H.R. 1654House115th Congress (2017-2019)Passed House

Water Supply Permitting Coordination Act

Introduced March 21, 2017

AI-Generated Summary

Updated April 15, 2026 at 2:07 PM UTC

The Water Supply Permitting Coordination Act lets the Secretary of the Interior streamline how federal and state permits are handled for new surface‑water storage projects on lands managed by the Interior or Agriculture departments. It makes the Bureau of Reclamation the lead agency that coordinates all required reviews, permits, and approvals. The bill also sets up a process for states and other agencies to cooperate and establishes timelines and data‑sharing rules to speed project development.

Key Provisions

  • Designates the Bureau of Reclamation as the lead agency to coordinate all federal permitting for qualifying water‑storage projects.
  • Requires the Bureau to identify and notify any federal or state agencies that have jurisdiction over a project and allows states to join as cooperating agencies.
  • Mandates the Bureau to serve as a single point of contact, create a unified environmental review document, set project schedules, appoint a project manager, and maintain a consolidated electronic record of project data.
  • Sets specific deadlines for environmental reviews: up to one year for an environmental assessment with a finding of no significant impact, and up to one year and 30 days after public comment for a draft environmental impact statement.
  • Obligates cooperating agencies to submit their review timelines, adhere to the Bureau’s schedule, and provide environmental and project data in an accessible electronic format.
  • Allows non‑federal public entities to contribute funds to speed up permit evaluations, while requiring that such funding not affect impartial decision‑making and that final decisions remain publicly available.

Legislative Activity

Stay on top of the latest movement without scrolling through every action

23 earlier actions
SenateIntro Referral Latest Action

Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

June 26, 2017

View full timeline
HouseIntro Referral

Introduced in House

March 21, 2017

HouseIntro Referral

Referred to the House Committee on Natural Resources.

March 21, 2017

HouseCommittee

Referred to the Subcommittee on Water, Power and Oceans.

March 27, 2017

HouseCommittee

Subcommittee on Water, Power and Oceans Discharged.

April 27, 2017

HouseCommittee

Committee Consideration and Mark-up Session Held.

April 27, 2017

HouseCommittee

Ordered to be Reported (Amended) by the Yeas and Nays: 24 - 16.

April 27, 2017

HouseCommittee

Reported (Amended) by the Committee on Natural Resources. H. Rept. 115-166.

June 12, 2017

HouseCalendars

Placed on the Union Calendar, Calendar No. 111.

June 12, 2017

HouseFloor

Rules Committee Resolution H. Res. 392 Reported to House. Rule provides for consideration of H.R. 1873 and 1654, with 1 hour of general debate for each bill. Previous question shall be considered as ordered without intervening motions except a motion to recommit with or without instructions on each bill. Both measures will be considered read and have specified amendments.

June 20, 2017 • 6:37 PM

HouseFloor

Rule H. Res. 392 passed House.

June 21, 2017 • 2:43 PM

HouseFloor

Considered under the provisions of rule H. Res. 392. (consideration: CR H5082-5095)

June 22, 2017 • 2:40 PM

HouseFloor

Rule provides for consideration of H.R. 1873 and 1654, with 1 hour of general debate for each bill. Previous question shall be considered as ordered without intervening motions except a motion to recommit with or without instructions on each bill. Both measures will be considered read and have specified amendments.

June 22, 2017 • 2:40 PM

HouseFloor

The Speaker designated the Honorable Ted Poe to act as Chairman of the Committee.

June 22, 2017 • 2:40 PM

HouseFloor

House resolved itself into the Committee of the Whole House on the state of the Union pursuant to H. Res. 392 and Rule XVIII.

June 22, 2017 • 2:40 PM

HouseFloor

GENERAL DEBATE - The Committee of the Whole proceeded with one hour of general debate on H.R. 1654.

June 22, 2017 • 2:41 PM

HouseFloor

DEBATE - Pursuant to the provisions of H.Res. 392, the Committee of the Whole proceeded with 10 minutes of debate on the LaMalfa amendment No. 1.

June 22, 2017 • 3:26 PM

HouseFloor

DEBATE - Pursuant to the provisions of H. Res. 392, the Committee of the Whole proceeded with 10 minutes of debate on the Lowenthal amendment No. 2.

June 22, 2017 • 3:36 PM

HouseFloor

The House rose from the Committee of the Whole House on the state of the Union to report H.R. 1654.

June 22, 2017 • 4:13 PM

HouseFloor

The previous question was ordered pursuant to the rule.

June 22, 2017 • 4:14 PM

HouseFloor

The House adopted the amendment in the nature of a substitute as agreed to by the Committee of the Whole House on the state of the Union. (text of amendment in the nature of a substitute: CR H5087-5088)

June 22, 2017 • 4:24 PM

HouseFloor

Passed/agreed to in House: On passage Passed by recorded vote: 233 - 180 (Roll no. 319).

June 22, 2017 • 4:33 PM

HouseFloor

On passage Passed by recorded vote: 233 - 180 (Roll no. 319).

June 22, 2017 • 4:33 PM

HouseFloor

Motion to reconsider laid on the table Agreed to without objection.

June 22, 2017 • 4:33 PM

SenateIntro Referral

Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

June 26, 2017

Amendments

2 amendments

Offered to this bill

Floor Debate

22 members

What members said about H.R. 1654 on the floor

12 Republicans10 Democrats
Jared Polis
Rep. Jared PolisD-CO-2 · Jun 21, 2017

Mr. Speaker, I yield myself such time as I may consume, and I thank the gentleman for yielding me the customary 30 minutes. First, I want to rise in agreement with my friend from Washington's…

Jared Huffman
Rep. Jared HuffmanD-CA-2 · Jun 22, 2017

Mr. Chairman, I yield myself such time as I may consume. Mr. Chairman, we are debating today what is being called an infrastructure bill. I wish that were actually the case. Our country certainly…

Dan Newhouse
Rep. Dan NewhouseR-WA-4 · Jun 21, 2017

Mr. Speaker, by direction of the Committee on Rules, I call up House Resolution 392 and ask for its immediate consideration. Mr. Speaker, for the purpose of debate only, I yield the customary 30…

Tom McClintock
Rep. Tom McClintockR-CA-4 · Jun 22, 2017

Mr. Chair, I thank the gentleman for yielding and for his leadership on the Water, Power, and Oceans Subcommittee. Mr. Chairman, droughts are nature's fault; they happen. But water shortages are our…

Alan S. Lowenthal
Rep. Alan S. LowenthalD-CA-47 · Jun 22, 2017

Mr. Chair, I have an amendment at the desk. Mr. Chairman, I, like many of my colleagues on both sides of the aisle, am concerned about the long-term prospects for water infrastructure and storage in…

Show 8 more
Liz Cheney
Rep. Liz CheneyR-WY · Jun 21, 2017

Mr. Speaker, I would like to thank very much my colleague from Washington particularly for calling me ``young.'' I appreciate that always. Mr. Speaker, I have enjoyed listening to the colloquy taking…

Kevin McCarthy
Rep. Kevin McCarthyR-CA-23 · Jun 15, 2017

Mr. Speaker, I thank the gentleman for yielding, and I thank him for his comments. Yesterday was a long and emotional day for the people in this House. A cowardly act of violence was directed at our…

Doug LaMalfa
Rep. Doug LaMalfaR-CA-1 · Jun 22, 2017

Mr. Chair, I have an amendment made in order under the rule. Mr. Chairman, I also want to thank my subcommittee chairman, Mr. Lamborn, for his leadership on this, and Mr. McClintock for bringing the…

Doug Lamborn
Rep. Doug LambornR-CO-5 · Jun 22, 2017

Mr. Speaker, I ask unanimous consent that all Members may have 5 legislative days in which to revise and extend their remarks and to include extraneous material on the bill. Mr. Chairman, I yield…

Jim Costa
Rep. Jim CostaD-CA-16 · Jun 22, 2017

Mr. Chair, this is an issue that is, I think, one of most important long-term issues that we deal with not only in California and Western States but, really, in the world, because the fact is that…

Kevin McCarthy
Rep. Kevin McCarthyR-CA-23 · Jun 22, 2017

Mr. Chair, I thank the gentleman for yielding, and I thank him for his work on this. Mr. Chairman, I always get excited when I hear people speak on the floor, especially when they come from…

Lloyd Doggett
Rep. Lloyd DoggettD-TX-35 · Jun 21, 2017

Will the gentleman yield? Mr. Speaker, I would just ask the gentleman a couple questions to underline a couple of the really important points you made about the context in which this bill is…

Steny H. Hoyer
Rep. Steny H. HoyerD-MD-5 · Jun 15, 2017

Mr. Speaker, before I yield to the gentleman from California (Mr. McCarthy) for the purpose of asking the majority leader the schedule for the week to come, I want to just make a comment. Yesterday,…

Show 11 more
Bill Pascrell, Jr.
Rep. Bill Pascrell, Jr.D-NJ-9 · Jun 21, 2017

Mr. Speaker, I rise in opposition to the rule. Here we are again. We are debating a bill to roll back regulations that protect the public, if I am not mistaken, Mr. Speaker. I think we are a little…

Paul A. Gosar
Rep. Paul A. GosarR-AZ-4 · Jun 22, 2017

Mr. Chairman, I rise today in strong support of H.R. 1654, legislation sponsored by my good friend and colleague, Tom McClintock. For centuries, Western States have fought over scarce water supplies.…

Dana Rohrabacher
Rep. Dana RohrabacherR-CA-48 · Jun 22, 2017

Mr. Chair, I thank my colleague from California for supporting this very important legislation. We all, all of us in California, have experienced what happens when you have radical environmentalist…

Joe Barton
Rep. Joe BartonR-TX-6 · Jun 22, 2017

Mr. Speaker, as we all know, last Thursday evening, we played the annual Congressional Baseball Game for Charity. This is normally the time when the losing manager has to congratulate the winning…

Michael F. Doyle
Rep. Michael F. DoyleD-PA-14 · Jun 22, 2017

Mr. Speaker, I thank the gentleman for yielding. This is different from the other years that we have stood up here. This trophy isn't for either team. This trophy is for Steve. I just want you all to…

Ken Buck
Rep. Ken BuckR-CO-4 · Jun 21, 2017

Mr. Speaker, I thank the gentleman from Washington (Mr. Newhouse), my colleague on the Rules Committee, for yielding. Mr. Speaker, in the West, water is life. Coloradans must wisely steward the…

Billy Long
Rep. Billy LongR-MO-7 · Jun 26, 2017

Mr. Speaker, on Wednesday, June 21, 2017, Thursday, June 22, 2017, and Friday, June 23, 2017, I was unable to vote on any legislative measures due to having surgery on my foot. Had I been present, I…

Scott R. Tipton
Rep. Scott R. TiptonR-CO-3 · Jun 22, 2017

Mr. Chairman, I would like to thank my colleague, Representative McClintock, for putting forward a very sensible piece of legislation. The Colorado Water Congress, who supports this bill, stated in…

Grace F. Napolitano
Rep. Grace F. NapolitanoD-CA-32 · Jun 21, 2017

Mr. Speaker, I was absent during roll call votes No. 311, No. 312, and No. 313 due to my spouse's health situation in California. Had I been present, I would have voted ``nay'' on the Motion to Table…

Brian Higgins
Rep. Brian HigginsD-NY-26 · Jun 22, 2017

Mr. Speaker, on June 21, 2017, I was not present for the recorded votes on Roll Call Nos. 311, 312, 313, 314, and 315. Had I been present, I would have voted: NAY on the motion to table the appeal of…

Grace F. Napolitano
Rep. Grace F. NapolitanoD-CA-32 · Jun 22, 2017

Mr. Speaker, I was absent during rollcall votes No. 318 and No. 319 due to my spouse's health situation in California. Had I been present, I would have voted ``yea'' on the Lowenthal Amendment. I…

Bill Text

4 versions available

Reading Mode
Latest
Referred in SenateIssued June 26, 2017

IIB

115th CONGRESS

1st Session

H. R. 1654

IN THE SENATE OF THE UNITED STATES

June 26, 2017

Received; read twice and referred to the Committee on Energy and Natural Resources

AN ACT

To authorize the Secretary of the Interior to coordinate Federal and State permitting processes related to the construction of new surface water storage projects on lands under the jurisdiction of the Secretary of the Interior and the Secretary of Agriculture and to designate the Bureau of Reclamation as the lead agency for permit processing, and for other purposes.


1.

Short title

This Act may be cited as the Water Supply Permitting Coordination Act.

2.

Definitions

In this Act:

(1)

Bureau

The term Bureau means the Bureau of Reclamation.

(2)

Cooperating agencies

The term cooperating agency means a Federal agency with jurisdiction over a review, analysis, opinion, statement, permit, license, or other approval or decision required for a qualifying project under applicable Federal laws and regulations, or a State agency subject to section 3(c).

(3)

Qualifying projects

The term qualifying projects means new surface water storage projects in the States covered under the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) constructed on lands administered by the Department of the Interior or the Department of Agriculture, exclusive of any easement, right-of-way, lease, or any private holding, unless the project applicant elects not to participate in the process authorized by this Act. Such term shall also include State-led projects (as defined in section 4007(a)(2) of the WIIN Act) for new surface water storage projects in the States covered under the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) constructed on lands administered by the Department of the Interior or the Department of Agriculture, exclusive of any easement, right-of-way, lease, or any private holding, unless the project applicant elects not to participate in the process authorized by this Act.

(4)

Secretary

The term Secretary means the Secretary of the Interior.

3.

Establishment of lead agency and cooperating agencies

(a)

Establishment of lead agency

The Bureau is established as the lead agency for purposes of coordinating all reviews, analyses, opinions, statements, permits, licenses, or other approvals or decisions required under Federal law to construct qualifying projects.

(b)

Identification and establishment of cooperating agencies

The Commissioner of the Bureau shall—

(1)

identify, as early as practicable upon receipt of an application for a qualifying project, any Federal agency that may have jurisdiction over a review, analysis, opinion, statement, permit, license, approval, or decision required for a qualifying project under applicable Federal laws and regulations; and

(2)

notify any such agency, within a reasonable timeframe, that the agency has been designated as a cooperating agency in regards to the qualifying project unless that agency responds to the Bureau in writing, within a timeframe set forth by the Bureau, notifying the Bureau that the agency—

(A)

has no jurisdiction or authority with respect to the qualifying project;

(B)

has no expertise or information relevant to the qualifying project or any review, analysis, opinion, statement, permit, license, or other approval or decision associated therewith; or

(C)

does not intend to submit comments on the qualifying project or conduct any review of such a project or make any decision with respect to such project in a manner other than in cooperation with the Bureau.

(c)

State authority

A State in which a qualifying project is being considered may choose, consistent with State law—

(1)

to participate as a cooperating agency; and

(2)

to make subject to the processes of this Act all State agencies that—

(A)

have jurisdiction over the qualifying project;

(B)

are required to conduct or issue a review, analysis, or opinion for the qualifying project; or

(C)

are required to make a determination on issuing a permit, license, or approval for the qualifying project.

4.

Bureau responsibilities

(a)

In general

The principal responsibilities of the Bureau under this Act are—

(1)

to serve as the point of contact for applicants, State agencies, Indian tribes, and others regarding proposed qualifying projects;

(2)

to coordinate preparation of unified environmental documentation that will serve as the basis for all Federal decisions necessary to authorize the use of Federal lands for qualifying projects; and

(3)

to coordinate all Federal agency reviews necessary for project development and construction of qualifying projects.

(b)

Coordination process

The Bureau shall have the following coordination responsibilities:

(1)

Preapplication coordination

Notify cooperating agencies of proposed qualifying projects not later than 30 days after receipt of a proposal and facilitate a preapplication meeting for prospective applicants, relevant Federal and State agencies, and Indian tribes—

(A)

to explain applicable processes, data requirements, and applicant submissions necessary to complete the required Federal agency reviews within the timeframe established; and

(B)

to establish the schedule for the qualifying project.

(2)

Consultation with cooperating agencies

Consult with the cooperating agencies throughout the Federal agency review process, identify and obtain relevant data in a timely manner, and set necessary deadlines for cooperating agencies.

(3)

Schedule

Work with the qualifying project applicant and cooperating agencies to establish a project schedule. In establishing the schedule, the Bureau shall consider, among other factors—

(A)

the responsibilities of cooperating agencies under applicable laws and regulations;

(B)

the resources available to the cooperating agencies and the non-Federal qualifying project sponsor, as applicable;

(C)

the overall size and complexity of the qualifying project;

(D)

the overall schedule for and cost of the qualifying project; and

(E)

the sensitivity of the natural and historic resources that may be affected by the qualifying project.

(4)

Environmental compliance

Prepare a unified environmental review document for each qualifying project application, incorporating a single environmental record on which all cooperating agencies with authority to issue approvals for a given qualifying project shall base project approval decisions. Help ensure that cooperating agencies make necessary decisions, within their respective authorities, regarding Federal approvals in accordance with the following timelines:

(A)

Not later than 1 year after acceptance of a completed project application when an environmental assessment and finding of no significant impact is determined to be the appropriate level of review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).

(B)

Not later than 1 year and 30 days after the close of the public comment period for a draft environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), when an environmental impact statement is required under the same.

(5)

Consolidated administrative record

Maintain a consolidated administrative record of the information assembled and used by the cooperating agencies as the basis for agency decisions.

(6)

Project data records

To the extent practicable and consistent with Federal law, ensure that all project data is submitted and maintained in generally accessible electronic format, compile, and where authorized under existing law, make available such project data to cooperating agencies, the qualifying project applicant, and to the public.

(7)

Project manager

Appoint a project manager for each qualifying project. The project manager shall have authority to oversee the project and to facilitate the issuance of the relevant final authorizing documents, and shall be responsible for ensuring fulfillment of all Bureau responsibilities set forth in this section and all cooperating agency responsibilities under section 5.

5.

Cooperating agency responsibilities

(a)

Adherence to Bureau schedule

(1)

Timeframes

On notification of an application for a qualifying project, the head of each cooperating agency shall submit to the Bureau a timeframe under which the cooperating agency reasonably will be able to complete the authorizing responsibilities of the cooperating agency.

(2)

Schedule

(A)

Use of timeframes

The Bureau shall use the timeframes submitted under this subsection to establish the project schedule under section 4.

(B)

Adherence

Each cooperating agency shall adhere to the project schedule established by the Bureau under subparagraph (A).

(b)

Environmental record

The head of each cooperating agency shall submit to the Bureau all environmental review material produced or compiled in the course of carrying out activities required under Federal law, consistent with the project schedule established by the Bureau under subsection (a)(2).

(c)

Data submission

To the extent practicable and consistent with Federal law, the head of each cooperating agency shall submit all relevant project data to the Bureau in a generally accessible electronic format, subject to the project schedule established by the Bureau under subsection (a)(2).

6.

Funding to process permits

(a)

In general

The Secretary, after public notice in accordance with subchapter II of chapter 5, and chapter 7, of title 5, United States Code (commonly known as the Administrative Procedure Act), may accept and expend funds contributed by a non-Federal public entity to expedite the evaluation of a permit of that entity related to a qualifying project.

(b)

Effect on permitting

(1)

Evaluation of permits

In carrying out this section, the Secretary shall ensure that the evaluation of permits carried out using funds accepted under this section shall—

(A)

be reviewed by the Regional Director of the Bureau of the region in which the qualifying project or activity is located (or a designee); and

(B)

use the same procedures for decisions that would otherwise be required for the evaluation of permits for similar projects or activities not carried out using funds authorized under this section.

(2)

Impartial decisionmaking

In carrying out this section, the Secretary and the head of each cooperating agency receiving funds under this section for a qualifying project shall ensure that the use of the funds accepted under this section for the qualifying project shall not—

(A)

substantively or procedurally impact impartial decisionmaking with respect to the issuance of permits; or

(B)

diminish, modify, or otherwise affect the statutory or regulatory authorities of the cooperating agency.

(c)

Limitation on use of funds

None of the funds accepted under this section shall be used to carry out a review of the evaluation of permits required under subsection (b)(1)(A).

(d)

Public availability

The Secretary shall ensure that all final permit decisions carried out using funds authorized under this section are made available to the public, including on the Internet.

Passed the House of Representatives June 22, 2017.

Karen L. Haas,

Clerk