S.Amdt. 5179Senate109th Congress (2005-2007)

To require as part of the implementation and compliance report an estimate of uranium use and an analysis of the production rate of nuclear explosive devices.

What it does: Replaces “existing” through “description” with new text
Submitted November 16, 2006

What it changes

1 change to S. 3709

Replaces text

The Congressional Record cuts off the end of this amendment, so some changes may be missing.

  1. Replaces “existing” through “description” with new text

    ReplacesPage 18, lines 7–9Printed page

    Struck: existing … description

    Inserted: existing agreements;

    Inserted: (6) an estimate of--

    Inserted: (A) the amount of uranium mined in India during the previous year;

    Inserted: (B) the amount of such uranium that has likely been used or allocated for the production of nuclear explosive devices; and

    Inserted: (C) the rate of production in India of--

    Inserted: (i) fissile material for nuclear explosive devices; and

    Inserted: (ii) nuclear explosive devices;

    Inserted: (7) an analysis as to whether imported uranium has affected the rate of production in India of nuclear explosive devices; and

    Inserted: (8) a detailed description

    Original wording

    On page 18, beginning on line 7, strike “existing” and all that follows through “description” on line 9 and insert the following: “existing agreements;

Read automatically from the Congressional Record. Check the original before relying on it.

As printed

SA 5179. Mr. LUGAR (for Mr. Bingaman) proposed an amendment to the bill S. 3709, to exempt from certain requirements of the Atomic Energy Act of 1954 United States exports of nuclear materials, equipment, and technology to India, and to implement the United States Additional Protocol; as follows:

On page 18, beginning on line 7, strike “existing” and all that follows through “description” on line 9 and insert the following: “existing agreements;

(6) an estimate of--

(A) the amount of uranium mined in India during the previous year;

(B) the amount of such uranium that has likely been used or allocated for the production of nuclear explosive devices; and

(C) the rate of production in India of--

(i) fissile material for nuclear explosive devices; and

(ii) nuclear explosive devices;

(7) an analysis as to whether imported uranium has affected the rate of production in India of nuclear explosive devices; and

(8) a detailed description

Legislative Activity

Stay on top of the latest movement without scrolling through every action

4 earlier actions
Floor Latest Action

Senate amendment submitted

November 16, 2006

View full timeline
Floor

Senate amendment submitted

November 16, 2006

Floor

Senate amendment proposed (on the floor): Amendment SA 5179 proposed by Senator Lugar for Senator Bingaman.

November 16, 2006

Floor

Senate amendment agreed to: Amendment SA 5179 agreed to in Senate by Unanimous Consent.

November 16, 2006

Floor

Amendment SA 5179 proposed by Senator Lugar for Senator Bingaman. (consideration: CR S11002-11003; text: CR S11003) To require as part of the implementation and compliance report an estimate of uranium use and an analysis of the production rate of nuclear explosive devices.

November 16, 2006

Floor

Amendment SA 5179 agreed to in Senate by Unanimous Consent.

November 16, 2006