Mr. President, I thank the Chair. Cape Wind Facility in Nantucket Sound Mr. President, I am here to discuss the provision in the Coast Guard and Maritime Transportation Act of 2006 and the provision which allows the State of Massachusetts…
Mr. President, I thank the Chair.
Cape Wind Facility in Nantucket Sound
Mr. President, I am here to discuss the provision in the Coast Guard and Maritime Transportation Act of 2006 and the provision which allows the State of Massachusetts to have a say in the siting of a 24-square- mile, 130-wind turbine energy facility.
I have a chart I want to use and describe.
First, let me say why the Senator from Alaska is involved in this issue. What I am trying to say is that this is a tremendous precedent.
We have a series of areas of various States where there is a gap in State jurisdiction and where Federal waters are adjacent to and sometimes almost surrounding State waters. That is particularly true in my State. With the Cook Inlet on either side of Kalgin Island, there are gaps of Federal waters surrounded by the mainland of Alaska going down the inlet.
The Minerals Management Service tells us there are roughly 2.5 million acres of Federal waters going down that inlet that could be used for projects such as I am going to discuss today.
A similar situation exists with Chandeleur Island, LA; the Channel Islands in California; the Farallon Islands in California; the Hawaiian Islands in many instances; and in Puerto Rico.
What I am here to talk about is the precedent that would be established by locating this facility in Nantucket Sound, less than 2 miles beyond the State of Massachusetts' jurisdiction.
If we look at this chart, you can see very clearly the area with the darkest color on the chart, which is the proposed site of this power facility. It is 9 miles from one part of Massachusetts, 13.8 miles from the other side, and 6 miles from the other direction.
When you look at the situation, we realize the State has jurisdiction over at least 3 miles in that area.
This is very close to the area of Massachusetts where people have a right to be concerned over this project. Before the Federal Government claimed ownership of this area, there was a judicial dispute over which government had jurisdiction over it. I am informed that the State of Massachusetts had established a marine park in this area. As a matter of fact, it was listed as part of a proposed marine sanctuary, even in the Federal listings. It is now the proposed site for the largest and most expansive offshore wind energy project ever undertaken in the world.
This facility would include turbines that stand 417 feet tall.
This is a chart that describes it. Those windmills would be 417 feet tall, taller than the Statue of Liberty. The one little point at the bottom shows a 30-foot sailboat. You can see the size of it. People sail their boats that size on Nantucket Bay, and the Great Point Lighthouse is supposed to keep sailors and mariners warned about the area. It is only 73 feet tall.
When you look this area, it is 24 miles across, more than half the size of Boston Harbor itself. It is going to be the site of this enormous facility.
As I said, it is larger than any similar kind of wind energy project in the world.
It is a very small area of Federal jurisdiction, completely surrounded by the mainland and islands of Massachusetts.
Some in the media have insinuated that by including this provision in the Coast Guard and Maritime Transportation Act, I am doing it as an old friend to Senator Ted Kennedy. He is an old friend. It is true that Senator Kennedy and the Governor of Massachusetts support the provision in the Coast Guard bill, but this is my amendment. They have agreed with me. I didn't seek their agreement. It is not an issue based on friendship or on past favors or future favors. It is strictly a provision based upon my long-held belief that States should have the final say on projects which will directly impact their lands, resources, and constituents.
Some in the press have claimed this provision is embedded in ``obscure legislation to be passed in the dead of the night.'' We hear this all the time. But the Coast Guard authorization bill is hardly obscure legislation, and there is nothing secretive about this bill.
The version of this bill that passed the House of Representatives included a provision related to offshore wind farms. It was in the House-passed bill to start with. The House and the Senate, in a bicameral, bipartisan group of Members of a conference committee, discussed and negotiated language to provide the State of Massachusetts a greater voice in the siting of this windmill farm in Nantucket Sound.
This bicameral, bipartisan group also negotiated language requiring the Coast Guard to assess the potential navigational impacts of the proposed offshore powerplant.
This is the normal legislative process for passing legislation of this type through the Congress.
Again, let me point out this chart. I don't live in this area, but I have studied it very well. This is the path the ferries take coming out of these areas and going through this sound, and it is the path which the commercial traffic, steamships, and cargo ships use going into that port.
As a consequence of this location, this line demonstrates the State's jurisdiction and how close it is to the State's jurisdiction. As a matter of fact, the area that is has been lined shows the previous plan which would have gone partially into the State's jurisdiction. The project was amended, so it does not touch the State waters or State jurisdiction areas at all.
It is this area of solid brown on this chart.
By the way, this is the very shallow portion of this area. There is no question about it. Nantucket Island is out here. But there are equally shallow portions outside of the sound that could have been used. But, of course, it is deeper going in there, and that access to this interior part of this sound I think is strictly a financial decision.
At the heart of the debate on the issue is States' rights. The fact is this project will be located entirely in the sound--in this small doughnut hole of the Federal water surrounded by islands and mainland of the State of Massachusetts.
The debate over this project is similar to the fights those of us in Alaska have been engaged in for decades. Our State lands are surrounded by Federal lands, and we often don't have any decision regarding the development of our resources or projects which will be located in our State.
This is one of those situations where Congress ought to listen to the Governor. They ought to listen to the senior Senator, in my opinion.
Those in Massachusetts have raised legitimate concerns about the impact of this wind farm and what its impact will be on maritime navigation, aviation, and radar installations critical to our homeland security.
This proposed site is an area already known for its treacherous flight conditions, and this facility could make those conditions much worse. According to the National Air Traffic Controllers Association, this facility will be located in the flight path of thousands
of small planes. Both the Barnstable and Nantucket Airport Commissions are opposed to the construction of this facility, as are the major ferry lines that operate in Nantucket Sound.
As the chart I have described shows, ferry routes pass within a mile of the proposed location for this project on two sides. The 24-square- mile footprint for this facility is nearly half the size of Boston Harbor, a 471-foot wind farm.
Again, those windmills are larger than this building. Those windmills are larger than the Capitol.
You have to get the specter of this size being built in the center of this sound. It is a 24-square-mile footprint for this facility. As I have said, it is half the size of Boston Harbor and has shipping and ferry channels bordering on three sides.
There is not a single local fishing group from Massachusetts that supports this project, I am informed. It would effectively close a 24- mile-square-mile footprint of many kinds of fishing that has taken place in this sound for generations. Horseshoe Shoal, where the facility will be built, is one of the most productive fishing grounds in the area. That means this area produces offspring. This is where the fish spawn.
The impact of the shoal will be significant. The piling for each one of these windmills--there are 130 of them--are 16 feet in diameter and will be bored down into the shoal to a depth of about 80 feet. This productive area will be littered with 130 drilled holes. Each piling will occupy 2 acres of productive fishing ground. Navigating in and around 130 turbines will make fishing and fishing reproduction in this area nearly impossible.
In addition, these turbines will make Coast Guard search and rescue missions much more difficult in this area, already known for severe weather and sea conditions in parts of the year.
Those in Massachusetts raise another important point. Developing a wind farm of this size and scale offshore has never been done before, let alone in an environment as extreme as the waters of the North Atlantic.
To put this challenge in perspective, it helps to compare the Massachusetts project to the wind farm currently operating in Palm Springs, CA. I know a little bit about this. I have gone into that town several times by air. That facility stands 150 feet at the tallest point. The blades are half the length of a football field, but they are one-third of this size. Even on dry land and a relatively calm desert climate, the Palm Springs wind farm has been plagued by serious maintenance complications. Many of the turbines require constant maintenance and repair.
Put that in the Massachusetts Sound. They require maintenance and repair constantly. This Massachusetts project would require maintenance and repair to take place in icy waters of Nantucket Sound. The size of the windmills for this facility would dwarf the existing land-based wind projects. The windmills in Nantucket Sound would stand nearly three times as tall as those in Palm Springs, with wind blades over a football field in length. Just the blade is a football field in length.
Now, given the legitimate issues raised by the people of Massachusetts and their representative, I believe it is only fair to allow the State to have an equal voice in the debate over the siting of this project. Nantucket Sound, as I have said, is not the only place where a project of this kind can be built. In Europe, deepwater wind energy technologies are currently being developed as far out as 15 miles in 138 feet of water. Placing wind energy facilities further from their shore reduces their impact on maritime navigation.
If this 24-square-mile wind farm is built further away from shore, there would be a number of benefits. It would be removed from boating, fishing, ferrying, shipping channels, reducing the risk of collision and reducing the potential impact on the navigation which we have asked the Coast Guard to look into.
I do support America's use of alternative energy sources, including wind farms and wind power. I have supported wind projects in the past during my time as chairman of the Senate Committee on Appropriations. Our committee appropriated over $105 million for wind projects in fiscal year 2002 to fiscal year 2006. There was even one in my State around Kotzebue.
It is the right of a State to determine if this type of project is consistent with its efforts to protect its resources. I believe Congress should defer to the judgment of the Massachusetts congressional delegation, the Governor of Massachusetts, and the people of Massachusetts on this matter. States should have a say in the activities taking place in the waters adjacent to their shores. This location, in particular, deserves special consideration due to the geographic peculiarities of the region.
California blocked oil platforms, Oregon and Washington blocked them before they were even built.
We now have a dispute before the Congress over a potential development of gas resources 170 miles off the State of Florida. This is 3 miles. This is within a sound that is one of the--I have only been there two or three times, but it is a place if you ever go to it you would not forget. It is not a place that deserves to have this impact. The residents of Massachusetts will have to live with the impact of this project. They must have a greater role in determining the fate of this treasured area.
This bill, H.R. 889, as agreed to by the conference committee, rightly awards the State of Massachusetts this greater authority in the decisions regarding this project. So I am here today to urge the House and the Senate to listen to the people of Massachusetts and particularly to listen to their senior Senator.
I am pleased to yield whatever time I have remaining. I think I have only another 10 minutes or so. I yield to the Senator from Massachusetts.
I think we have 30 minutes on this side and 30 minutes on that side, is that correct?
Is there time on the Democratic side for the Senator from Massachusetts?
We will work that out.
I talked too long.
That is right.
I believe the Senator is correct.