Senate amendment proposed (on the floor): Amendment SA 3292 proposed by Senator Murkowski for Senator Shaheen to Amendment SA 2953.(consideration: CR S2145-2191)
April 19, 2016
View full timeline
Senate amendment proposed (on the floor): Amendment SA 3292 proposed by Senator Murkowski for Senator Shaheen to Amendment SA 2953.(consideration: CR S2145-2191)
April 19, 2016
Senate amendment agreed to: Amendment SA 3292 as modified agreed to in Senate by Voice Vote.(text as modified: CR S2148)
April 19, 2016
Amendment SA 3292 proposed by Senator Murkowski for Senator Shaheen to Amendment SA 2953. (consideration: CR S2145-2191) To reduce barriers to combined heat and power systems and waste heat to power systems.
April 19, 2016
Amendment SA 3292 as modified agreed to in Senate by Voice Vote. (text as modified: CR S2148)
April 19, 2016
Senate amendment submitted
February 8, 2016
Senate amendment submitted
February 8, 2016
Text
Submitted
SA 3292. Mr. REID (for Mrs. Shaheen) submitted an amendment intended to be proposed to amendment SA 2953 proposed by Ms. Murkowski to the bill S. 2012, to provide for the modernization of the energy policy of the United States, and for other purposes; which was ordered to lie on the table; as follows: At the end of title II, add the following: Subtitle F--Heat Efficiency Through Applied Technology SEC. 2501. SHORT TITLE. This subtitle may be cited as the ``Heat Efficiency through Applied Technology Act'' or the ``HEAT Act''. SEC. 2502. FINDINGS. Congress finds that-- (1) combined heat and power technology, also known as cogeneration, is a technology that efficiently produces electricity and thermal energy at the point of use of the technology; (2) by combining the provision of both electricity and thermal energy in a single step, combined heat and power technology makes significantly more-efficient use of fuel, as compared to separate generation of heat and power, which has significant economic and environmental advantages; (3) waste heat to power is a technology that captures heat discarded by an existing industrial process and uses that heat to generate power with no additional fuel and no incremental emissions, reducing the need for electricity from other sources and the grid, and any associated emissions; (4) waste heat or waste heat to power is considered renewable energy in 17 States; (5)(A) a 2012 joint report by the Department of Energy and the Environmental Protection Agency estimated that by achieving the national goal outlined in Executive Order 13624 (77 Fed. Reg. 54779) (September 5, 2012) of deploying 40 gigawatts of new combined heat and power technology by 2020, the United States would increase the total combined heat and power capacity of the United States by 50 percent in less than a decade; and (B) additional efficiency would-- (i) save 1,000,000,000,000,000 BTUs of energy; and (ii) reduce emissions by 150,000,000 metric tons of carbon dioxide annually, a quantity equivalent to the emissions from more than 25,000,000 cars; (6) a 2012 report by the Environmental Protection Agency estimated the amount of waste heat available at a temperature high enough for power generation from industrial and nonindustrial applications represents an additional 10 gigawatts of electric generating capacity on a national basis; (7) distributed energy generation, including through combined heat and power technology and waste heat to power technology, has ancillary benefits, such as-- (A) removing load from the electricity distribution grid; and (B) improving the overall reliability of the electricity distribution system; and (8)(A) a number of regulatory barriers impede broad deployment of combined heat and power technology and waste heat to power technology; and (B) a 2008 study by Oak Ridge National Laboratory identified interconnection issues, regulated fees and tariffs, and environmental permitting as areas that could be streamlined with respect to the provision of combined heat and power technology and waste heat to power technology. SEC. 2503. UPDATING OUTPUT-BASED EMISSIONS STANDARDS. (a) Definitions.--In this section: (1) Administrator.--The term ``Administrator'' means the Administrator of the Environmental Protection Agency. (2) Combined heat and power technology.--The term ``combined heat and power technology'' means the generation of electric energy and heat in a single, integrated system that meets the efficiency criteria in clauses (ii) and (iii) of section 48(c)(3)(A) of the Internal Revenue Code of 1986, under which heat that is conventionally rejected is recovered and used to meet thermal energy requirements. (3) Output-based emission standard.--The term ``output- based emission standard'' means a standard that relates emissions to the electrical, thermal, or mechanical productive output of a device or process rather than the heat input of fuel burned or pollutant concentration in the exhaust. (4) Qualified waste heat resource.-- (A) In general.--The term ``qualified waste heat resource'' means-- (i) exhaust heat or flared gas from any industrial process; (ii) waste gas or industrial tail gas that would otherwise be flared, incinerated, or vented; (iii) a pressure drop in any gas for an industrial or commercial process; or (iv) any other form of waste heat resource as the Secretary may determine. (B) Exclusion.--The term ``qualified waste heat resource'' does not include a heat resource from a process the primary purpose of which is the generation of electricity using a fossil fuel. (5) State.--The term ``State'' has the meaning given that term in section 302 of the Clean Air Act (42 U.S.C. 7602). (6) Waste heat to power technology.--The term ``waste heat to power technology'' means a system that generates electricity through the recovery of a qualified waste heat resource. (b) Establishment of Program.--The Administrator shall establish a program under which the Administrator shall provide to each State that elects to participate and that submits an application under subsection (c) a grant for use by the State in accordance with subsection (d). (c) Application.--To be eligible to receive a grant under this section, a State shall submit to the Administrator an application at such time, in such manner, and containing such information as the Administrator may require. (d) Use of Funds.-- (1) In general.--A State shall use a grant provided under this section-- (A) to update any applicable State or local air permitting regulations under this subtitle to incorporate environmental regulations relating to output-based emissions in accordance with relevant guidelines developed by the Administrator under paragraph (2); or (B) if the State has already updated all applicable State and local permitting regulations to incorporate those output- based emissions environmental regulations, to expedite the processing of relevant power generation permit applications under this subtitle. (2) Guidelines.--As soon as practicable after the date of enactment of this Act, the Administrator shall publish guidelines for updating State and local permitting regulations under this subtitle that-- (A) provide credit, in the calculation of the emission rate of the facility, for any thermal energy produced by combined heat and power technology or waste heat to power technology; and (B) apply only to generation units that produce 5 megawatts of electrical energy or less. [[Page S707]] (e) Maximum Amount.--The amount of a grant provided under this section shall not exceed $100,000. (f) Authorization of Appropriations.--There is authorized to be appropriated to the Administrator to carry out this section $5,000,000. SEC. 2504. UPDATED INTERCONNECTION PROCEDURES AND TARIFF SCHEDULE; SUPPLEMENTAL, BACKUP, AND STANDBY POWER FEES OR RATES. Section 205(a) of the Federal Power Act (16 U.S.C. 824d(a)) is amended-- (1) by striking ``(a) All rates'' and inserting the following: ``(a) Rates and Charges.-- ``(1) In general.--All rates''; and (2) by adding at the end the following: ``(2) Establishment of certain guidance and standards.-- ``(A) Definitions.--In this paragraph: ``(i) Nonregulated electric utility.--The term `nonregulated electric utility' means any electric utility other than a State-regulated electric utility. ``(ii) State regulatory authority.--The term `State regulatory authority' means-- ``(I) any State agency that has ratemaking authority with respect to the sale of electric energy by any electric utility (other than the State agency); and ``(II) in the case of an electric utility with respect to which the Tennessee Valley Authority has ratemaking authority, the Tennessee Valley Authority. ``(iii) Secretary.--The term `Secretary' means the Secretary of Energy. ``(iv) Other terms.--The terms `combined heat and power technology' and `waste heat to power technology' have the meanings given those terms in section 2503(a) of the Heat Efficiency through Applied Technology Act. ``(B) Guidance and standards.-- ``(i) Establishment.--Not later than 1 year after the date of enactment of this paragraph, the Secretary, in consultation with the Commission and other appropriate agencies, shall establish-- ``(I) for generation with nameplate capacity up to 20 megawatts using all fuels-- ``(aa) guidance for technical interconnection standards that ensure interoperability with existing Federal interconnection rules; ``(bb) model interconnection procedures, including appropriate fast-track procedures; and ``(cc) model rules for determining and assigning interconnection costs; and ``(II) model rules and procedures for determining fees or rates for supplementary power, backup or standby power, maintenance power, and interruptible power supplied to facilities that operate combined heat and power technology and waste heat to power technology that appropriately allow for adequate cost recovery by an electric utility but are not excessive. ``(ii) Requirement.--The standards established under clause (i)(I) shall reflect, to the maximum extent practicable, current best practices (as demonstrated in model codes and rules adopted by States) to encourage the use of distributed generation (such as combined heat and power technology and waste heat to power technology) while ensuring the safety and reliability of the interconnected units and the distribution and transmission networks to which the units connect. ``(iii) Factors for consideration.--In establishing model standards, rules, and procedures under clause (i), the Secretary shall take into consideration-- ``(I) for the model standards established under clause (i)(I), the appropriateness of using standards or procedures that vary based on unit size, fuel type, or other relevant characteristics; and ``(II) for the model rules and procedures established under clause (i)(II)-- ``(aa) the best practices that are used to model outage assumptions and contingencies to determine the fees or rates; ``(bb) the appropriate duration, magnitude, or usage of demand charge ratchets; ``(cc) the benefits to the utility and ratepayers, such as increased reliability, fuel diversification, enhanced power quality, and reduced electric losses from the use of combined heat and power technology and waste heat to power technology by a qualifying facility; and ``(dd) alternative arrangements to the purchase of supplementary, backup, or standby power by the owner of combined heat and power technology and waste heat to power technology generating units if the alternative arrangements do not compromise system reliability and are nondiscretionary and nonpreferential. ``(C) Determination by states and utilities.-- ``(i) In general.--Not later than 90 days after the date on which the Secretary completes the standards required under subparagraph (B), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall-- ``(I)(aa) take into consideration each standard established by subparagraph (B); and ``(bb) make a determination concerning whether it is appropriate to implement that standard; or ``(II) set a hearing date for consideration under subclause (I). ``(ii) Procedural requirements.-- ``(I) Consideration.--The consideration under clause (i) shall be made after public notice and hearing. ``(II) Determination.--A determination under clause (i)(I)(bb) shall be made-- ``(aa) in writing; ``(bb) based on findings included in the determination and evidence presented at an applicable hearing; and ``(cc) available to the public. ``(iii) Deadline for compliance.--Not later than 2 years after the date on which the Secretary completes the standards required under subparagraph (B), each State regulatory authority (with respect to each electric utility for which the authority has ratemaking authority) and each nonregulated electric utility shall-- ``(I) complete the consideration under clause (i); ``(II) make the determination referred to in clause (i)(I)(bb) with respect to each standard established under subparagraph (B); and ``(III) submit to the Secretary and the Commission a report describing the updated plans of the State regulatory authority regarding, as applicable-- ``(aa) interconnection procedures and tariff schedules that reflect best practices to encourage the use of distributed generation; or ``(bb) supplemental, backup, and standby power fees that reflect best practices to encourage the use of distributed generation. ``(iv) Effect of paragraph.--Nothing in this paragraph prohibits any State regulatory authority or nonregulated electric utility from making a determination pursuant to this subparagraph that it is not appropriate to implement a standard or any other applicable State law. ``(D) Implementation.-- ``(i) In general.--The State regulatory authority (with respect to each electric utility for which the authority has ratemaking authority) or nonregulated electric utility, to the extent consistent with otherwise applicable State law, may-- ``(I) implement any standard determined under subparagraph (C) to be appropriate; or ``(II) decline to implement any such standard. ``(ii) Decision not to implement.--If a State regulatory authority (with respect to each electric utility for which the authority has ratemaking authority) or nonregulated electric utility declines to implement a standard pursuant to clause (i)(II), the authority or nonregulated electric utility shall publish a notice describing the reasons for that decision. ``(iii) Prior state actions.--Clause (ii) and subparagraph (C)(ii) shall not apply to a standard established under subparagraph (B) in the case of any electric utility in a State if, before the date of enactment of this paragraph-- ``(I) the State has implemented for the electric utility the standard (or a comparable standard); ``(II) the State regulatory authority for the State, or the relevant nonregulated electric utility, has conducted a proceeding after December 31, 2013, to consider implementation of the standard (or a comparable standard) for the electric utility; or ``(III) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility.''. ______