To improve the high-speed magnetic levitation system deployment program.
Legislative Activity
Stay on top of the latest movement without scrolling through every action
Senate amendment proposed (on the floor): Amendment SA 666 proposed by Senator Inhofe for Senator Specter to Amendment SA 605.(consideration: CR S5019-5025)
May 12, 2005
View full timeline
Senate amendment proposed (on the floor): Amendment SA 666 proposed by Senator Inhofe for Senator Specter to Amendment SA 605.(consideration: CR S5019-5025)
May 12, 2005
Senate amendment agreed to: Amendment SA 666 as modified agreed to in Senate by Unanimous Consent.(text as modified: CR S5022-5023)
May 12, 2005
Amendment SA 666 proposed by Senator Inhofe for Senator Specter to Amendment SA 605. (consideration: CR S5019-5025) To improve the high-speed magnetic levitation system deployment program.
May 12, 2005
Amendment SA 666 as modified agreed to in Senate by Unanimous Consent. (text as modified: CR S5022-5023)
May 12, 2005
Senate amendment submitted
May 11, 2005
Text
Submitted
SA 666. Mr. SPECTER submitted an amendment intended to be proposed to amendment SA 605 proposed by Mr. Inhofe to the bill H.R. 3, to authorize funds for Federal-aid highways, highway safety programs, and transit programs, and for other purposes; which was ordered to lie on the table; as follows: Beginning on page 398, strike line 17 and all that follows through page 400, line 13, and insert the following: SEC. 1819. HIGH-SPEED MAGNETIC LEVITATION SYSTEM DEPLOYMENT PROGRAM. (a) In General.--Section 322 of title 23, United States Code, is amended to read as follows: ``Sec. 322. High-speed magnetic levitation system deployment program ``(a) Definitions.--In this section: ``(1) Administrator.--The term `Administrator' means the Administrator of the Federal Railroad Administration. ``(2) Eligible project costs.-- ``(A) In general.--The term `eligible project costs' means the capital cost of the fixed guideway infrastructure of a MAGLEV project, including land, piers, guideways, propulsion equipment and other components attached to guideways, power distribution facilities (including substations), control and communications facilities, access roads, and storage, repair, and maintenance facilities. ``(B) Inclusion.--The term `eligible project costs' includes the costs of preconstruction planning activities. ``(C) Exclusion.--The term `eligible project costs' does not include costs incurred for a new station. ``(3) Full project costs.--The term `full project costs' means the total capital costs of a MAGLEV project, including eligible project costs and the costs of stations, vehicles, and equipment. ``(4) Maglev.-- ``(A) In general.--The term `MAGLEV' means transportation systems in revenue service employing magnetic levitation that would be capable of safe use by the public at a speed in excess of 240 miles per hour. ``(B) Inclusion.--The term `MAGLEV' includes power, control, and communication facilities required for the safe operation of the vehicles within a system described in subparagraph (A). ``(b) Phase I--Preconstruction Planning.-- ``(1) In general.--A State, State-designated authority, multi-State-designated authority, or special purpose entity may apply to the Administrator for grants to conduct preconstruction planning for proposed new MAGLEV projects, or extensions to MAGLEV systems planned, studied, or deployed under this or any other program. ``(2) Applications.--An application for a grant under this subsection shall include a description of the proposed MAGLEV project, including, at a minimum-- ``(A) a description of the purpose and need for the proposed project; ``(B) a description of the travel market to be served; ``(C) a description of the technology selected for the project; ``(D) forecasts of ridership and revenues; ``(E) a description of preliminary engineering that is sufficient to provide a reasonable estimate of the capital cost of constructing, operating, and maintaining the project; ``(F) a realistic schedule for construction and equipment for the project; ``(G) an environmental analysis in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); ``(H) a preliminary identification of the 1 or more organizations that will construct and operate the project; and ``(I) a cost-benefit analysis and tentative financial plan for construction and operation of the project. ``(3) Deadline for applications.--The Administrator shall establish an annual deadline for receipt of applications under this subsection. ``(4) Evaluation.--The Administrator shall evaluate all applications received by the annual deadline to determine whether the applications meet criteria established by the Administrator. [[Page S4979]] ``(5) Selection.--The Administrator shall select for Federal support for preconstruction planning any project that the Administrator determines meets the criteria. ``(c) Phase II--environmental Analyses.-- ``(1) In general.--A State, State-designated authority, multi-State-designated authority, or special purpose entity that has conducted (under this section or any other provision of law) 1 or more studies that address each of the requirements of subsection (b)(2) may submit the studies to the Administrator, to support an application for Federal funding to assist in-- ``(A) preparing an environmental analysis under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and ``(B) planning for construction, operation, and maintenance of a MAGLEV project. ``(2) Criteria for applications.-- ``(A) In general.--The Administrator shall-- ``(i) establish criteria for Phase II applications; and ``(ii) evaluate all applications received by that deadline in accordance with criteria established under subparagraph (B). ``(B) Criteria.--The Administrator shall establish criteria to evaluate applications that include whether-- ``(i) the technology selected is available for deployment at the time of the application; ``(ii) operating revenues combined with known and dedicated sources of other revenues in any year will exceed annual operation and maintenance costs; ``(iii) over the life of the MAGLEV project, total project benefits will exceed total project costs; and ``(iv) the proposed capital financing plan is realistic and does not assume Federal assistance that is greater than the maximums specified in clause (ii). ``(C) Projects selected.--If the Administrator determines that a MAGLEV project meets the criteria established under subparagraph (B), the Administrator may-- ``(i) select that project for Federal Phase II support; and ``(ii) publish in the Federal Register a notice of intent to prepare an environmental analysis under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). ``(d) Phase III--Deployment.--A proposed owner of a MAGLEV project that has submitted a draft environmental analysis under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and has refined planning for the construction, operation, and maintenance of the MAGLEV project, under this or any other program, may submit an application to the Administrator for Federal funding of a portion of the capital costs of planning, financing, constructing, and equipping the preferred alternative identified in the environmental analysis. ``(e) Financial Assistance.-- ``(1) In general.--The Secretary shall make available financial assistance to pay the Federal share of the full project costs of projects selected under this section. ``(2) Prevailing wage and buy america requirements.-- Sections 5333(a) and 5323(j) of title 49 shall apply to financial assistance made available under this section and projects funded with that assistance. ``(3) Federal share.-- ``(A) Phase i and phase ii.--For Phase I--preconstruction planning and Phase II--environmental analyses carried out under subsections (b) and (c), respectively, the Federal share of the costs of the planning and studies shall be not more than \2/3\ of the full cost of the planning and studies. ``(B) Phase iii.--For Phase III--deployment projects carried out under subsection (d), not more than \2/3\ of the full capital cost of such a project shall be made available from funds appropriated for this program. ``(4) Funding.-- ``(A) Contract authority; authorization of appropriations.-- ``(i) In general.--There is authorized to be appropriated from the Highway Trust Fund (other than the Mass Transit Account) for fiscal years 2005 through 2009 to carry out this section-- ``(I) $10,000,000 for Phase I--preconstruction planning studies; ``(II) $20,000,000 for Phase II--environmental analyses; and ``(III) $60,000,000 for Phase III--deployment projects. ``(ii) Obligation authority.--Funds authorized by this subparagraph shall be available for obligation in the same manner as if the funds were apportioned under chapter I, except that-- ``(I) the Federal share of the cost of the project shall be in accordance with paragraph (2); and ``(II) the availability of the funds shall be in accordance with subsection (f). ``(B) Noncontract authority authorization of appropriations.-- ``(i) Phase i.--There are authorized to be appropriated from the Highway Trust Fund (other than the Mass Transit Account) to carry out Phase I--preconstruction planning studies under subsection (b)-- ``(I) $12,000,000 for fiscal year 2005; ``(II) $6,000,000 for fiscal year 2006; and ``(III) $2,000,000 for each of fiscal years 2007 through 2009. ``(ii) Phase ii.--There are authorized to be appropriated from the Highway Trust Fund (other than the Mass Transit Account) to carry out Phase II--environmental analyses under subsection (c)-- ``(I) $41,500,000 for fiscal year 2005; ``(II) $25,000,000 for fiscal year 2006; ``(III) $37,000,000 for fiscal year 2007; ``(IV) $21,000,000 for fiscal year 2008; and ``(V) $9,000,000 for fiscal year 2009. ``(iii) Phase iii.--There are authorized to be appropriated from the Highway Trust Fund (other than the Mass Transit Account) to carry out Phase III--deployment projects under subsection (d)-- ``(I) $26,500,000 for fiscal year 2005; ``(II) $500,000,000 for fiscal year 2006; ``(III) $650,000,000 for fiscal year 2007; ``(IV) $850,000,000 for fiscal year 2008; and ``(V) $850,000,000 for fiscal year 2009. ``(iv) Program administration.--There are authorized to be appropriated from the Highway Trust Fund (other than the Mass Transit Account) to carry out administration of this program-- ``(I) $2,500,000 for fiscal year 2005; ``(II) $13,000,000 for fiscal year 2006; ``(III) $16,000,000 for fiscal year 2007; ``(IV) $8,000,000 for fiscal year 2008; and ``(V) $5,000,000 for fiscal year 2009. ``(v) Research and development.--There is authorized to be appropriated from the Highway Trust Fund (other than the Mass Transit Account) to carry out research and development activities to reduce MAGLEV deployment costs $4,000,000 for each of fiscal years 2005 through 2009. ``(f) Availability of Funds.--Funds made available under subsection (e) shall remain available until expended. ``(g) Other Federal Funds.--Funds made available to a State to carry out the surface transportation program under section 133 and the congestion mitigation and air quality improvement programs under section 149 may be used by any State to pay a portion of the full project costs of an eligible project selected under this section, without requirement for non- Federal funds. ``(h) Other Federal Funds.--A project selected for funding under this section shall be eligible for other forms of financial assistance provided by this title and title V of the Railroad Revitalization and Regulatory Reform Act of 1976 (45 U.S.C. 821 et seq.), including loans, loan guarantees, and lines of credit. ``(i) Mandatory Additional Selection.-- ``(1) In general.--Subject to paragraph 2, in selecting projects for preconstruction planning, deployment, and financial assistance, the Administrator may only provide funds to MAGLEV projects that meet the criteria established under subsection (b)(4). ``(2) Priority funding.--The Administrator shall give priority funding to a MAGLEV project that-- ``(A) has already met the criteria in section 1218 of the Transportation Equity Act for the 21st Century (112 Stat. 216) and has received funding prior to the date of enactment of this section as a result of evaluation and contracting procedures for MAGLEV transportation, to the extent that the project continues to fulfill the requirements of this section; ``(B) to the maximum extent practicable, has met safety guidelines established by the Administrator to protect the health and safety of the public; ``(C) is based on designs that ensure the greatest life cycle advantages for the project; ``(D) contains domestic content of at least 70 percent; and ``(E) is designed and developed through public/private partnership entities and continues to meet the criteria set forth in section 1218 of the Transportation Equity Act for the 21st Century (112 Stat. 216) regarding public/private partnerships.''. (b) Conforming Amendment.--The analysis for chapter 3 of title 23, United States Code, is amended by striking the item relating to section 322 and inserting the following: ``322. High-speed magnetic levitation system deployment program.''. ______