To improve the provisions relating to the linking of award and incentive fees to acquisition outcomes.
What it does: Replaces “poor” with “below-satisfactory performance or performance that does not meet the basic requirements o…”What it changes
1 change to S. 2766 · shown in the bill's text
Replaces “poor” with “below-satisfactory performance or performance that does not meet the basic requirements o…”
In S. 2766 · Placed on Calendar Senate
(3) establish standards for determining the percentage of the available award fee, if any, which contractors should be paid for performance that is judged to be "acceptable", "average", "expected", "good", or "satisfactory";
(4) ensure that no award fee may be paid for contractor performance that is judged to be
[struck: poor][inserted: below-satisfactory performance or performance that does not meet the basic requirements of the contract];(5) provide specific direction on the circumstances, if any, in which it may be appropriate to roll over award fees that are not earned in one award fee period to a subsequent award fee period or periods;
Original wording
On page 345, line 2, strike “poor” and insert “below-satisfactory performance or performance that does not meet the basic requirements of the contract”.
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
On page 345, line 2, strike “poor” and insert “below-satisfactory performance or performance that does not meet the basic requirements of the contract”.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Senate amendment proposed (on the floor): Amendment SA 4371 proposed by Senator Warner for Senator Coburn.
June 22, 2006
View full timeline
Senate amendment proposed (on the floor): Amendment SA 4371 proposed by Senator Warner for Senator Coburn.
June 22, 2006
Senate amendment agreed to: Amendment SA 4371 agreed to in Senate by Unanimous Consent.
June 22, 2006
Amendment SA 4371 proposed by Senator Warner for Senator Coburn. (consideration: CR S6346-6366; text: CR S6356) To improve the provisions relating to the linking of award and incentive fees to acquisition outcomes.
June 22, 2006
Amendment SA 4371 agreed to in Senate by Unanimous Consent.
June 22, 2006
Senate amendment submitted
June 20, 2006