To ensure the timely completion of the equity finalization process for Navel Petroleum Reserve Numbered 1.
What it does: Adds TITLE XXXIII--NAVAL PETROLEUM RESERVES at the end of division CWhat it changes
1 change to S. 2766 · shown in the bill's text
Adds TITLE XXXIII--NAVAL PETROLEUM RESERVES at the end of division C
Adds a titleIn S. 2766 · Public Print
Passed the Senate June 22, 2006.
Inserted: TITLE XXXIII--NAVAL PETROLEUM RESERVES
Inserted: SEC. 3301. COMPLETION OF EQUITY FINALIZATION PROCESS FOR NAVAL PETROLEUM RESERVE NUMBERED 1.
Inserted: Section 3412(g) of the National Defense Authorization Act for Fiscal Year 1996 (Public Law 104-106; 10 U.S.C. 7420 note) is amended--
Inserted: (1) by inserting "(1)" after "(g)"; and
Inserted: (2) by adding at the end the following new paragraph:
Inserted: "(2)(A) In light of the unique role that the independent petroleum engineer who is retained pursuant to paragraph (b)(2) performs in the process of finalizing equity interests, and the importance to the United States taxpayer of timely completion of the equity finalization process, the independent petroleum engineer's 'Shallow Oil Zone Provisional Recommendation of Equity Participation,' which was presented to the equity finalization teams for the Department of Energy and Chevron U.S.A. Inc. on October 1 and 2, 2002, shall become the final equity recommendation of the independent petroleum engineer, as that term is used in the Protocol on NPR-1 Equity Finalization Implementation Process, July 8, 1996, for the Shallow Oil Zone unless the Department of Energy and Chevron U.S.A. Inc. agree in writing not later than 60 days after the date of the enactment of this paragraph that the independent petroleum engineer shall not be liable to either party for any cost or expense incurred or for any loss or damage sustained--
Inserted: "(i) as a result of the manner in which services are performed by the independent petroleum engineer in accordance with its contract with the Department of Energy to support the equity determination process;
Inserted: "(ii) as a result of the failure of the independent petroleum engineer in good faith to perform any service or make any determination or computation, unless caused by its gross negligence; or
Inserted: "(iii) as a result of the reliance by either party on any computation, determination, estimate or evaluation made by the independent petroleum engineer unless caused by the its gross negligence or willful misconduct.
Inserted: "(B) If Chevron U.S.A. Inc. agrees in writing not later than 60 days after the date of the enactment of this paragraph that the independent petroleum engineer shall not be liable to Chevron U.S.A. Inc. or the Department of Energy for any cost or expense incurred or for any loss or damage described in clauses (i) through (iii) of subparagraph (A), the Department of Energy shall agree to the same not later than such date.".
Original wording
At the end of division C, add the following:
Read automatically from the Congressional Record. Check the original before relying on it.
As printed
SA 4516. Mr. WARNER proposed an amendment to the bill S. 2766, to authorize appropriations for fiscal year 2007 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe personnel strengths for such fiscal year for the Armed Forces, and for other purposes; as follows:
At the end of division C, add the following:
TITLE XXXIII--NAVAL PETROLEUM RESERVES
SEC. 3301. COMPLETION OF EQUITY FINALIZATION PROCESS FOR NAVAL PETROLEUM RESERVE NUMBERED 1.
Section 3412(g) of the National Defense Authorization Act for Fiscal Year 1996 (Public Law 104-106; 10 U.S.C. 7420 note) is amended--
(1) by inserting “(1)” after “(g)”; and
(2) by adding at the end the following new paragraph:
“(2)(A) In light of the unique role that the independent petroleum engineer who is retained pursuant to paragraph (b)(2) performs in the process of finalizing equity interests, and the importance to the United States taxpayer of timely completion of the equity finalization process, the independent petroleum engineer's ‘Shallow Oil Zone Provisional Recommendation of Equity Participation,' which was presented to the equity finalization teams for the Department of Energy and Chevron U.S.A. Inc. on October 1 and 2, 2002, shall become the final equity recommendation of the independent petroleum engineer, as that term is used in the Protocol on NPR-1 Equity Finalization Implementation Process, July 8, 1996, for the Shallow Oil Zone unless the Department of Energy and Chevron U.S.A. Inc. agree in writing not later than 60 days after the date of the enactment of this paragraph that the independent petroleum engineer shall not be liable to either party for any cost or expense incurred or for any loss or damage sustained--
“(i) as a result of the manner in which services are performed by the independent petroleum engineer in accordance with its contract with the Department of Energy to support the equity determination process;
“(ii) as a result of the failure of the independent petroleum engineer in good faith to perform any service or make any determination or computation, unless caused by its gross negligence; or
“(iii) as a result of the reliance by either party on any computation, determination, estimate or evaluation made by the independent petroleum engineer unless caused by the its gross negligence or willful misconduct.
“(B) If Chevron U.S.A. Inc. agrees in writing not later than 60 days after the date of the enactment of this paragraph that the independent petroleum engineer shall not be liable to Chevron U.S.A. Inc. or the Department of Energy for any cost or expense incurred or for any loss or damage described in clauses (i) through (iii) of subparagraph (A), the Department of Energy shall agree to the same not later than such date.”.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Senate amendment submitted
June 22, 2006
View full timeline
Senate amendment submitted
June 22, 2006
Senate amendment proposed (on the floor): Amendment SA 4516 proposed by Senator Warner.(consideration: CR S6346-6366; text: CR S6357)
June 22, 2006
Senate amendment agreed to: Amendment SA 4516 agreed to in Senate by Unanimous Consent.
June 22, 2006
Amendment SA 4516 proposed by Senator Warner. (consideration: CR S6346-6366; text: CR S6357) To ensure the timely completion of the equity finalization process for Navel Petroleum Reserve Numbered 1.
June 22, 2006
Amendment SA 4516 agreed to in Senate by Unanimous Consent.
June 22, 2006