesale in interstate commerce, and each broker, dealer, and power marketer involved in any such transmission or sale, to maintain, and periodically submit to the Commission, such records, in electronic form, of each transaction relating to such transmission or sale as may be necessary to determine whether any person has employed any fraudulent, manipulative, or deceptive device or contrivance in contravention of rules promulgated by the Commission.

“(2) Section 201(f) shall not limit the application of this subsection.”.

(b) Natural Gas.--Section 8 of the Natural Gas Act is amended by adding the following new subsection at the end thereof:

“(d) The Commission shall, by rule or order, require each person or other entity engaged in the transportation of natural gas in interstate commerce, or the sale in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use, and each broker, dealer, and power marketer involved in any such transportation or sale, to maintain, and periodically submit to the Commission, such records, in electronic form, of each transaction relating to such transmission or sale as may be necessary to determine whether any person has employed any fraudulent, manipulative, or deceptive device or contrivance in contravention of rules promulgated by the Commission.”.

SEC. 1286. TRANSPARENCY.

(a) Definition.--As used in this section the term “electric power or natural gas information processor” means any person engaged in the business of--

(1) collecting, processing, or preparing for distribution or publication, or assisting, participating in, or coordinating the distribution or publication of, information with respect to transactions in or quotations involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas, or

(2) distributing or publishing (whether by means of a ticker tape, a communications network, a terminal display device, or otherwise) on a current and continuing basis, information with respect to such transactions or quotations. The term does not include any bona fide newspaper, news magazine, or business or financial publication of general and regular circulation, any self-regulatory organization, any bank, broker, dealer, building and loan, savings and loan, or homestead association, or cooperative bank, if such bank, broker, dealer, association, or cooperative bank would be deemed to be an electric power or natural gas information processor solely by reason of functions performed by such institutions as part of customary banking, brokerage, dealing, association, or cooperative bank activities, or any common carrier, as defined in section 3 of the Communications Act of 1934, subject to the jurisdiction of the Federal Communications Commission or a State commission, as defined in section 3 of that Act, unless the Commission determines that such carrier is engaged in the business of collecting, processing, or preparing for distribution or publication, information with respect to transactions in or quotations involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas.

(b) Prohibition.--No electric power or natural gas information processor may make use of the mails or any means or instrumentality of interstate commerce--

(1) to collect, process, distribute, publish, or prepare for distribution or publication any information with respect to quotations for, or transactions involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas, or

(2) to assist, participate in, or coordinate the distribution or publication of such information in contravention of such rules and regulations as the Federal Energy Regulatory Commission shall prescribe as necessary or appropriate in the public interest to

(A) prevent the use, distribution, or publication of fraudulent, deceptive, or manipulative information with respect to quotations for and transactions involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas;

(B) assure the prompt, accurate, reliable, and fair collection, processing, distribution, and publication of information with respect to quotations for and transactions involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas, and the fairness and usefulness of the form and content of such information;

(C) assure that all such information processors may, for purposes of distribution and publication, obtain on fair and reasonable terms such information with respect to quotations for and transactions involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas as is collected, processed, or prepared for distribution or publication by any exclusive processor of such information acting in such capacity;

(D) assure that, subject to such limitations as the Commission, by rule, may impose as necessary or appropriate for the maintenance of fair and orderly markets, all persons may obtain on terms which are not unreasonably discriminatory such information with respect to quotations for and transactions involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas as is published or distributed by any electric power or natural gas information processor;

(E) assure that all electricity and natural gas electronic communication networks transmit and direct orders for the purchase and sale of electricity or natural gas in a manner consistent with the establishment and operation of an efficient, fair, and orderly market system for electricity and natural gas; and

(F) assure equal regulation of all markets involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas and all persons effecting transactions involving the purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas.

(c) Related Commodities.--For purposes of this section, the phrase “purchase or sale of electric power, natural gas, the transmission of electric energy, or the transportation of natural gas” includes the purchase or sale of any commodity (as defined in the Commodities Exchange Act) relating to any such purchase or sale if such commodity is excluded from regulation under the Commodities Exchange Act pursuant to section 2 of that Act.

(d) Prohibition.--No person who owns, controls, or is under the control or ownership of a public utility, a natural gas company, or a public utility holding company may own, control, or operate any electronic computer network or other mulitateral trading facility utilized to trade electricity or natural gas.

SEC. 1287. PENALTIES.

(a) Criminal Penalties.--Section 316 of the Federal Power Act (16 U.S.C. 825o(c)) is amended as follows:

(1) By striking “$5,000” in subsection (a) and inserting “$5,000,000 for an individual and $25,000,000 for any other defendant” and by striking out “two years” and inserting “five years” .

(2) By striking “$500” in subsection (b) and inserting “$1,000,000”.

(3) By striking subsection (c).

(b) Civil Penalties.--Section 316A of the Federal Power Act (16 U.S.C. 825o091) is amended as follows:

(1) By striking “section 211, 212, 213, or 214” each place it appears and inserting “Part II”.

(2) By striking “$10,000 for each day that such violation continues” and inserting “the greater of $1,000,000 or three times the profit made or gain or loss avoided by reason of such violation”.

(3) By adding the following at the end thereof:

“(c) Authority of a Court to Prohibit Persons From Certain Activities.--In any proceeding under this section, the court may censure, place limitations on the activities, functions, or operations of, suspend or revoke the ability of any entity (without regard to section 201(f)) to participate in the transmission of electric energy in interstate commerce or the sale of electric energy at wholesale in interstate commerce if it finds that such censure, placing of limitations, suspension, or revocation is in the public interest and that one or more of the following applies to such entity:

“(1) Such entity has willfully made or caused to be made in any application or report required to be filed with the Commission or with any other appropriate regulatory agency, or in any proceeding before the Commission, any statement which was at the time and in the light of the circumstances under which it was made false or misleading with respect to any material fact, or has omitted to state in any such application or report any material fact which is required to be stated therein.

“(2) Such entity has been convicted of any felony or misdemeanor or of a substantially equivalent crime by a foreign court of competent jurisdiction which the court finds--

“(A) involves the purchase or sale of electricity, the taking of a false oath, the making of a false report, bribery, perjury, burglary, any substantially equivalent activity however denominated by the laws of the relevant foreign government, or conspiracy to commit any such offense;

“(B) arises out of the conduct of the business of transmitting electric energy in interstate commerce or selling or purchasing electric energy at wholesale in interstate commerce;

“(C) involves the larceny, theft, robbery, extortion, forgery, counterfeiting, fraudulent concealment, embezzlement, fraudulent conversion, or misappropriation of funds, or securities, or substantially equivalent activity however denominated by the laws of the relevant foreign government; or

“(D) involves the violation of section 152, 1341, 1342, or 1343 or chapter 25 or 47 of title 18, United States Code, or a violation of a substantially equivalent foreign statute.

“(3) Such entity is permanently or temporarily enjoined by order, judgment, or decree of any court of competent jurisdiction from acting as an investment adviser, underwriter, broker, dealer, municipal securities dealer, government securities broker, government securities dealer, transfer agent, foreign person performing a function substantially equivalent to any of the above, or entity or person required to be registered under the Commodity Exchange Act or any substantially equivalent foreign statute or regulation, or as an affiliated person or employee of any investment company, bank, insurance company, foreign entity substantially equivalent to any of the above, or entity or person required to be registered under the Commodity Exchange Act or any substantially equivalent foreign statute or regulation, or from engaging in or continuing any conduct or practice in connection with any such activity, or in connection with the purchase or sale of any security.

“(4) Such entity has willfully violated any provision of this Act.

“(5) Such entity has willfully aided, abetted, counseled, commanded, induced, or procured the violation by any other person of any provision of this Act, or has failed reasonably to supervise, with a view to preventing violations of the provisions of this Act, another person who commits such a violation, if such other person is subject to his supervision. For the purposes of this paragraph no person shall be deemed to have failed reasonably to supervise any other person, if--

“(A) there have been established procedures, and a system for applying such procedures, which would reasonably be expected to prevent and detect, insofar as practicable, any such violation by such other person, and

“(B) such person has reasonably discharged the duties and obligations incumbent upon him by reason of such procedures and system without reasonable cause to believe that such procedures and system were not being complied with.

“(6) Such entity has been found by a foreign financial or energy regulatory authority to have--

“(A) made or caused to be made in any application or report required to be filed with a foreign regulatory authority, or in any proceeding before a foreign financial or energy regulatory authority, any statement that was at the time and in the light of the circumstances under which it was made false or misleading with respect to any material fact, or has omitted to state in any application or report to the foreign regulatory authority any material fact that is required to be stated therein;

“(B) violated any foreign statute or regulation regarding the transmission or sale of electricity or natural gas;

“(C) aided, abetted, counseled, commanded, induced, or procured the violation by any person of any provision of any statutory provisions enacted by a foreign government, or rules or regulations thereunder, empowering a foreign regulatory authority regarding transactions in electricity or natural gas, or contracts of sale of electricity or natural gas, traded on or subject to the rules of a contract market or any board of trade, or has been found, by a foreign regulatory authority, to have failed reasonably to supervise, with a view to preventing violations of such statutory provisions, rules, and regulations, another person who commits such a violation, if such other person is subject to his supervision.

“(7) Such entity is subject to any final order of a State commission (or any agency or officer performing like functions), State authority that supervises or examines banks, savings associations, or credit unions, State insurance commission (or any agency or office performing like functions), an appropriate Federal banking agency (as defined in section 3 of the Federal Deposit Insurance Act (12 U.S.C. 1813(q))), or the National Credit Union Administration, that--

“(A) bars such person from association with an entity regulated by such commission, authority, agency, or officer, or from engaging in the business of securities, insurance, banking, savings association activities, or credit union activities; or

“(B) constitutes a final order based on violations of any laws or regulations that prohibit fraudulent, manipulative, or deceptive conduct.”

(4) Such entity is subject to statutory disqualification within the meaning of section 3(a)(39) of the Securities Exchange Act of 1934.".

(c) Natural Gas Act Penalties.--Section 21 of the Natural Gas Act is amended by adding the following new subsection at the end thereof:

“(c) Authority of a Court to Prohibit Persons From Certain Activities.--In any proceeding under this section, the court may censure, place limitations on the activities, functions, or operations of, suspend or revoke the ability of any entity (without regard to section 201(f)) to participate in the transportation of natural gas in interstate commerce, or the sale in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use if it finds that such censure, placing of limitations, suspension, or revocation is in the public interest and that one or more of the following applies to such entity:

“(1) Such entity has willfully made or caused to be made in any application or report required to be filed with the Commission or with any other appropriate regulatory agency, or in any proceeding before the Commission, any statement which was at the time and in the light of the circumstances under which it was made false or misleading with respect to any material fact, or has omitted to state in any such application or report any material fact which is required to be stated therein.

“(2) Such entity has been convicted of any felony or misdemeanor or of a substantially equivalent crime by a foreign court of competent jurisdiction which the court finds--

“(A) involves the purchase or sale of natural gas, the taking of a false oath, the making of a false report, bribery, perjury, burglary, any substantially equivalent activity however denominated by the laws of the relevant foreign government, or conspiracy to commit any such offense;

“(B) arises out of the conduct of the business of transmitting natural gas in interstate commerce, or the selling in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use;

“(C) involves the larceny, theft, robbery, extortion, forgery, counterfeiting, fraudulent concealment, embezzlement, fraudulent conversion, or misappropriation of funds, or securities, or substantially equivalent activity however denominated by the laws of the relevant foreign government; or

“(D) involves the violation of section 152, 1341, 1342, or 1343 or chapter 25 or 47 of title 18, United States Code, or a violation of a substantially equivalent foreign statute.

“(3) Such entity is permanently or temporarily enjoined by order, judgment, or decree of any court of competent jurisdiction from acting as an investment adviser, underwriter, broker, dealer, municipal securities dealer, government securities broker, government securities dealer, transfer agent, foreign person performing a function substantially equivalent to any of the above, or entity or person required to be registered under the Commodity Exchange Act or any substantially equivalent foreign statute or regulation, or as an affiliated person or employee of any investment company, bank, insurance company, foreign entity substantially equivalent to any of the above, or entity or person required to be registered under the Commodity Exchange Act or any substantially equivalent foreign statute or regulation, or from engaging in or continuing any conduct or practice in connection with any such activity, or in connection with the purchase or sale of any security.

“(4) Such entity has willfully violated any provision of this Act.

“(5) Such entity has willfully aided, abetted, counseled, commanded, induced, or procured the violation by any other person of any provision of this Act, or has failed reasonably to supervise, with a view to preventing violations of the provisions of this Act, another person who commits such a violation, if such other person is subject to his supervision. For the purposes of this paragraph no person shall be deemed to have failed reasonably to supervise any other person, if--

“(A) there have been established procedures, and a system for applying such procedures, which would reasonably be expected to prevent and detect, insofar as practicable, any such violation by such other person, and

“(B) such person has reasonably discharged the duties and obligations incumbent upon him by reason of such procedures and system without reasonable cause to believe that such procedures and system were not being complied with.

“(6) Such entity has been found by a foreign financial or energy regulatory authority to have--

“(A) made or caused to be made in any application or report required to be filed with a foreign regulatory authority, or in any proceeding before a foreign financial or energy regulatory authority, any statement that was at the time and in the light of the circumstances under which it was made false or misleading with respect to any material fact, or has omitted to state in any application or report to the foreign regulatory authority any material fact that is required to be stated therein;

“(B) violated any foreign statute or regulation regarding the transmission or sale of electricity or natural gas;

“(C) aided, abetted, counseled, commanded, induced, or procured the violation by any person of any provision of any statutory provisions enacted by a foreign government, or rules or regulations thereunder, empowering a foreign regulatory authority regarding transactions in electricity or natural gas, or contracts of sale of electricity or natural gas, traded on or subject to the rules of a contract market or any board of trade, or has been found, by a foreign regulatory authority, to have failed reasonably to supervise, with a view to preventing violations of such statutory provisions, rules, and regulations, another person who commits such a violation, if such other person is subject to his supervision.

“(7) Such entity is subject to any final order of a State commission (or any agency or officer performing like functions), State authority that supervises or examines banks, savings associations, or credit unions, State insurance commission (or any agency or office performing like functions), an appropriate Federal banking agency (as defined in section 3 of the Federal Deposit Insurance Act (12 U.S.C. 1813(q))), or the National Credit Union Administration, that--

“(A) bars such person from association with an entity regulated by such commission, authority, agency, or officer, or from engaging in the business of securities, insurance, banking, savings association activities, or credit union activities; or

“(B) constitutes a final order based on violations of any laws or regulations that prohibit fraudulent, manipulative, or deceptive conduct.

“(8) Such entity is subject to statutory disqualification within the meaning of section 3(a)(39) of the Securities Exchange Act of 1934.”.

SEC. 1288. REVIEW OF PUHCA EXEMPTIONS.

Not later than 12 months after the enactment of this Act the Securities and Exchange Commission shall review each exemption granted to any person under section 3(a) of the Public Utility Holding Company Act of 1935 and shall review the action of persons operating pursuant to a claim of exempt status under section 3 to determine if such exemptions and claims are consistent with the requirements of such section 3(a) and whether or not such exemptions or claims of exemption should continue in force and effect.

SEC. 1289. REVIEW OF ACCOUNTING FOR CONTRACTS INVOLVED IN ENERGY TRADING.

Not later than 12 months after the enactment of this Act, the Comptroller General of the United States shall submit to the Congress a report of the results of its review of accounting for contracts in energy trading and risk management activities. The review and report shall include, among other issues, the use of mark-to-market accounting and when gains and losses should be recognized, with a view toward improving the transparency of energy trading activities for the benefit of investors, consumers, and the integrity of these markets.

SEC. 1290. PROTECTION OF FERC REGULATED SUBSIDIARIES.

Section 205 of the Federal Power Act is amended by adding after subsection (f) the following new subsection:

“(g) Rules and Procedures to Protect Consumers of Public Utilities.--Not later than 9 months after the date of enactment of this Act, the Commission shall adopt rules and procedures for the protection of electric consumers from self-dealing, interaffiliate abuse, and other harmful actions taken by persons owning or controlling public utilities. Such rules shall ensure that no asset of a public utility company shall be used as collateral for indebtedness incurred by the holding company of, and any affiliate of, such public utility company, and no public utility shall acquire or own any securities of the holding company or other affiliates of the holding company unless the Commission has determined that such acquisition or ownership is consistent with the public interest and the protection of consumers of such public utility.”.

SEC. 1291. REFUNDS UNDER THE FEDERAL POWER ACT.

Section 206(b) of the Federal Power Act is amended as follows:

(1) By amending the first sentence to read as follows: “In any proceeding under this section, the refund effective date shall be the date of the filing of a complaint or the date of the Commission motion initiating the proceeding, except that in the case of a complaint with regard to market-based rates, the Commission may establish an earlier refund effective date.”.

(2) By striking the second and third sentences.

(3) By striking out “the refund effective date or by” and “, whichever is earlier,” in the fifth sentence.

(4) In the seventh sentence by striking “through a date fifteen months after such refund effective date” and insert “and prior to the conclusion of the proceeding” and by striking the proviso.

SEC. 1292. ACCOUNTS AND REPORTS.

Section 318 of the Federal Power Act is amended by adding the following at the end thereof: “This section shall not apply to sections 301 and 304 of this Act.”.

SEC. 1293. MARKET-BASED RATES.

Section 205 of the Federal Power Act is amended by adding the following new subsection at the end thereof:

“(g) For each public utility granted the authority by the Commission to sell electric energy at market-based rates, the Commission shall review the activities and characteristics of such utility not less frequently than annually to determine whether such rates are just and reasonable. Each such utility shall notify the Commission promptly of any change in the activities and characteristics relied upon by the Commission in granting such public utility the authority to sell electric energy at market-based rates. If the Commission finds that:

“(1) a rate charged by a public utility authorized to sell electric energy at market-based rates is unjust, unreasonable, unduly discriminatory or preferential,

“(2) the public utility has intentionally engaged in an activity that violates any other rule, tariff, or order of the Commission, or

“(3) any violation of the Electric Reliability Act of 2005, the Commission shall issue an order immediately modifying or revoking the authority of that public utility to sell electric energy at market-based rates.”.

SEC. 1294. ENFORCEMENT.

(a) Complaints.--Section 306 of the Federal Power Act (16 U.S.C. 825e) is amended as follows:

(1) By inserting “electric utility,” after “Any person,”.

(2) By inserting “, transmitting utility,” after “licensee” each place it appears.

(b) Review of Commission Orders.--Section 313(a) of the Federal Power Act (16 U.S.C. 8251) is amended by inserting “electric utility,” after “person,” in the first 2 places it appears and by striking “any person unless such person” and inserting “any entity unless such entity”.

(c) Investigations.--Section 307(a) of the Federal Power Act (16 U.S.C. 825f(a)) is amended as follows:

(1) By inserting “, electric utility, transmitting utility, or other entity” after “person” each time it appears.

(2) By striking the period at the end of the first sentence and inserting the following: “or in obtaining information about the sale of electric energy at wholesale in interstate commerce and the transmission of electric energy in interstate commerce.”.

SEC. 1295. CONSUMER PRIVACY AND UNFAIR TRADE PRACTICES.

(a) Privacy.--The Federal Trade Commission may issue rules protecting the privacy of electric consumers from the disclosure of consumer information obtained in connection with the sale or delivery of electric energy to electric consumers.

(b) Slamming.--The Federal Trade Commission may issue rules prohibiting the change of selection of an electric utility except with the informed consent of the electric consumer or if approved by the appropriate State regulatory authority.

(c) Cramming.--The Federal Trade Commission may issue rules prohibiting the sale of goods and services to an electric consumer unless expressly authorized by law or the electric consumer.

(d) Rulemaking.--The Federal Trade Commission shall proceed in accordance with section 553 of title 5, United States Code, when prescribing a rule under this section.

(e) State Authority.--If the Federal Trade Commission determines that a State's regulations provide equivalent or greater protection than the provisions of this section, such State regulations shall apply in that State in lieu of the regulations issued by the Commission under this section.

(f) Definitions.--For purposes of this section:

(1) State regulatory authority.--The term “State regulatory authority” has the meaning given that term in section 3(21) of the Federal Power Act (16 U.S.C. 796(21)).

(2) Electric consumer and electric utility.--The terms “electric consumer” and “electric utility” have the meanings given those terms in section 3 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2602).

“(d) The Commission shall, by rule or order, require each person or other entity engaged in the transportation of natural gas in interstate commerce, or the sale in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use, and each broker, dealer, and power marketer involved in any such transportation or sale, to maintain, and periodically submit to the Commission, such records, in electronic form, of each transaction relating to such transmission or sale as may be necessary to determine whether any person has employed any fraudulent, manipulative, or deceptive device or contrivance in contravention of rules promulgated by the Commission.”.

SEC. 1296. SAVINGS PROVISION.

Nothing in this title or in any amendment made by this title shall be construed to affect the authority of any court to make a determination in any proceeding commenced before the enactment of this Act regarding the authority of the Federal Energy Regulatory Commission to permit any person to sell or distribute electric energy at market-based rates.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

6 earlier actions
Floor Latest Action

House amendment offered

April 20, 2005

View full timeline
Floor

House amendment offered

April 20, 2005

Floor

House amendment not agreed to: On agreeing to the Dingell amendment (A002) Failed by recorded vote: 188 - 243 (Roll no. 123).

April 20, 2005 • 10:12 PM

Floor

Roll call votes on amendments in House

April 20, 2005 • 10:12 PM

Not Used

Amendment failed in Committee of the Whole

April 20, 2005 • 10:12 PM

Not Used

House amendment offered/reported by : Amendment (A002) offered by Mr. Dingell.(consideration: CR H2325-2334, H2380; text: CR H2325-2332)

April 20, 2005 • 5:11 PM

Floor

Amendment (A002) offered by Mr. Dingell. (consideration: CR H2325-2334, H2380; text: CR H2325-2332)

April 20, 2005 • 5:11 PM

Floor

On agreeing to the Dingell amendment (A002) Failed by recorded vote: 188 - 243 (Roll no. 123).

April 20, 2005 • 10:12 PM