H.R. 1005House111th Congress (2009-2011)In Committee

National Public Notification of Environmental Hazards Act of 2009

Introduced February 11, 2009

Legislative Activity

Stay on top of the latest movement without scrolling through every action

5 earlier actions
HouseCommittee Latest Action

Referred to the Subcommittee on Energy and Environment.

February 12, 2009

View full timeline
HouseIntro Referral

Introduced in House

February 11, 2009

HouseIntro Referral

Referred to House Energy and Commerce

February 11, 2009

HouseIntro Referral

Referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

February 11, 2009

HouseIntro Referral

Referred to House Transportation and Infrastructure

February 11, 2009

HouseCommittee

Referred to the Subcommittee on Water Resources and Environment.

February 12, 2009

HouseCommittee

Referred to the Subcommittee on Energy and Environment.

February 12, 2009

Floor Debate

19 members

What members said about H.R. 1005 on the floor

11 Republicans8 Democrats
James P. McGovern
Rep. James P. McGovernD-MA-3 · Feb 25, 2009

Mr. Speaker, by direction of the Committee on Rules, I call up House Resolution 184 and ask for its immediate consideration. Mr. Speaker, I yield myself such time as I may consume. Once again, Mr.…

Pete Sessions
Rep. Pete SessionsR-TX-32 · Feb 25, 2009

Mr. Speaker, I stand in strong opposition to this closed rule. And Mr. Speaker, let me say this, that the gentleman from Massachusetts (Mr. McGovern), my colleague and friend, has had a chance to sit…

Jeff Flake
Rep. Jeff FlakeR-AZ-6 · Feb 25, 2009

Mr. Speaker, I raise a point of order against H. Res. 184 because the resolution violates section 426(a) of the Congressional Budget Act. The resolution contains a waiver of all points of order…

Doc Hastings
Rep. Doc HastingsR-WA-4 · Feb 25, 2009

Mr. Speaker, I oppose this totally closed rule. As the ranking Republican on the House Natural Resources Committee, I especially object to a very dangerous policy rider that could seriously threaten…

Norman D. Dicks
Rep. Norman D. DicksD-WA-6 · Feb 25, 2009

Mr. Speaker, I rise in strong support of the Omnibus Appropriations Act and the rule currently being debated in the House. Division E of this bill provides $27.6 billion for programs under the…

Show 8 more
Christopher H. Smith
Rep. Christopher H. SmithR-NJ-4 · Feb 25, 2009

Mr. Speaker, yesterday I submitted two pro- life, pro-child, pro-women amendments to the Rules Committee and asked that they be made in order. Regrettably, both were rejected. As a direct, absolutely…

David R. Obey
Rep. David R. ObeyD-WI-7 · Feb 25, 2009

Mr. Speaker, I detest the word ``blame,'' and I don't want to use it in these circumstances. I don't want to say that we're here today because I blame President Bush for our differences on these…

Jack Kingston
Rep. Jack KingstonR-GA-1 · Feb 24, 2009

Madam Speaker, pursuant to the House Republican standards on earmarks, I am submitting the following information for publication in the Congressional Record regarding H.R. 1105, the FY 2009 Omnibus…

Jeb Hensarling
Rep. Jeb HensarlingR-TX-5 · Feb 25, 2009

I thank the gentleman for yielding. Mr. Speaker, as our countrymen are hurting, as our unemployment news grows grim, what is the answer of the Democrat majority? They have brought us the largest…

Mark Kirk
Rep. Mark KirkR-IL-10 · Feb 25, 2009

Mr. Chairman, as a Republican moderate, I rise in support of the rule, but against the bill that it governs. This rule would deny a pay raise to the Congress, and since Americans are not getting a…

Earl Blumenauer
Rep. Earl BlumenauerD-OR-3 · Feb 25, 2009

I appreciate the gentleman's courtesy. Listening to my friend from Indiana talking about funny money and fiscal responsibility, well, you know, we didn't hear that from you when those on the other…

Jared Polis
Rep. Jared PolisD-CO-2 · Feb 25, 2009

Mr. Speaker, I rise in support of the 2009 Omnibus Appropriations Act. I thank Chairman Obey and his staff for their hard work and leadership on this legislation. This bill funds essential education,…

Charles W. Dent
Rep. Charles W. DentR-PA-15 · Feb 25, 2009

Mr. Speaker, I just rise today to express my disappointment with the fact that we are operating under a closed rule. I appreciate the fact that we are going to eliminate the pay raise, I think that's…

Show 6 more
Dan Burton
Rep. Dan BurtonR-IN-5 · Feb 25, 2009

I thank the gentleman for yielding. Mr. Speaker, last night here in the well, the President said that there were no pork barrel projects in this bill, and now we find out there are over 9,000 pork…

Maxine Waters
Rep. Maxine WatersD-CA-35 · Feb 25, 2009

I would like to thank the chairman and subcommittee chairman on the Appropriations Committee for doing such a great job crafting this legislation. Last night, President Obama said that a budget…

Paul C. Broun
Rep. Paul C. BrounR-GA-10 · Feb 25, 2009

I thank the gentleman for yielding. This rule is totally unfair, and it is a slap in the face to the American family. We are struggling all across America to try to make ends meet, but what are we…

Lincoln Diaz-Balart
Rep. Lincoln Diaz-BalartR-FL-21 · Feb 25, 2009

Mr. Speaker, I rise to engage Chairwoman Lowey of the State, Foreign Operations, and Related Programs Appropriations Subcommittee in a colloquy. Madam Chairwoman, President Bush's fiscal year 2009…

Nita M. Lowey
Rep. Nita M. LoweyD-NY-18 · Feb 25, 2009

I want to thank Mr. Diaz-Balart, Ms. Wasserman Schultz and Mr. Sires for their leadership and interest in promoting democratic governance in Cuba. While the omnibus does not list funding levels for…

Allyson Y. Schwartz
Rep. Allyson Y. SchwartzD-PA-13 · Feb 25, 2009

Mr. Speaker, on rollcall No. 83, had I been present, I would have voted ``yea.''

Bill Text

Latest available legislative text

Reading Mode
Latest
Introduced in HouseIssued February 11, 2009

I

111th CONGRESS

1st Session

H. R. 1005

IN THE HOUSE OF REPRESENTATIVES

February 11, 2009

Mr. Smith of New Jersey introduced the following bill; which was referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned

A BILL

To amend the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 to improve public notification and community relations concerning actions for the removal of environmental hazards.

1.

Short title

This Act may be cited as the National Public Notification of Environmental Hazards Act of 2009.

2.

Requirement for public notice of removal of environmental hazards

Title I of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601 et seq.) is amended by adding at the end the following:

129.

Requirement for public notice of removal of environmental hazards

(a)

Revision of national contingency plan

Not later than 12 months after the date of enactment of this section, the President shall revise the national contingency plan in accordance with the requirements of this section to provide for improved public notification and community relations in the case of a response action.

(b)

Requirements for all response actions

(1)

Applicability

The head of the lead agency for a response action shall take the actions specified in this subsection for each response action conducted by the lead agency.

(2)

Designation of spokesperson; press releases

(A)

In general

The head of the lead agency shall designate a spokesperson for the response action.

(B)

Duties

The spokesperson shall—

(i)

provide notice of the response action to—

(I)

civil defense and emergency management agencies, as the head of the lead agency determines appropriate;

(II)

immediately affected residents;

(III)

other members of the community surrounding the response site; and

(IV)

State and local officials;

(ii)

respond to inquiries from the public concerning the response action; and

(iii)

provide information to the public concerning the release resulting in the response action.

(C)

Press Release

The head of the lead agency shall—

(i)

issue a press release containing information about the response action not later than 10 days after the President determines that the response action is appropriate; and

(ii)

ensure the coordination of all press releases and other statements made by agencies participating in the response action with the on-scene coordinator or remedial project manager appointed for the response action under the national contingency plan.

(3)

Establishment of public information office

(A)

In general

The head of the lead agency shall establish a public information office for the response action.

(B)

Location

The public information office shall be located at or near the response site and may be housed in a trailer or other facility.

(C)

Staffing

The public information office shall be staffed by individuals selected by the head of the agency.

(D)

Duties

Individuals staffing the public information office shall—

(i)

provide information to the public on the actions taken with regard to the response action;

(ii)

respond to inquiries from the public concerning the response action; and

(iii)

provide information to the public concerning the release resulting in the response action.

(E)

Deadline

The head of the lead agency shall establish the public information office not later than the date of initiation of on-site activities for the response action. The public information office shall remain available to the public for the duration of the response action.

(4)

Information repository

(A)

In general

The head of the lead agency shall establish, at or near the response site, at least one local information repository that contains items made available for public information.

(B)

Public notice

The head of the lead agency shall inform the public of the establishment of the information repository.

(C)

Public access

The head of the lead agency shall ensure that all items in the information repository are available for public inspection and copying.

(D)

Deadline

The head of the lead agency shall complete all actions required by this paragraph on or before the last day of the 60-day period beginning on the date of initiation of on-site activities for the response action.

(5)

Administrative record file

(A)

In general

The head of the lead agency shall make available for public inspection the administrative record file for the response action.

(B)

Public notice

The head of the lead agency shall publish a prominent notice of availability of the administrative record file for public inspection and comment in a newspaper of general circulation in the area including the response site. The notice shall also include the following:

(i)

Information about the response site, including the location of the site and the hazardous substance present at the site.

(ii)

The location of the information repository established under paragraph (4) and the hours that the repository is open to the public.

(iii)

The time, date, and location of the next scheduled public meeting to be conducted under paragraph (7).

(iv)

The dates of the public comment period established under paragraph (6).

(v)

The name of the agency contact to whom individuals may submit written comments concerning the response action.

(C)

Location

The head of the lead agency shall place the administrative record file in at least one of the information repositories established under paragraph (4).

(D)

Deadline

The head of the lead agency shall publish the notice required by subparagraph (A) on or before the last day of the 60-day period beginning on the date of initiation of on-site activities for the response action.

(6)

Public comment period

(A)

In general

The head of the lead agency shall provide a public comment period that allows for the submission of written and oral comments concerning the response action.

(B)

Response to comments

The head of the lead agency shall prepare a written response to significant comments submitted during the comment period.

(C)

Length of period

The public comment period shall begin on the date the administrative record file is made available for public inspection and continue for at least 30 days. Upon timely request, the head of the lead agency shall extend the public comment period by a minimum of 15 days.

(7)

Public meetings

(A)

In general

The head of the lead agency for a response action shall conduct public meetings concerning the response action.

(B)

Location

The meetings shall be held in a location in close proximity to the response site.

(C)

Public notice

The head of the lead agency shall publish a prominent notice that informs the public about the public meeting. The notice shall include the following:

(i)

Information about the response site, including the location of the site and the hazardous substance present at the site.

(ii)

The time, date, location, and purpose of the public meeting.

(D)

Deadline

The head of the lead agency shall—

(i)

conduct an initial meeting under subparagraph (A) not later than 30 days after the President determines that the response action is appropriate; and

(ii)

conduct additional meetings under subparagraph (A) quarterly throughout the duration of the response action.

(8)

Establishment of toll-free telephone number

(A)

In general

The head of the lead agency for a response action shall establish a toll-free telephone number to provide information to the public about the response action.

(B)

Automation

If the provision of information through the telephone number is automated, the information shall include a telephone number for contacting a representative of the lead agency who can answer further questions about the response action.

(C)

Deadlines

The head of the lead agency shall—

(i)

establish such telephone number not later than 30 days after the date on which the President determines that the response action is appropriate; and

(ii)

update information provided through such telephone number at least weekly.

(9)

Establishment of Web site

(A)

In general

The head of the lead agency shall establish a public Internet Web site (or comparable facility using a successor protocol or technology) to provide information to the public about the response action.

(B)

Updates

The head of the lead agency shall update the information on the Web site (or comparable facility) frequently.

(C)

Link from EPA Web site

The head of the lead agency shall ensure that a link to the Web site (or comparable facility) is provided on the public Internet Web site (or comparable facility) of the Environmental Protection Agency.

(D)

Deadline

The head of the lead agency shall make the Web site (or comparable facility) required by subparagraph (A) available to the public not later than 30 days after the date on which the President determines that the response action is appropriate.

(10)

Visits to residences and businesses

(A)

In general

The head of the lead agency shall ensure that each residence and business located within a ½ mile radius of the response site is visited by a representative of the lead agency.

(B)

Duties

A representative conducting a visit under subparagraph (A) shall—

(i)

provide the residence or business with information, including printed materials, on actions taken at the response site;

(ii)

respond to inquiries from the residence or business concerning the response action; and

(iii)

provide information to the residence or business concerning the release resulting in the response action.

(C)

Deadlines

The head of the lead agency shall ensure that—

(i)

the visits required by subparagraph (A) occur not later than 30 days after the President determines that the response action is appropriate; and

(ii)

such visits reoccur quarterly throughout the duration of the response action.

(11)

Printed information

(A)

In general

The head of the lead agency for a response action shall mail printed materials containing information about the removal action to all residences and businesses located within a ½ mile radius of the response site.

(B)

Deadlines

The head of the lead agency shall—

(i)

mail the materials required by subparagraph (A) not later than 30 days after the President determines that response action is appropriate; and

(ii)

update and mail the materials quarterly throughout the duration of the response action.

(c)

Requirement for response actions with planning periods of at least 180 days

(1)

Applicability

The head of the lead agency for a response action shall take the actions specified in this subsection, in addition to the actions specified in subsection (b), if the President determines, based on a site evaluation, that a response action is appropriate and the head of the lead agency determines that a planning period of at least 180 days exists prior to the date of initiation of on-site activities for the response action. If subsection (d) applies to the response action, the head of the lead agency shall also take the actions specified in that subsection.

(2)

Engineering Evaluation and Cost Analysis

(A)

In general

The head of the lead agency shall make the engineering evaluation and cost analysis prepared for the response action available to the public.

(B)

Notice

The head of the lead agency shall publish a prominent notice of availability of the engineering evaluation and cost analysis in a local newspaper of general circulation in the community where the response site is located. Such notice shall contain a brief description of the contents of the engineering evaluation and cost analysis and a description of the location where the evaluation and analysis is located.

(C)

Deadline

The head of the lead agency shall complete the actions required under subparagraphs (A) and (B) not later than the date on which an engineering evaluation and cost analysis approval memorandum for the response action is signed.

(d)

Requirements for response actions lasting more than 120 days

(1)

Applicability

The head of the lead agency for a response action shall take the actions specified in this subsection, in addition to the actions specified in subsection (b), for a response action that the head of the lead agency determines will continue after the end of the 120-day period beginning on the date of initiation of on-site activities for the response action. If subsection (c) applies to the response action, the head of the lead agency shall also take the actions specified in that subsection.

(2)

Interviews

(A)

In general

The head of the lead agency shall conduct interviews with local officials, community residents, public interest groups, and other interested or affected persons, as appropriate, to solicit their concerns, information needs, and how and when such persons would like to be involved in the response action.

(B)

Deadline

The head of the lead agency shall complete the interviews required by subparagraph (A) on or before the last day of the 90-day period beginning on the date of initiation of on-site activities for the response action.

(3)

Community relations plan

(A)

In general

The head of the lead agency shall prepare a formal community relations plan based on the interviews conducted under paragraph (2) and other relevant information.

(B)

Contents

The community relations plan shall specify the community relations activities that the head of the lead agency expects to undertake during the response action.

(C)

Deadline

The head of the lead agency shall develop the community relations plan on or before last day of the 120-day period beginning on the date of initiation of on-site activities for the response action.

(e)

Definitions

In this section, the following definitions apply:

(1)

Engineering evaluation and cost analysis

The term engineering evaluation and cost analysis means an engineering evaluation and cost analysis required by section 300.415(a)(4)(i) of title 40, Code of Federal Regulations, as in effect on October 1, 2007.

(2)

Lead agency

The term lead agency means the agency responsible for planning and implementing a response action under the national contingency plan.

(3)

Significant comment

The term significant comment means a public comment determined to be significant by the head of the lead agency responsible for the response action.

(4)

Response action

The term response action means a response carried out under the national contingency plan, including a response as defined by section 101 of this Act and a removal as defined by section 311(a) of the Federal Water Pollution Control Act (33 U.S.C. 1321(a)).

(5)

Response site

The term response site means the location of a response.

.